Insulated Panel Cool Rooms SWMS

Insulated Panel Cool Room Safe Work Method Statements (SWMS)

People often ask, “Can I have a Safe Work Method Statements (SWMS) for building a cool room?” “A document that covers everything?”  The answer is not really. 

A Safe Work Method Statements (SWMS) needs to document step by step how you are going to do a particular job. Not all jobs are the same! Are you going to build a simple cool room by hand, manually lifting the panels and standing them up, or building a cold storage facility using a forklift, telehandler or a vacuum lifter?

The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential hazards and the hazard control measures are very different as well.

Insulated Panel Cool Rooms and Freezers for Cold Storage.

Hazards Associated with Installing Insulated Panel Cool Rooms and Freezers

Insulated panels are generally installed as a completed wall with doorway and window openings cut in after installation.
Pallet racking is widely used in cold storage facilities.
Insulated Panel Eternal Doors with thermal breaks to stop cold tracing and heat transfer

The installation of insulated panel cool rooms and freezers comes with several significant hazards that workers and businesses must consider to ensure safety and compliance with regulations. These hazards can result in serious injuries, property damage, or long-term health risks if not properly managed. Below are some of the key hazards to be aware of:

Manual Handling Risks
Insulated panels are often large, heavy, and awkward to handle. Lifting and positioning them can lead to musculoskeletal injuries such as strains, sprains, and back injuries. Using mechanical aids, team lifting, and proper manual handling techniques are essential to reduce these risks.

Falls from Height
Workers may need to work at elevated levels to install insulated panels on walls or ceilings. Without proper fall protection, such as harnesses, guardrails, or elevated work platforms, the risk of falling from height is significant, potentially leading to severe injuries or fatalities.

Electrical Hazards
Many cool rooms and freezers require electrical connections for lighting, cooling systems, and other components. Workers are exposed to electrical hazards when installing or connecting these systems, particularly if the area is wet or moisture-prone, which can increase the risk of electric shock.

Confined Space Hazards
Installing panels in small, enclosed areas may expose workers to confined space risks, such as reduced oxygen levels, limited ventilation, and difficulties in accessing or exiting the area quickly in case of emergency.

Slips, Trips, and Falls
The installation process often creates obstacles such as loose panels, tools, and materials that can become trip hazards. Slippery surfaces from condensation or refrigerants can also lead to slips. Keeping the worksite clean and organized helps mitigate these risks.

Thermal Stress and Exposure
Working in or around cool rooms or freezers exposes workers to extreme cold, which can lead to hypothermia, frostbite, or other cold-related health issues. Proper personal protective equipment (PPE), including insulated gloves, clothing, and footwear, is necessary to prevent these risks.

Fire and Explosion Risks
The insulation materials used in cool rooms, such as foam panels, can be flammable if not correctly installed. Improper handling of refrigerants or other combustible materials in a confined space increases the risk of fire or explosion.

Noise Exposure
The tools and machinery used to cut and install insulated panels, as well as the refrigeration units, may generate high noise levels. Prolonged exposure to these noises can lead to hearing damage, making the use of appropriate hearing protection critical.

Chemical Exposure
Insulated panels often involve adhesives, solvents, and sealants that can emit harmful fumes during installation. These chemicals can pose risks such as respiratory irritation, skin contact hazards, or longer-term health effects. Proper ventilation and PPE, like masks and gloves, are essential to reduce exposure.

Cutting and Sharp Edges
Insulated panels need to be cut to size, which involves the use of saws and cutting tools. Improper handling of tools or sharp edges on panels can lead to cuts, lacerations, or more severe injuries.

Crushing
There is the risk of crushing a person between a suspended panel and a fixed object when lifting panels using a forklift, telehandler or crane.

 

By identifying and mitigating these hazards through risk assessments, proper planning, and the implementation of safety controls, businesses can ensure a safer working environment for those involved in installing insulated panel cool rooms and freezers.

Under the WHS act you must prepare a SWMS for High-Risk Construction Work. 

There are 18 high risk construction work activities defined in the WHS Regulations.

When undertaking Insulated Panel work common high-risk activities include:

  • Risk of a person falling more than 2 metres
  • Work in an area with movement of powered mobile plant

 A SWMS provides a clear, step-by-step guide on how to perform a task safely.

It ensures that everyone involved understands the necessary steps, reducing the likelihood of accidents due to confusion or misunderstanding.
 
The JSEAsy Safety Management Software builds your site-specific SWMS for your Insulated Panel job by adding templates of the steps you are going to take, in the order in which you are going to take them.
 

Watch a detailed demonstration video on how to create a new site-specific SWMS using existing templates.

Making SWMS has never been easier, just pick your job steps and the JSEAsy safety management software does all the hard work for you.

Vertical Lift doors inside a Cold Storage Facilities using Insulated Panels
A SWMS must reflect the specific circumstances of the workplace in which it will operate.
High-Risk construction work covered in this SWWMS and permits required
The hierarchy of controls prioritizes eliminating hazards, followed by substitution, engineering controls, administrative controls, and personal protective equipment (PPE).
The process steps, potential hazards and hazard control measures to be implemented are documented in your SWMS here
SWMS Worker Qualifications and Induction Record signoff page

JSEA/ SWMS Example

Below is an example of templates you may insert into your site-specific SWMS for the Installation of a ducted split system air conditioner.

  1. Site Orientation/ Induction
  2. Claim work area
  3. Site Emergency Response Procedure
  4. Working where there is movement of powered mobile plant
  5. Safety inspection and use of Telehandler
  6. Safety Check and Use of Scissor Lift
  7. Working with silica and silica containing products
  8. Cut aluminium sections using an electric mitre saw
  9. Mark out slab using a chalk line
  10. Fix aluminium sections to existing slab
  11. Lift insulated panels onto sawhorses/ trestles with a forklift
  12. Cut Insulated Panel with a circular/ cold saw
  13. Lift insulated panels using a lifting jib and vacuum lifter/Cladboy
  14. Load materials/members into scissor lift
  15. Install insulated ceiling panels to cool room
  16. Fit angles and trims using a battery powered drill and pop rivets
  17. Apply silicone or mastic to fixing angles and joints
  18. Cleaning up work area
  19. Monitoring and Review of SWMS

 

Automating the process

When you insert a template, it automatically brings with it:

  1. The main process step
  2. The sub process steps associated in undertaking the task
    1. The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
    2. The Risk Rating for undertaking the task (You can also change this if you want to)
    3. The Hazard Control measure (you can also delete or add any of these with a simple click)
    4. The revised risk rating after applying the control (You can also change this if you want to)
    5. Any required PPE (you can also delete or add any of these with a simple click)
    6. Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
    7. Any preoperational inspections required (you can also delete or add any of these with a simple click)
    8. Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
SWMS Risk Matrix, electrical tool testing tags and mandatory PPE

Creating Site-Specific SWMS Reports with JSEAsy Safety Management Software

Creating a site-specific SWMS is easy using JSEAsy . Once created, you can print/ save a pdf of either a full or simplified SWMS report. 

Download an example of a full SWMS report generated from the JSEAsy EHS Software.

Download an example of a simplified SWMS report generated from the JSEAsy EHS Software.

The JSEAsy software comes preloaded with hundreds of templates (job steps) to build your site-specific SWMS with.

Safe Operating Procedures (SOP) and Plant and Equipment Risk Assessments (PERA) are also included in all versions.

The JSEAsy Premium EHS Software is your total WHS management system.

The JSEAsy safety management software is available for download and install on a PC, or hosted in the cloud

Safety in Design with Insulated Panels by applying graphics to highlight an exit.
Vertical Lift door rollers and seals inside a Cold Storage Facilities using Insulated Panels

JSEAsy Environmental Health and Safety (EHS) Software

Process: Click the Links below to learn more about JSEAsy Safety Management Software and the process.

View an Infographic about How JSEAsy Software works.

See the different versions of the JSEAsy software.

When you buy or Rent JSEAsy you have access to all of the latest version SWMS templates, for all trades and industries.

Download the JSEAsy latest version SWMS template register.

This is a register sorted by industry type and industry specific of all of the SWMS templates included in the latest version of the JSEAsy Safety Management Software.

Save time and Money!

Hundreds of templates included – 1 low price – Exceptional value!

When you buy or rent the JSEAsy Safety Software, not only to get all the templates specifically for insulated panels but you also get all the templates for all the other industries and trades as well. Insulated Panel contractors don’t just stand-up panels!

You will also benefit from many of the refrigeration, electrical, mechanical and concreting templates. There are also multiple templates under Roof Plumbing that will be of use. You may benefit from many other industry and trade templates if you are doing a complete rebuild including demolition of the existing structure and a new cool room including under floor heating, floor insulation, wearing slab, refrigeration and wall protection. 

Over 1000 SWMS templates for a myriad of industries are included in the JSEAsy SWMS software.

A list of all the templates included in all versions of the JSEAsy EHS software is shown below.

  • You can search by scrolling through the list of all templates.
  • You can apply filters to the list by selecting an Industry Type
  • You can further refine the list by selecting and industry type and an industry specific.
  • You can do key word searches for templates.  If you can’t find what you are looking for try:
    • Shortening the search term. For example, searching for “deliv” would show deliver and deliveries, but if you searched for deliveries, it would exclude deliver.
    • Look for a synonyms/ alternate word for what you are looking for. E.g. tube or pipe
IndustryTypeIndustrySpecificWorkDescription
AdministrationOfficePhotocopying
All Industry TypesAll TradesAcceptance of delivery to site for materials
All Industry TypesAll TradesSweeping Floor or ground
All Industry TypesAll TradesSite Orientation/ Induction
All Industry TypesAll TradesWrite up incident report
All Industry TypesAll TradesSafety inspection and use of Forklift
All Industry TypesAll TradesSite orientation of domestic residence
All Industry TypesAll TradesVacuum
All Industry TypesAll TradesConnect hose to existing water supply tap
All Industry TypesAll TradesMonitoring and Review of SWMS
All Industry TypesAll TradesInspect and drive passenger/ light commercial vehicle
All Industry TypesAll TradesAccept load to vehicle from forklift (3rd Party operator) and Loading by hand
All Industry TypesAll TradesCharging of Li-Ion batteries for use with cordless tools
All Industry TypesAll TradesUnloading of shipping container with forklift and by hand
All Industry TypesAll TradesWorking in hot conditions
All Industry TypesAll TradesMonitoring and review of JHA
All Industry TypesAll TradesWorking in Cold Conditions
All Industry TypesAll TradesWorking in the rain
All Industry TypesAll TradesListening to music while working
All Industry TypesAll TradesWorking in High Wind Conditions
All Industry TypesAll TradesDriving in and out of carparks and on customer premises
All Industry TypesAll TradesDriving in and out of carparks and on customer premises
All Industry TypesAll TradesWorking in an area with the risk of Coronavirus, Covid-19, Influenza or similar
All Industry TypesAll TradesCutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool
All Industry TypesAll TradesWorking outdoors in hot conditions
All Industry TypesAll TradesElectrical Safety
Automotive and PlantMechanicalServicing to vehicle in workshop
Automotive and PlantMechanicalInspection and use of Four Post Vehicle Hoist
Automotive and PlantMechanicalInspection and use of Two Post Vehicle Hoist
Automotive and PlantMechanicalon site Servicing to diesel powered vehicle
Automotive and PlantMechanicalReplace diesel fuel filters
Automotive and PlantMechanicalReplace petrol fuel filters
Automotive and PlantMechanicalSafety inspection and use of TTX Hydraulic Torque Wrench and hydraulic pump
Automotive and PlantMechanicalSafety inspection and use of TTS Hydraulic Torque Wrench and hydraulic pump
Automotive and PlantMechanicalSafety inspection and use of TTL Hydraulic Torque Wrench and hydraulic pump
Automotive and PlantMechanicalReplace fuel filters
Automotive and PlantServicingServicing to hybrid industrial automatic ride on sweeper/scrubber (Complete job)
Automotive and PlantServicingReplace engine oil and filters
Automotive and PlantServicingCheck batteries and charging system
Automotive and PlantServicingReplace hydraulic oil and filters
Automotive and PlantServicingReplace radiator coolant
Automotive and PlantServicingJack up vehicle/machine
Automotive and PlantServicingInspection and use of petrol powered air compressor
Automotive and PlantServicingRemove and replace wheels using a pneumatic rattle gun
Automotive and PlantServicingReplace brake pads using a pneumatic rattle gun
Automotive and PlantServicingInspect/ Repair skirts and scrubber or sweeping brushes
Automotive and PlantServicingReplace hydraulic hose
Automotive and PlantServicingGrease moving parts and greaseable joints
Automotive and PlantServicingTune engine
Automotive and PlantServicingservicing a ride on electric sweeper (Complete Job)
Automotive and PlantServicingservicing a walk gas operated behind sweeper/scrubber (Complete Job)
Automotive and PlantServicingChange Spark Plugs
Automotive and PlantServicingReplace air filter
Automotive and PlantServicingOpen engine cover/ bonnet/ service compartment
Automotive and PlantServicingCheck system for gas leaks
Automotive and PlantServicingServicing to hybrid industrial automatic ride on sweeper/scrubber
Automotive and PlantServicingon site Servicing to petrol powered vehicle
Automotive and PlantServicingInspection and use of a gasoline powered air compressor
Automotive and PlantServicingOn site Servicing to gasoline powered vehicle
CleaningDomestic CleaningMopping Floor
CleaningCommercial CleaningCleaning of hard surfaces
CleaningCommercial CleaningCleaning of Rest Rooms / Toilets
CleaningCommercial CleaningRemove bag from bins and waste paper baskets
CleaningCommercial CleaningSteam cleaning of tiles
CleaningCommercial CleaningInspection and use of planetary floor polisher
CleaningCommercial CleaningClean bathroom
CleaningCommercial CleaningClean Glass shower screen with a cloth
CleaningCommercial CleaningClean Glass with a cloth
CleaningCommercial CleaningClean mirror with a cloth
CleaningCommercial CleaningCleaning of residence
CleaningCommercial CleaningClean Windows with mop and squeegee
CleaningCommercial CleaningClean Window Using Pure Water Technology
CleaningCommercial CleaningClean Windows Using rope Access
CleaningCommercial CleaningGain access to work are using Rope Access
CleaningCommercial CleaningInspection and use of walk behind battery powered floor scrubber
CleaningCommercial CleaningInspection and use of High-Speed Propane (LPG) Powered Floor Buffer (Burnisher)
CleaningCommercial CleaningInspection and use of Carpet Extractor
CleaningCommercial CleaningInspection and use of Low-Speed Electric Floor Buffer
CleaningCommercial CleaningCleaning of office and showroom
CleaningAll Cleaning industriesCarpet Cleaning
CleaningAll Cleaning industriesInspection and use of electric high pressure water sprayer
CleaningAll Cleaning industriesInspection and use of petrol powered blower/ vacuum
CleaningAll Cleaning industriesInspection and use of gasoline powered blower/ vacuum
CleaningAll Cleaning industriesInspection and use of gasoline powered high pressure water sprayer
ConstructionRoofingRe-Roofing
ConstructionRoofingVisual Inspection of Structure
ConstructionRoofingInstallation of Safety Mesh to roof area - From EWP
ConstructionRoofingInstall Temporary Edge Protection from an EWP
ConstructionRoofingLoading Roof Sheets or materials with Crane
ConstructionRoofingInstallation of insulation to roof
ConstructionRoofingInstalling Roof Sheets – To Flat Roof Area
ConstructionRoofingInstallation of Support Mesh to walls - Using Scissor Lift
ConstructionRoofingInstallation of Flashings using a battery powered drill
ConstructionRoofingInstallation of insulation to walls
ConstructionRoofingInstallation of wall sheeting from Ground and Scissor Lift
ConstructionRoofingInstalling External/ Internal Downpipes
ConstructionRoofingInstall Box Gutter with saddles straps and gutter board
ConstructionRoofingInstalling Rain Water Heads
ConstructionRoofingForm and Flash Roof Penetrations
ConstructionRoofingCutting Roof Sheets with snips
ConstructionRoofingInstallation of vent ridge
ConstructionRoofingInstall Pierced Fixed Roof Sheets using a battery powered drill
ConstructionRoofingRemoval of Asbestos products
ConstructionRoofingRoof Plumbing Servicing and Maintenance
ConstructionRoofingInstall Safety Anchors to an existing roof (Timber from above and below)
ConstructionRoofingRemoval of wall sheeting
ConstructionRoofingInstallation of fascia cladding - From a scissor lift
ConstructionRoofingInstallation of Soffit Sheeting - From EWP
ConstructionRoofingInstallation of Roof Sheets – To Sprung Curved Roof
ConstructionRoofingNew-Roofing (Domestic)
ConstructionRoofingRemoval of materials from roof area by hand - Using EWP
ConstructionRoofingMeasure Roofing using temporary Anchor Points
ConstructionRoofingPassing up Roof Sheets and Accessories from the ground
ConstructionRoofingInstallation of Metal Fascias from ladder
ConstructionRoofingInstallation of metal battens
ConstructionRoofingInstallation of Rain Water Head
ConstructionRoofingInstallation of Temporary Height Safety System to new roof
ConstructionRoofingInstallation of Safety Mesh to roof area - From Scaffold
ConstructionRoofingRemoval of existing roof flashings
ConstructionRoofingRemoval of Existing RWH
ConstructionRoofingMoving materials over the roof
ConstructionRoofingRemoval of existing Roof Sheeting and Accessories
ConstructionRoofingRemoval of existing ceiling flashings
ConstructionRoofingRemoval of Ceiling Sheets
ConstructionRoofingInstallation of Temporary Static Line
ConstructionRoofingInstallation of UPVC Pipe
ConstructionRoofingRemoval of Existing (Flat Roof)- Roof Sheeting
ConstructionRoofingRemoval of existing Blanket insulation
ConstructionRoofingInstallation of Air-Cell Insulation
ConstructionRoofingRemoval of existing Box Gutter
ConstructionRoofingRemoval of existing Ceiling Insulation from open roof
ConstructionRoofingInstallation of Safety Mesh to Roof From Roof and Scissor Lift on one side
ConstructionRoofingInstallation of wall sheeting from Ground and Boom Lift
ConstructionRoofingInstallation of fascia cladding - From a scaffold
ConstructionRoofingInstallation of Soffit Sheeting - From Scaffold
ConstructionRoofingInstallation of Safety Mesh from Roof
ConstructionRoofingInstallation of Temporary Height Safety System - to Existing roof from Scaffold
ConstructionRoofingRemoval of existing roof tiles
ConstructionRoofingInstallation of wall sheeting from Ground and Scaffold
ConstructionRoofingInstallation of metal Fascia
ConstructionRoofingInstallation of top hats to masonry wall
ConstructionRoofingInstallation of Roof walkway
ConstructionRoofingCreating Roof Penetrations
ConstructionRoofingInstallation of roof vents
ConstructionRoofingInstallation of Static line system
ConstructionRoofingInstallation of Anchorpoints to existing roof
ConstructionRoofingInstallation of concealed clip roof decking
ConstructionRoofingRemove and Reinstate Roof Screws
ConstructionRoofingRemove and reinstate Skylight sheeting
ConstructionRoofingRemove and reinstate dektites
ConstructionRoofingRemove all materials, equipment and waste from site
ConstructionRoofingInstallation of Eaves Gutters
ConstructionRoofingInstallation of Downpipes
ConstructionRoofingInstall Stone Sheeting
ConstructionRoofingRe-fall box gutter
ConstructionRoofingApply silicone to joint
ConstructionRoofingInstall top hats to steel structure
ConstructionRoofingLoad materials into boom lift
ConstructionRoofingCut Insulated Panel with a circular saw
ConstructionRoofingFit angles and trims using a battery powered drill and pop rivets
ConstructionRoofingCut metal roof sheets with electric shears
ConstructionRoofingCut metal roof sheets with battery powered shears
ConstructionRoofingCut metal wall sheets with battery powered shears
ConstructionRoofingInstall Temporary Edge Protection
ConstructionRoofingInstall variable pitch roof ventilators to metal roof
ConstructionRoofingInstallation of Temporary Height Safety System - starting from Scissor
ConstructionRoofingRemoval of existing Roof Sheeting and Accessories
ConstructionRoofingCleanout gutter by hand
ConstructionRoofingInstallation of Temporary Anchorpoints to existing roof
ConstructionRoofingRemoval of existing Roof Sheeting and Aceesories
ConstructionCivilSite Set Out
ConstructionCivilBack Fill trench by hand with original spoil
ConstructionCivilDelivery, Safety Check And Use Of Dingo
ConstructionCivilRemove spoil from auger using wheel barrow
ConstructionCivilDig Hole by hand
ConstructionCivilMixing concrete with a portable mixer
ConstructionCivilDig hole with power driven auger
ConstructionCivilCutting Bitumen with a Quick Cut Diamond blade saw
ConstructionCivilDig Trench by hand
ConstructionCivilSafety inspection and use of wheeled front end loader
ConstructionCivilSafety check and operation of Excavator
ConstructionCivilDelivery and unloading of mobile plant
ConstructionCivilUnload skid steer loader from trailer using aluminium ramps
ConstructionCivilLoad skid steer loader onto trailer using aluminium ramps
ConstructionCivilLoad skid steer loader onto truck using aluminium ramps
ConstructionCivilUnload skid steer loader from truck using aluminium ramps
ConstructionCivilSafety inspection and use of skid steer loader
ConstructionCivilRemove soil from domestic site using a skid steer loader and truck
ConstructionCivilArrive at domestic site with truck and trailer and establish unloading area
ConstructionCivilClean street and footpath
ConstructionCivilMove soil by hand using a shovel
ConstructionCivilRemove rubbish and debris from domestic site using skid steer loader and truck
ConstructionCivilInspect and drive Tip Truck/ Dump Truck
ConstructionCivilDumping/Unloading load on ground using a tip truck/ dump truck
ConstructionCivilSpread rubble around site using a skid steer loader
ConstructionCivilPlace rubble around domestic site using a skid steer loader
ConstructionCivilInstallation of lintel using a skid steer loader
ConstructionCivilArrive at domestic site with truck and establish unloading area
ConstructionCivilCompact area using a petrol powered vibrating plate
ConstructionCivilOperation of drilling rig and soil sampling
ConstructionCivilUnload skid steer excavator from trailer using aluminium ramps
ConstructionCivilDig trench using a chain trencher
ConstructionCivilBack Fill trench using excavator with original spoil
ConstructionCivilCompact area using a petrol powered leg rammer
ConstructionCivilSet up and use laser level
ConstructionCivilInspection and use of Motor Grader/ Road Grader
ConstructionCivilCompact area with Road roller (roller-compactor)
ConstructionCivilSafety check and operation of Excavator for trenching and excavations
ConstructionCivilLaying asphalt with paver which is filled from tipper
ConstructionCivilLaying blue metal paver which is filled from tipper
ConstructionCivilTack coating (including use of hand lance) prior to laying asphalt
ConstructionCivilRaising Sewer/ Stormwater Pits and Valve covers in an existing bitumen roadway
ConstructionCivilInspection and use of diesel powered air compressor
ConstructionCivilUsing a pneumatic Jack Hammer/ pneumatic Breaker/ Demolition Hammer
ConstructionCivilDaily preoperational inspection of a Pneumatic Jack Hammer
ConstructionCivilRemove and fit attachments on skid steer loader
ConstructionCivilRemove and fit attachments on Excavator
ConstructionCivilPlanning for wet weather and flooding events
ConstructionCivilSpreading soil with Shovel and Rake
ConstructionCivilCompact area using a gasoline powered leg rammer
ConstructionCivilCompact area using a gasoline powered vibrating plate
ConstructionCivilShore trench by Installing Hydraulic Shoring (Soldier set style)
ConstructionCivilInspection and use of Grader/ Scraper
ConstructionCivilBack Fill trench using excavator with sand and rubble
ConstructionCivilLift member into place using an excavator
ConstructionCivilSite environmental considerations
ConstructionCivilInstallation of Drag Box/ Trench Box Shoring using an excavator
ConstructionCarpentryManufacture timber wall frames using a mitre saw and Pneumatic (Air) Nail Gun
ConstructionCarpentryStand up wall frames
ConstructionCarpentryInstallation of Timber Purlins
ConstructionCarpentryCut timber using a circular saw
ConstructionCarpentryInstallation of Doors and Door Hardware
ConstructionCarpentryCut timber using a reciprocating saw
ConstructionCarpentryCut timber using a battery powered reciprocating saw
ConstructionCarpentryRemoval of existing doors
ConstructionCarpentryInspection and use of electric air compressor
ConstructionCarpentryCut timber using an electric mitre saw
ConstructionCarpentryNail timber using a pneumatic (Air) nail gun
ConstructionCarpentryNail timber using an Impulse (gas) Nail Gun
ConstructionCarpentryDaily preoperational inspection of a Pneumatic (Air) Nail Gun
ConstructionCarpentryDaily preoperational inspection of an Impulse (gas) Nail Gun
ConstructionCarpentryCut timber using a jigsaw
ConstructionCarpentryManufacture timber wall frames using a mitre saw and an Impulse (gas) Nail Gun
ConstructionCarpentryInstallation of eaves linings to new domestic residence
ConstructionCarpentryMeasure perimeter of house
ConstructionCarpentryCreate temporary work bench using trestles and planks
ConstructionCarpentryCut fibre cement sheeting using hand operated mechanical shears
ConstructionCarpentryCut fibre cement sheeting using electric shears
ConstructionCarpentrySet up trestle scaffold
ConstructionCarpentryCut timber using a battery powered circular saw
ConstructionCarpentryFix fibre cement soffit/ eaves sheet in place and nail by hand
ConstructionCarpentryCut timber beading using a hand saw and mitre box
ConstructionCarpentryMeasure for cladding above roof
ConstructionCarpentryPassing up Sheets and Accessories from the ground
ConstructionCarpentryFix fibre cement cladding sheet in place and nail by hand
ConstructionCarpentryEase/ adjust existing doors
ConstructionCarpentryInstall timber roof trusses by hand
ConstructionCarpentryInstall ceiling joist, Hanging beams, stabilisers, etc
ConstructionCarpentryInstall solid strip timber flooring (Secret Fix) to timber subfloor
ConstructionCarpentryApply construction adhesive using a calking gun
ConstructionCarpentryPosition floor boards together using a plank jack/ floor dog
ConstructionCarpentryInstall “STRUCTAflor” particle board flooring
ConstructionCarpentry1st fix carpentry to new dwelling using a Pneumatic and Impulse Nail Gun
ConstructionCarpentryMark out slab using a chalk line
ConstructionCarpentry1st fix carpentry to new 2 story dwelling using a Pneumatic and Impulse Nail Gun
ConstructionCarpentryInstallation of floor joist
ConstructionCarpentryInstall plywood flooring
ConstructionCarpentryCut wood beading using a hand saw and mitre box
ConstructionCarpentryCut wood using a battery powered circular saw
ConstructionCarpentryCut wood using a circular saw
ConstructionCarpentryCut wood using an electric jigsaw
ConstructionCarpentryCut wood using an electric mitre saw
ConstructionCarpentryInstall solid strip wood flooring (Secret Fix) to wood subfloor
ConstructionCarpentryInstall wood roof trusses by hand
ConstructionCarpentryInstall wood wall linings using a battery powered drill
ConstructionCarpentryInstall trimmers/ noggings to wood framing
ConstructionCarpentryInstall Hebel Panel
ConstructionCarpentryCut Hebel/ Autoclaved Aerated Concrete with a diamond blade circular saw
ConstructionPlumbingBack Fill trench by hand with original spoil
ConstructionPlumbingDig Trench by hand
ConstructionPlumbingInstallation of UPVC pipe
ConstructionPlumbingWelding copper tube
ConstructionPlumbingInstallation of underfloor plumbing and drains
ConstructionPlumbingClean trenches and setting grade by hand
ConstructionPlumbingConnect sewer drain to government connection
ConstructionPlumbingWorking in open trench
ConstructionPlumbingCut into existing earthenware branch using and angle grinder
ConstructionPlumbingConnect pipes together using a flexible connector
ConstructionPlumbingLoad skid steer excavator onto truck/ trailer using aluminium ramps
ConstructionPlumbingInstallation of Gas storage hot water system (HWS)
ConstructionPlumbingConnect water inlet and outlet
ConstructionPlumbingInstall hot and cold water fist fix plumbing (Timber framed)
ConstructionPlumbingMark out studwork for trimmer and fixture locations
ConstructionPlumbingInstall trimmers/ nogging to steel framing
ConstructionPlumbingInstall trimmers/ noggings to timber framing
ConstructionPlumbingInstall W45 Brass male lugged elbows, breaching pieces and mixers to steel frame
ConstructionPlumbingInstall damp proof membrane to trimmers/noggings prior to brass fittings
ConstructionPlumbingSecure W45 Brass male lugged elbows, breaching pieces and mixers
ConstructionPlumbingInstall hot and cold water fist fix plumbing (Steel framed)
ConstructionPlumbingRun plastic water/ gas pipework and fit off
ConstructionPlumbingFit “T”s and connectors to plastic pipes
ConstructionPlumbingSleeve and apply silicone around pipework passing trough holes
ConstructionPlumbingInstall temporary caps to fixtures
ConstructionPlumbingPressure testing of hot and cold pipework
ConstructionPlumbingInstallation of baths
ConstructionPlumbingPlumbing final fit
ConstructionPlumbingIsolate water to premises
ConstructionPlumbingDrain water system
ConstructionPlumbingUnpack fixtures/ materials
ConstructionPlumbingFit cover plates and mini cocks to outlets
ConstructionPlumbingCut down UPVC risers using an angle grinder
ConstructionPlumbingInstall toilet (WC Pan)
ConstructionPlumbingInstall cistern and flush pipe
ConstructionPlumbingInstall hand basins
ConstructionPlumbingFit Tapware/ mixers
ConstructionPlumbingInstall sinks/ troughs
ConstructionPlumbingInstall dishwasher
ConstructionPlumbingTest the property’s gas pipework for pressure leaks
ConstructionPlumbingInstall gas instantaneous hot water service (HWS)
ConstructionPlumbingInstall electric storage hot water service (HWS)
ConstructionPlumbingCut down UPVC risers using a battery powered angle grinder
ConstructionPlumbingInstall Zip Autoboil
ConstructionPlumbingInstall Stopcock valve
ConstructionPlumbingPlug the unit into the power supply outlet
ConstructionPlumbingClearing a blocked drain using an Electric Eel – Drain Snake
ConstructionPlumbingPipe freezing using liquid nitrogen
ConstructionPlumbingService and replacement of TMV in masonry wall
ConstructionPlumbingElectro-Fusion Welding of MDPE of HDPE pipe
ConstructionPlumbingInstall suspended pipework to underside of concrete slab
ConstructionPlumbingFit Pipe insulation over pipes
ConstructionPlumbingGlue jointing closed cell elastomeric pipe insulation
ConstructionPlumbingInstall suspended pipework to underside of roof purlins
ConstructionPlumbingWelding/ silver soldering copper pipes together
ConstructionPlumbingDrill hole into existing concrete slab with an electric rotary hammer drill
ConstructionPlumbingInstallation of mechanical masonry anchors
ConstructionPlumbingLift member using a forklift and lifting jib
ConstructionPlumbingRun copper plumbing pipework and fit off
ConstructionPlumbingDrill hole into existing concrete slab with an electric rotary hammer drill
ConstructionPlumbingInstall hot and cold water fist fix plumbing (Wood framed)
ConstructionPlumbingInstall backflow prevention valve
ConstructionPlumbingCommercial drainage and hot & cold water reticulation (complete plumbing job 1 )
ConstructionPlumbingInstall BlackMAX® SewerMAX® SewerMAX+® pipes
ConstructionPlumbingPumbing and Gas installation to new tennancy
ConstructionPlumbingInstallation of Dual Wall Polypropylene storm drainage pipe
ConstructionPlumbingDrill hole into existing contrete slab with an electric rotary hammer drill
ConstructionMechanical ServicesRemoval and Replacement of gantry crane radio control unit
ConstructionMechanical ServicesPlumb Lift Shaft
ConstructionMechanical ServicesLift shaft rail installation into Masonry shaft
ConstructionMechanical ServicesLift Shaft Fitout
ConstructionMechanical ServicesLift Car Installation and Fit Out
ConstructionMechanical ServicesFinal connections and commissioning of lift
ConstructionMechanical ServicesLift Installation
ConstructionMechanical ServicesInstallation of two post vehicle hoist (complete job including pick up and del)
ConstructionMechanical ServicesInstall hoist motor
ConstructionMechanical ServicesConnect temporary power supply and test operation of hoist
ConstructionMechanical ServicesInstallation of two post vehicle hoist
ConstructionMechanical ServicesInstallation of four post vehicle hoist (complete job including pick up and del)
ConstructionMechanical ServicesInstallation of four post vehicle hoist
ConstructionMechanical ServicesInstallation of scissor lift vehicle hoist (complete job inc pick up and del)
ConstructionMechanical ServicesRoutine Inspection of 2 post vehicle hoist
ConstructionMechanical ServicesRoutine Inspection of 4 post vehicle hoist
ConstructionMechanical ServicesRoutine Inspection of scissor lift vehicle hoist
ConstructionMechanical ServicesInstall Exhaust hood including ductwork to connect to base building connection
ConstructionElectricalInstallation of Cable Tray Covers
ConstructionElectricalDig Trench by hand
ConstructionElectricalFit power point to plasterboard wall
ConstructionElectricalFit switch to plasterboard wall
ConstructionElectricalRun Cables through existing ceiling space
ConstructionElectricalInstall Mounting brackets and rails to roof
ConstructionElectricalInstall isolator
ConstructionElectricalInstall Inverter
ConstructionElectricalInstall solar panels onto the mounting frame
ConstructionElectricalConnect new cables into existing switchboard
ConstructionElectricalFill out and issue Electrical Certificate of Compliance
ConstructionElectricalTest the electrical installation
ConstructionElectricalInstallation of catenary cable
ConstructionElectricalInstallation of cable tray
ConstructionElectricalRun Cables and secure to catenary cable
ConstructionElectricalConnect new cables into electrical plant/ equipment
ConstructionElectricalIsolate power to existing system
ConstructionElectricalDisconnect electrical from existing plant
ConstructionElectricalRewire in conduits between light fittings
ConstructionElectricalTracing and identifying existing live lighting circuits - for fault purposes
ConstructionElectricalReplace existing light fittings
ConstructionElectricalSecure conduits to structure with saddles
ConstructionElectricalInstallation of Solar System to Domestic Dwelling
ConstructionElectricalWorking in ceiling space
ConstructionElectricalFit power outlet to drywall
ConstructionElectricalFit switch to drywall
ConstructionElectricalElectrical installation to new tenancy (Complete Job with scissor lift)
ConstructionElectricalInstall light fittings
ConstructionElectricalWork on or near energised electrical installations or services
ConstructionElectricalReplace Smoke Detector
ConstructionBricklayingBricklaying
ConstructionBricklayingCarry bricks using a mechanical brick carrier (Clamps)
ConstructionBricklayingCut bricks using a petrol powered brick saw
ConstructionBricklayingBricklaying to new project home
ConstructionBricklayingInstallation of viscourse
ConstructionBricklayingSet up Profolds to corners
ConstructionBricklayingSet up mortar boards
ConstructionBricklayingMixing cement with a portable petrol powered mixer
ConstructionBricklayingCut bricks using an angle grinder
ConstructionBricklayingLoad bricks onto scaffold by hand
ConstructionBricklayingInstallation of lintel by hand
ConstructionBricklayingWash down brick wall
ConstructionBricklayingCarry blocks by hand
ConstructionBricklayingAcid wash surface by hand
ConstructionBricklayingMixing cement/ mortar with a portable petrol powered mixer
ConstructionBricklayingCut bricks using a gasoline powered brick saw
ConstructionBricklayingMixing cement/ mortar with a portable gasoline powered mixer
ConstructionBricklayingInstallation of Glass Blocks to existing opening
ConstructionBricklayingUse of Brick/Materials hoist
ConstructionStructural SteelInstalling Bolts through existing concrete slab
ConstructionStructural SteelInstallation of Steel Members - Using a Crane
ConstructionStructural SteelInstallation of Steel Bracing Members - Using an EWP
ConstructionStructural SteelInstallation of Roof Purlins - Using a Crane
ConstructionStructural SteelInstallation of Girts - Using an EWP
ConstructionStructural SteelInstallation of Steel members by hand
ConstructionStructural SteelLifting members using a chain block
ConstructionStructural SteelInstallation of Columns by hand
ConstructionStructural SteelConcrete filling of Columns by bucket
ConstructionStructural SteelRemoval of Steel Members by hand using EWP
ConstructionStructural SteelInject Epoxy into holes
ConstructionStructural SteelInstallation of Dynabolts
ConstructionStructural SteelInstallation of Steel Members - Using an EWP
ConstructionStructural SteelCoring concrete
ConstructionStructural SteelInstallation of Ball Tube Handrail
ConstructionStructural SteelCleaning steel using an electric grinder with a wire brush attachment
ConstructionStructural SteelGrout Columns
ConstructionStructural SteelCrane Set Up
ConstructionStructural SteelCutting Steel with an Oxy- Torch
ConstructionStructural SteelLift members into position by hand
ConstructionStructural SteelLifting materials using duct lifters
ConstructionStructural SteelWelding cleats to existing structure with a portable electric welder
ConstructionStructural SteelInstallation of Hold Down bolts into existing Concrete
ConstructionStructural SteelLand Column into position with Crane
ConstructionStructural SteelInstallation of Chem Anchors onto existing masonry wall
ConstructionStructural SteelInstallation of Wall plate by Hand
ConstructionStructural SteelInstallation of Floor Grating
ConstructionStructural SteelClaim work area on rail line
ConstructionStructural SteelLand Member into position using crane
ConstructionStructural SteelDrill hole using a magnetic drill
ConstructionStructural SteelTension nuts using a battery powered rattle gun
ConstructionStructural SteelInstall connecting bolts and tension nuts using a battery powered rattle gun
ConstructionStructural SteelCleaning steel using a battery powered grinder with a wire brush attachment
ConstructionStructural SteelInstallation of Chem Anchors onto existing masonry surface
ConstructionStructural SteelRepairs to a Fuel Vessel
ConstructionWall and Ceiling LiningsManufacture Steel Stud Wall Frames
ConstructionWall and Ceiling LiningsInstalling Cement Sheet Cladding
ConstructionWall and Ceiling LiningsInstallation of plasterboard linings
ConstructionWall and Ceiling LiningsFlushing to screws and joints in linings
ConstructionWall and Ceiling LiningsSanding of flushed joints by hand
ConstructionWall and Ceiling LiningsCut plasterboard using a key hole plasterboard saw
ConstructionWall and Ceiling LiningsInstall suspended ceiling grid
ConstructionWall and Ceiling LiningsCut fibre cement sheet using an electric circular fibre cement saw
ConstructionWall and Ceiling LiningsInstall fibre cement linings
ConstructionWall and Ceiling LiningsInstallation of insulation Batts to wall and ceiling framing
ConstructionWall and Ceiling LiningsSanding of flushed joints using an electric drywall / plasterboard sander
ConstructionWall and Ceiling LiningsManufacture/ build Steel Stud Wall Frames on site
ConstructionWall and Ceiling LiningsInstall fibre cement linings using a battery powered drill
ConstructionWall and Ceiling LiningsCut hole into existing Drywall surface using a key hole Drywall saw
ConstructionWall and Ceiling LiningsCut plasterboard using a plasterboard hand saw
ConstructionWall and Ceiling LiningsCut Drywall using a drywall hand saw
ConstructionWall and Ceiling LiningsInstallation of drywall linings
ConstructionWall and Ceiling LiningsDrywall finishing
ConstructionWall and Ceiling LiningsSanding of finished drywall by hand
ConstructionWall and Ceiling LiningsSuspended ceiling, steel stud, flush jointed plasterboard (complete job)
ConstructionWall and Ceiling LiningsClean up buckets and tools
ConstructionWindows and DoorsInstall aluminium door frame into existing masonry opening
ConstructionWindows and DoorsInstallation of Aluminium Doors and Door Hardware
ConstructionWindows and DoorsCork joint with Polyurethane sealant
ConstructionWindows and DoorsInstallation of Wooden Doors and Door Hardware using battery powered tools
ConstructionWindows and DoorsInstall preassembled window frame into existing opening and screw fix
ConstructionGeneral BuildingConstruction Site Establishment and Project Risk Assessment
ConstructionGeneral BuildingProject Risk Assessment
ConstructionGeneral BuildingInstall Acro prop
ConstructionGeneral BuildingRemove existing silicone
ConstructionGeneral BuildingClean up site by hand using a wheel barrow to transfer debris to bin
ConstructionGeneral BuildingRefurbishment of residence/ unit
ConstructionGeneral BuildingAnother us
ConstructionGeneral BuildingInstall Pull down attic ladder into drywall ceiling and wood framing
ConstructionGeneral BuildingCut wood using a battery powered reciprocating saw
ConstructionGeneral BuildingCut wood using a reciprocating saw
ConstructionGeneral BuildingInstall Carpet and underlay to a wood floor
ConstructionGeneral BuildingBrick and Blocklaying – Complete commercial job scaffold supplied by builder
ConstructionGeneral BuildingConcrete filling of blockwork by bucket
ConstructionGeneral BuildingAccept load from vehicle with forklift (3rd Party operator) + unloading by hand
ConstructionGeneral BuildingCarrying materials and equipment (Manual Handling)
ConstructionGeneral BuildingApply Silicone / Liquid Nails / Construction adhesive
ConstructionGeneral BuildingInstallation of UPVC Conduit
ConstructionGeneral BuildingWelding with a portable TIG welder
ConstructionGeneral BuildingLift member into position using a duct/genie lifter
ConstructionGeneral BuildingApply epoxy floor coating
ConstructionGeneral BuildingPre work inspection of Plant
ConstructionGeneral BuildingDemolition/ Removal of steel structure using a crane
ConstructionGeneral BuildingInstallation of Structural Steel framed structure (Shed) using a crane and EWP
ConstructionGeneral BuildingWorking in a commercial kitchen
ConstructionGeneral BuildingClaim Tenancy work area
ConstructionGeneral BuildingInspection and use of a Non-slewing Telehandler
ConstructionGeneral BuildingOperation of EPS Hot Melting Machine
ConstructionDemolitionRemoval of Asbestos products
ConstructionDemolitionCutting Concrete with a Quick Cut Diamond blade saw
ConstructionDemolitionDemolition of existing plasterboard lined partition stud wall
ConstructionDemolitionCut masonry wall with a Quick Cut Diamond blade saw
ConstructionDemolitionPart demolition of existing brick wall to form new opening
ConstructionDemolitionKnock out brick s using a hammer
ConstructionDemolitionCut steel using a reciprocating saw
ConstructionDemolitionDemolition of cupboards and built in robes
ConstructionDemolitionDemolition/ removal of bathroom fixtures and fittings
ConstructionDemolitionJimmy/ prise fixtures away from wall
ConstructionDemolitionDemolition/ Removal of existing wall and floor tiles using an elec jack hammer
ConstructionDemolitionUsing an electric Jack Hammer/ Electric Breaker/ Demolition Hammer
ConstructionDemolitionDemolition/ Removal of existing carpet and undelay
ConstructionDemolitionDemolition/ Removal of existing vinyl flooring
ConstructionDemolitionRemoval/ demolition of existing suspended exposed grid ceiling
ConstructionDemolitionSafety Inspection and use of Hydraulic Shear attachment
ConstructionDemolitionRemove screws using a battery powered drill
ConstructionDemolitionLower materials to ground with ropes
ConstructionDemolitionRemoval of asbestos adhesive from hard surface
ConstructionDemolitionDemolition/ removal of existing Compactus shelving unit
ConstructionDemolitionRemove nuts using a battery powered rattle gun
ConstructionDemolitionRemoving friable asbestos-contaminated soil by hand and using an excavator
ConstructionDemolitionRemediation of asbestos contaminated soil by hand and using general hand tools
ConstructionDemolitionRemove asbestos clothing
ConstructionDemolitionRemoving non-friable asbestos-contaminated soil by hand and using an excavator
ConstructionDemolitionRemoving friable asbestos by hand
ConstructionDemolitionSpray PVA Glue with an electric airless sprayer
ConstructionDemolitionRemoving non friable asbestos by hand
ConstructionDemolitionRemove existing suspended ceiling tiles
ConstructionDemolitionSafety check and operation of Excavator for demolition works
ConstructionDemolitionSafety Inspection and use of Hydraulic Rock Breaker
ConstructionDemolitionDemolition/ removal of existing suspended exposed grid ceiling
ConstructionDemolitionDemolition of existing Drywall lined partition stud wall
ConstructionDemolitionDemolition/ Removal of timber planking by hand
ConstructionDemolitionDemolition/ removal of existing ceiling tiles
ConstructionDemolitionLead based paint removal using Peel away Paint Removal System
ConstructionDemolitionSelection and Use of PPE
ConstructionDemolitionEnter asbestos removal area through the Decontamination Unit
ConstructionDemolitionExit asbestos removal area through the Decontamination Unit
ConstructionDemolitionDecontamination of Plant
ConstructionDemolitionLining of the Truck with Plastic Lining
ConstructionDemolitionDemolition of existing flush jointed plasterboard ceiling
ConstructionDemolitionDemolition/ Removal of existing insulated panel cool room/ freezer by hand
ConstructionDemolitionDemolition/ removal of existing joinery
ConstructionDemolitionDemolition of brick veneer iron roof house by hand
ConstructionDemolitionRemoval of materials from roof by hand to ground
ConstructionDemolitionDemolition/ removal of existing timber framing using a petrol powered chainsaw
ConstructionDemolitionDemolition/removal of items containing lead
ConstructionDemolitionDemolition/removal of window glazing and aluminium frames
ConstructionDemolitionDemolition/removal of glass from frame
ConstructionDemolitionDemolition/ Removal of Glass Panes in French Doors/ Windows
ConstructionDemolitionDemolition of brick wall by hand and jack hammer
ConstructionDemolitionDemolition of brick veneer tiled roof house by hand
ConstructionDemolitionPassing down Roof Sheets and Accessories to the ground
ConstructionDemolitionClean up demolished materials using a shovel, rake, and wheelbarrow.
ConstructionDemolitionDemolition/ Removal of steel staircase by hand from a scissor lift
ConstructionDemolitionDemolition/ Removal of Glass Panes in Doors/ Windows
ConstructionDemolitionDemolition/ Removal of existing pavers
ConstructionDemolitionDemolition/removal of items containing lead and lead dust to ceiling cavities
ConstructionDemolitionVacuum ceiling cavities with a portable HEPA vacuum
ConstructionDemolitionRemoval of contaminated materials/ hazardous waste from site
ConstructionDemolitionRemove PPE/ Lead contaminated clothing
ConstructionDemolitionDemolition/ Removal of roller door using a scissor lift and forklift
ConstructionDemolitionDemolition/ Removal of glazed (Glass) aluminium partitions
ConstructionDemolitionHouse demolition using an excavator
ConstructionDemolitionRemoval of demolished materials and waste from site
ConstructionDemolitionAsbestos removal by hand and house demolition using an excavator
ConstructionDemolitionUsing a portable electric conveyor
ConstructionDemolitionMould Remediation - Using chemical and vacuum
ConstructionDemolitionInspection and use of a diesel walk-behind floor saw
ConstructionDemolitionInspection and Use of a Petrol-Powered Ring Saw to cut masonry surface
ConstructionDemolitionInspection and Use of a Gasoline-Powered Ring Saw to cut masonry surface
ConstructionDemolitionInspection and Use of a Petrol-Powered concrete chainsaw
ConstructionDemolitionInspection and Use of an electric masonry wall saw
ConstructionDemolitionPrepare to demolish/ remove existing mechanical services
ConstructionDemolitionDemolish/ remove a wooden staircase by hand
ConstructionDemolitionDemolition/ removal of existing timber framing using a battery recipro saw
ConstructionDemolitionRemoving non friable asbestos by hand (Complete Job)
ConstructionDemolitionDon personal protective equipment (PPE) prior to asbestos removal
ConstructionDemolitionDemolish masonry structure with an electric Demolition Robot
ConstructionDemolitionPlan the demolition works and sequencing
ConstructionDemolitionDemolition/ Removal of metal wall cladding by hand from ground and scissor lift
ConstructionDemolitionDemolition/ Removal of steel framing members by hand from EWP
ConstructionHome ImprovementsDrill Wall Girths and Purlins with an electric drill
ConstructionHome ImprovementsBuild Steel Wall Frame and Bolt Wall Girths to Columns
ConstructionHome ImprovementsBuild Wall Frame and Tek Screw Wall Girths to Columns
ConstructionHome ImprovementsStand up clad walls
ConstructionHome ImprovementsInstallation of Garage (Domestic Shed) complete job
ConstructionHome ImprovementsInstallation of Steel Portal Roof Trusses by hand
ConstructionHome ImprovementsInstallation of Steel Roof Purlins by hand
ConstructionHome ImprovementsInstallation of Steel Wall Girths by hand
ConstructionHome ImprovementsInstallation of wall sheeting from Ground
ConstructionHome ImprovementsScrew fixing wall sheeting from platform ladder
ConstructionHome ImprovementsMixing concrete with a portable mixer
ConstructionHome ImprovementsPush Wheel Barrow on site
ConstructionHome ImprovementsWash out mixer
ConstructionHome ImprovementsInstallation of Temporary Height Safety System - Starting from Platform Ladder
ConstructionHome ImprovementsInstallation of Roller Door (domestic)
ConstructionHome ImprovementsScrew fixing wall sheeting from platform ladder
ConstructionHome ImprovementsSrew fixing wall sheeting from platform ladder
ConstructionPrecastJoint Caulking
ConstructionPrecastPropping/Bracing of existing walls
ConstructionLandscapingScreed sand
ConstructionLandscapingLay brick pavers
ConstructionLandscapingTrowel cement to edges of pavers
ConstructionLandscapingPrepare and lay brick pavers
ConstructionLandscapingSweeping sand over pavers and into cracks
ConstructionLandscapingInstallation of Synthetic Turf
ConstructionLandscapingPreparation and installation of synthetic turf
ConstructionLandscapingInstallation of subsurface irrigation system
ConstructionLandscapingInstall irrigation poly pipe and fittings
ConstructionLandscapingPlanting of trees and shrubs by hand
ConstructionLandscapingAcceptance of delivery of concrete
ConstructionConcreter and Concrete RepairPouring Concrete
ConstructionConcreter and Concrete RepairDig Trench by hand
ConstructionConcreter and Concrete RepairMixing concrete with a portable mixer
ConstructionConcreter and Concrete RepairDig Hole by hand
ConstructionConcreter and Concrete RepairInstall damp proof membrane (Forticon plastic)
ConstructionConcreter and Concrete RepairPlace steel reinforcing mesh
ConstructionConcreter and Concrete RepairFinishing concrete with petrol powered trowel (Helicopter)
ConstructionConcreter and Concrete RepairConcrete Delivery and Pumping
ConstructionConcreter and Concrete RepairPlacing Concrete
ConstructionConcreter and Concrete RepairPouring Concrete Slab using a pump and a helicopter
ConstructionConcreter and Concrete RepairConcrete crack repair and injection
ConstructionConcreter and Concrete RepairApply surface sealant material (Kahfill) to face of crack
ConstructionConcreter and Concrete RepairInjection of Nitofill LV epoxy resin
ConstructionConcreter and Concrete RepairWater ingress repair using XYPEX
ConstructionConcreter and Concrete RepairConcrete and reinforcement repairs
ConstructionConcreter and Concrete RepairAbrasive blasting
ConstructionConcreter and Concrete RepairApply high strength repair mortar
ConstructionConcreter and Concrete RepairFinishing concrete with gasoline powered trowel (Helicopter)
ConstructionConcreter and Concrete RepairWorking with silica and silica containing products
ConstructionConcreter and Concrete RepairInstallation of Gypsum Concrete floor underlayment
ConstructionConcreter and Concrete RepairInspection and use of Diesel-Powered Hydraulic Cementitious Products Mixer Pump
ConstructionConcreter and Concrete RepairSpreading Gypsum Concrete with Rake/Screed
ConstructionWall and Floor TilingMixing cement with a portable electric mixer
ConstructionWall and Floor TilingPlacing a cement screed
ConstructionWall and Floor TilingWall and floor tiling to domestic residence
ConstructionWall and Floor TilingLaying floor tiles
ConstructionWall and Floor TilingCut tiles using an angle grinder
ConstructionWall and Floor TilingMix adhesive in a bucket using an electric drill
ConstructionWall and Floor TilingLaying wall tiles
ConstructionWall and Floor TilingMix grout in a bucket using an electric drill
ConstructionWall and Floor TilingGrout tiles
ConstructionWall and Floor TilingWash out bucket
ConstructionWall and Floor TilingRemove existing grout between tiles
ConstructionPainting and DecoratingPainting of Walls and Ceilings
ConstructionPainting and DecoratingPainting of walls
ConstructionPainting and DecoratingPainting of ceilings
ConstructionPainting and DecoratingPainting with an electric airless sprayer
ConstructionPainting and DecoratingFill holes and imperfections
ConstructionSolid PlasteringRendering/ solid plastering
ConstructionSolid PlasteringMix acrylic render in a bucket using an electric drill
ConstructionSolid PlasteringTrowel acrylic render onto surface
ConstructionSolid PlasteringChip out loose concrete/ cement or render with scabbling hammer
ConstructionSolid PlasteringClean masonry surface using an electric grinder and cup disc
ConstructionSolid PlasteringMixing Adhesive/ Mortar/ Render/ Cement based products with an electric drill
ConstructionSolid PlasteringInspection and use of electric mortar / grout / plaster mixer
ConstructionFire ProtectionThread pipe using a Portable Power Pipe Threader
ConstructionFire ProtectionRun Pipe work and cables through existing ceiling space
ConstructionFire ProtectionFit speakers and detectors to plasterboard ceiling
ConstructionFire ProtectionConnect new cables into existing fire panel
ConstructionFire ProtectionWorking in a confined space
ConstructionFire ProtectionInstall suspended fire pipework to underside of roof purlins
ConstructionFire ProtectionInstall suspended fire pipework to underside of concrete slab
ConstructionFire ProtectionFit speakers and detectors to drywall ceiling
ConstructionFloor Finisher and CovererInspection and use of Diamond Floor Grinder
ConstructionFloor Finisher and CovererInstall vinyl floors
ConstructionFloor Finisher and CovererInstall vinyl skirting
ConstructionFloor Finisher and CovererInstall Carpet and underlay to a timber floor
ConstructionFloor Finisher and CovererInstall Carpet and underlay to a concrete floor
ConstructionGlazierCarrying Window frames from storage area to work area
ConstructionGlazierUnload glass from vehicle onto trolley
ConstructionGlazierInstall Aluminium deflection head and sub sill
ConstructionGlazierCut aluminium sections using an electric mitre saw
ConstructionGlazierInstall window frames into deflection head and sub sill
ConstructionGlazierInstall glass into frame
ConstructionGlazierInstallation of Glazed aluminium partitions
ConstructionRiggingInstallation of Columns - Using a Crane
ConstructionRiggingInstallation of steel cable
ConstructionRiggingIndustrial rope access
ConstructionRiggingInstall, beams, rafters, bracing and other members using a crane
ConstructionRiggingAccess work area using a personnel crane cage/ dog box/ workbox
ConstructionRoof Tiling Re-bed tiled roof ridge capping
ConstructionRoof TilingMix mortar in a wheel barrow
ConstructionRoof TilingCarrying mortar in a bucket to work area
ConstructionRoof TilingSet up mortar bed formwork frame
ConstructionRoof TilingPlace tile onto mortar bed and trowel off
ConstructionRoof TilingRepointing of ridge tiles
ConstructionRoof TilingReplace broken roof tiles
ConstructionScaffolderErection and use of a steel tube scaffold
ConstructionScaffolderErection and use of aluminium tube scaffold
ConstructionScaffolderInstallation of cantilevered K-Stage Modular Steel Scaffold
ConstructionScaffolderInstallation of K-Stage Modular Steel Scaffold
ConstructionScaffolderErecting, Altering and Dismantling Prefabricated Steel Modular Scaffolding
ConstructionScaffolderErection and Use of Mobile Scaffold (Extended Version)
ConstructionFormworkerInstallation of simple formwork
ConstructionFormworkerInstallation of formwork support frames
ConstructionFormworkerInstall bearers and joists to formwork support frames
ConstructionFormworkerInstall plywood formwork to support framing
ConstructionFormworkerStripping formply
ConstructionFormworkerInstall ‘Bondek’ or Similar formwork to structure Using an Explosive Power Tool
ConstructionFormworkerUsing an Explosive Power Tool
ConstructionSteel FixerPlace steel reinforcing in footing
ConstructionSteel FixerCut steel reinforcing using bolt cutters
ConstructionSteel House FramingInstallation of steel house framing
ConstructionSteel House FramingInstall steel roof trusses by hand
ConstructionSteel House FramingInstall steel ceiling battens, stabilisers, etc
ConstructionSteel House FramingInstallation of metal roof battens and trimmers
ConstructionAir Conditioning and RefrigerationInstallation of threaded rod hanging bars
ConstructionAir Conditioning and RefrigerationInstallation of support angles or channels to hanging rods
ConstructionAir Conditioning and RefrigerationCut copper pipe with tube cutter
ConstructionAir Conditioning and RefrigerationCut Steel/ Unistrut with drop saw
ConstructionAir Conditioning and RefrigerationFilling & testing of pipework
ConstructionAir Conditioning and RefrigerationReplacement of wall hung split system air conditioner
ConstructionAir Conditioning and RefrigerationReclaim refrigerant gas from existing system
ConstructionAir Conditioning and RefrigerationDisconnect pipework form existing plant
ConstructionAir Conditioning and RefrigerationRemove existing wall mounted unit
ConstructionAir Conditioning and RefrigerationInstall new wall mounted unit
ConstructionAir Conditioning and RefrigerationAccess ceiling space via Ladder
ConstructionAir Conditioning and RefrigerationRun Pipe work through existing ceiling space
ConstructionAir Conditioning and RefrigerationInstall flexi ductwork and zone motors in ceiling space
ConstructionAir Conditioning and RefrigerationInstall ceiling registers
ConstructionAir Conditioning and RefrigerationRefrigerant charge the system using a vacuum pump
ConstructionAir Conditioning and RefrigerationInstallation of wall hung split system air conditioner
ConstructionAir Conditioning and RefrigerationReplacement of ducted system air conditioner
ConstructionAir Conditioning and RefrigerationInstallation of ducted system air conditioner
ConstructionAir Conditioning and RefrigerationInstallation of Cool Room
ConstructionAir Conditioning and RefrigerationFix aluminium channels to existing slab using battery powered hammer drill
ConstructionAir Conditioning and RefrigerationStand up cool room panels and fit into bottom track
ConstructionAir Conditioning and RefrigerationInstall insulated ceiling panels to cool room
ConstructionAir Conditioning and RefrigerationCut aluminium angles using a hacksaw and mitre box
ConstructionAir Conditioning and RefrigerationInstallation of refrigeration system to cool room
ConstructionAir Conditioning and RefrigerationHang Fan cooler unit inside cool room
ConstructionAir Conditioning and RefrigerationInstall TX Valve
ConstructionAir Conditioning and RefrigerationSilver solder copper pipes together
ConstructionAir Conditioning and RefrigerationRun connecting copper pipework and fit off
ConstructionAir Conditioning and RefrigerationFit Pipe insulation over pipes
ConstructionAir Conditioning and RefrigerationSecure pipework to structure with saddles
ConstructionAir Conditioning and RefrigerationCore hole through masonry wall with a battery powered rotary hammer drill
ConstructionAir Conditioning and RefrigerationHang condensing unit onto masonry wall
ConstructionAir Conditioning and RefrigerationFit Unistrut brackets onto masonry wall
ConstructionAir Conditioning and RefrigerationMount condensing unit onto preinstalled Unistrut brackets
ConstructionAir Conditioning and RefrigerationPressure testing of pipework with nitrogen and charge with refrigerant (HCFC)
ConstructionAir Conditioning and RefrigerationInstallation of underfloor refrigeration pipework
ConstructionAir Conditioning and RefrigerationPlace copper pipes into trench ducting
ConstructionAir Conditioning and RefrigerationMixing Polyurethane Isocyanate in a bucket using an electric drill
ConstructionAir Conditioning and RefrigerationPour Polyurethane Isocyanate into pipe duct
ConstructionAir Conditioning and RefrigerationInstallation of new refrigeration System to new supermarket (complete job)
ConstructionAir Conditioning and RefrigerationCut hole into existing plasterboard ceiling using a key hole plasterboard saw
ConstructionAir Conditioning and RefrigerationInstallation of new refrigeration to coolroom (complete job)
ConstructionWaterproofingInstall waterproofing polymer cementitious membrane
ConstructionWaterproofingHot Fluid-Applied Rubberized Asphalt Waterproofing
ConstructionWaterproofingSpray primer onto surface using a hand sprayer
ConstructionWaterproofingHeat rubberized asphalt in an oil- or air-jacketed melter
ConstructionAll TradesAcceptance of delivery to site for materials via Crane Truck
ConstructionAll TradesUsing an Angle Grinder
ConstructionAll TradesCleaning up work area
ConstructionAll TradesWelding with a portable Electric Welder
ConstructionAll TradesMoving materials around on a trolley
ConstructionAll TradesApply touch up paint
ConstructionAll TradesAccess roof via Scissor Lift
ConstructionAll TradesAccess roof via Ladder
ConstructionAll TradesUsing an Existing roof anchorpoint system
ConstructionAll TradesDrill hole using an electric drill
ConstructionAll TradesInstall screws using a tek gun
ConstructionAll TradesCut materials using an electric mitre saw
ConstructionAll TradesLoading materials onto truck using a crane and by hand
ConstructionAll TradesSafety Check And Use Of Scissor Lift (Extended version)
ConstructionAll TradesSafety Check And Use Of Boom Lift (extended version)
ConstructionAll TradesAccess work area via a mobile scaffold
ConstructionAll TradesCut Steel using an Angle Grinder
ConstructionAll TradesClaim Work Area
ConstructionAll TradesLoading Materials onto roof using an EWP
ConstructionAll TradesCarrying materials from storage area to work area
ConstructionAll TradesPush Wheel Barrow on site
ConstructionAll TradesAccess roof via fixed access ladder
ConstructionAll TradesMarking Out Slab or Ground
ConstructionAll TradesErection and use of mobile scaffold
ConstructionAll TradesAccess work area using a platform ladder
ConstructionAll TradesInstall screws using a Battery Powered Drill
ConstructionAll TradesDrill hole using a Battery Powered Drill
ConstructionAll TradesRefuelling of machinery
ConstructionAll TradesInspection and use of Generator
ConstructionAll TradesCut strapping off around pack of materials
ConstructionAll TradesInspection and use of petrol powered high pressure water sprayer
ConstructionAll TradesAccess Roof via scaffold stair access
ConstructionAll TradesUndertake Clients general all sites induction
ConstructionAll TradesRepeat the above process steps until completion of task
ConstructionAll TradesInform facilities / operations and security personnel of work location(s)
ConstructionAll TradesDrill hole into masonry surface with a battery powered rotary hammer drill
ConstructionAll TradesMove materials using a trolley (sack Truck)
ConstructionAll TradesWorking in isolation
ConstructionAll TradesAccess roof via Boom Lift
ConstructionAll TradesWorking at height from a scissor lift
ConstructionAll TradesInspect and drive passenger/ light commercial vehicle on or off site
ConstructionAll TradesAccess work area using a step ladder
ConstructionAll TradesAccess work area via a scaffold/ working at heights from a scaffold
ConstructionAll TradesDrill hole into masonry surface with an electric rotary hammer drill
ConstructionAll TradesWorking at heights - Generally
ConstructionAll TradesWorking at height from a boom lift
ConstructionAll TradesCut steel using a battery powered angle grinder
ConstructionAll TradesWorking at heights - Generally
ConstructionAll TradesHigh Risk Construction Work covered in this SWMS
ConstructionAll TradesWorking where there is movement of powered mobile plant
ConstructionAll TradesAccess work area using 'Hop-Up' trestle ladder/ work platform
ConstructionAll TradesAccess roof via an extension ladder
ConstructionAll TradesSite Emergency Response Procedure
ConstructionAll TradesLoad materials/members into scissor lift
ConstructionAll TradesShoot nail into concrete with a cordless nailer
ConstructionAll TradesCore through masonry surface with an electric core drill
ConstructionAll TradesInstall concrete screw anchor/bolts using a battery powered rattle gun
ConstructionFencingDelivery and installation of temporary fencing
ConstructionFencingInstallation of temporary fencing
ConstructionFencingRemoval of temporary fencing
ConstructionFencingInstallation of Panel fencing
ConstructionFencingMix concrete in a wheel barrow
ConstructionFencingCut fence sheets with electric shears
ConstructionFencingScrew fence sheets to rail using a battery powered drill
ConstructionFencingInstall posts
ConstructionFencingInstall chainmesh fencing
ConstructionFencingInstall star pickets using a hammer and Star Post Dropper
ConstructionFencingInstallation of post and rail metal clad fencing
ConstructionFencingInspection and use of Fastfencer attachment to run out fencing wire/ mesh
ConstructionFencingCut existing wire ties and unfasten existing fencing wire/mesh from fence posts
ConstructionFencingDrive in fence posts and droppers with a Backhoe & hydraulic vibrating hammer
ConstructionFencingDrive in fence posts and droppers with an Excavator & hydraulic vibrating hammer
ConstructionFencingClip off wire to the posts using a battery powered clip gun
ConstructionJoineryGrinding/ Polishing bench tops with a handheld grinder
ConstructionJoineryInstallation of new kitchen joinery
ConstructionJoineryInstall Kick plate
ConstructionJoineryInstall cupboards
ConstructionJoineryInstall pre laminated bench top
ConstructionJoineryInstall wall mounted cupboards to stud wall
ConstructionJoineryCut timber to size using a table saw
ConstructionJoineryAdjust hinges to joinery doors
ConstructionJoineryInstall timber wall linings
ConstructionJoinery Install prefabricated steel counter frames
ConstructionJoineryLay Hebel panels into frames and grout into position
ConstructionJoineryInstall timber wall linings using a battery powered drill
ConstructionJoineryCut wood to size using a table saw
ConstructionJoineryInstall aluminium skirting
ConstructionJoineryInstall joinery counters and wall units
ConstructionJoineryPosition joinery items and level
ConstructionJoineryInstall Stone Benchtops
ConstructionLouvresManually lift panel into position
ConstructionLouvresInstallation of Horizontal Sunshade Panels into position by hand
ConstructionLouvresLoading Louvre members onto roof using a crane
ConstructionLouvresInstallation of louvre members - Using a boom lift
ConstructionLouvresInstall louvre blades into mullion/ blade carriers
ConstructionLouvresInstall louvre doors into existing masonry opening
ConstructionLouvresInstall louvre mullions to existing steel girths using a battery powered drill
ConstructionShelving and RackingInstallation of Static Shelving
ConstructionShelving and RackingInstallation of Pallet Racking
ConstructionShelving and RackingAssemble Frames and bolt together
ConstructionShelving and RackingStand up pre-assembled rack frames
ConstructionShelving and RackingInstall horizontal racking beams from ground
ConstructionShelving and RackingInstall horizontal racking beams from a scissor lift
ConstructionShelving and RackingLevel racking and bolt to slab
ConstructionShelving and RackingInstallation of Pallet Racking (complete job)
ConstructionShelving and RackingInstallation of cantilever racking
ConstructionShelving and RackingInstallation of Longspan shelving
ConstructionShelving and RackingDismantling of Pallet Racking
ConstructionShelving and RackingRemove horizontal racking beams from a scissor lift
ConstructionShelving and RackingRemove horizontal racking beams from ground
ConstructionShelving and RackingManually lower installed rack frames to the ground
ConstructionShelving and RackingInstallation of Stock Picking Racking
ConstructionShelving and RackingPigeon Hole Rack Assembly (Complete Job)
ConstructionShelving and RackingInstall handrails to platform
ConstructionShelving and RackingInstall staircase assembly using a forklift and lifting jib
ConstructionShelving and RackingStand up pre-assembled rack frames using a Forklift and Rack Frame Lifting Jib
ConstructionSeatingInstallation of fixed stadium seating (complete Job)
ConstructionSeatingInstallation of Chair Modules
ConstructionSeatingInstallation of fixing brackets to concrete
ConstructionSeatingInstallation of retractable stadium seating
ConstructionSeatingInstall Drive Motor to Platform Frame
ConstructionSeatingInstall end safety rails to Retractable platforms
ConstructionSeatingInstallation of Plywood Decks
ConstructionSeatingAttach platform to wall bracket
ConstructionMaritimeInspection and use of tender vessel
ConstructionMaritimeWorking on a work boat/ vessel
ConstructionMaritimeLowering and raising spuds
ConstructionMaritimeInspection and use of the vessel mounted crane
ConstructionMaritimeInspection and use of the vessel mounted forklift
ConstructionMaritimeUnload barge from truck to water with a mobile crane
ConstructionMaritimeDrive piles with a crane lifted vibro hammer vibrating hammer pile driver
ConstructionMaritimeTow and Position Barge
ConstructionMaritimeWorking on a Barge
ConstructionMaritimeWorking in the water
ConstructionMaritimeSite/ Vessel Orientation/ Induction
ConstructionMaritimeInspection and use of tender and tow vessels
ConstructionMaritimeRemove the existing jetty fender
ConstructionMaritimeDrill hole into the seabed rock with an air over hydraulic drilling rig
ConstructionHeight SafetyUsing a Harness and Static Line
ConstructionHeight SafetyMeasure and mark out for system installation
ConstructionHeight SafetyTwin rope rescue via pick off and take to ground
ConstructionHeight SafetyInstall Surface Mounted anchor points to metal roof
ConstructionHeight SafetyInstall Surface Mounted anchor points to metal roof without edge protection
ConstructionHeight SafetyInstall rafter mounted anchor points to a tiled roof
ConstructionHeight SafetyInstall Rafter Mounted anchor points to tiled roof without edge protection
ConstructionHeight SafetyInstall anchor points into existing concrete slab
ConstructionHeight SafetyInstall modular access ladders to existing masonry wall
ConstructionHeight SafetyInstall modular access ladder to structural wall girts behind wall cladding
ConstructionHeight SafetyInstall Pull down attic ladder into plasterboard ceiling and timber framing
ConstructionHeight SafetyInstall Pull down attic ladder into plasterboard ceiling and steel framing
ConstructionHeight SafetyInstall Pull down attic ladder into suspended exposed grid ceiling
ConstructionHeight SafetyInstall Horizontal Life line surface mounted to metal roof sheeting
ConstructionHeight SafetyRun and Connect Static Line Cable
ConstructionHeight SafetyInstall Horizontal Life line fixed to overhead concrete
ConstructionHeight SafetyInspect and certify the static line installation
ConstructionHeight SafetyInstall Horizontal Life line fixed to masonry wall
ConstructionHeight SafetyInspect and certify the anchor point installation
ConstructionHeight SafetyInstall Horizontal Life line fixed to overhead structural steel
ConstructionHeight SafetyInstall roof access hatch into a metal roof
ConstructionHeight SafetyInstall Pull down attic ladder into drywall ceiling and steel framing
ConstructionHeight SafetyInstall Safety Anchors to an existing roof (wood from above and below)
ConstructionHeight SafetyInstall modular handrail to the top of insulated panel cool room
ConstructionInsulated PanelsLift insulated panels using a lifting jib and vacuum lifter/Cladboy
ConstructionInsulated PanelsStand up Insulated Panels using a Forklift and Panel Lifting Jib
ConstructionInsulated PanelsInstall Insulated Panels by hand and using a roller lifting jib (Complete Job)
ConstructionMetalworkInstallation of stainless steel benches and cabinets (Complete Job)
ConstructionMetalworkMeat Rail Installation (Complete Job)
ConstructionCladdingInstallation of Exsulite Facade Cladding and Texture Coating
Healthcare & MedicalPhysiotherapyIn home Physiotherapy
Healthcare & MedicalHomecareAssist client in and out of a chair
Healthcare & MedicalAged CareDealing with people with dementia or aggression
Hire and RentalHire and RentalDelivery, cleaning and removal of portable toilets
HorticultureParks and GardensInspection and use of tractor mounted slasher
HorticultureParks and GardensInspection and use of skid steer mounted slasher
HorticultureParks and GardensInspection and use of petrol powered Brushcutter/ Grass Trimmer
HorticultureParks and GardensHerbicide Spraying by hand
HorticultureParks and GardensInspection and use of petrol powered walk behind lawn mower
HorticultureParks and GardensUnload tractor/ ride on lawnmower from trailer using aluminium ramps
HorticultureParks and GardensLoad Tractor/ ride on lawnmower onto trailer using aluminium ramps
HorticultureParks and GardensCarrying green waste by hand
HorticultureParks and GardensLoading ad dragging bags of waste to bin or vehicle
HorticultureParks and GardensDiscovery of syringes or needles/ sharps
HorticultureParks and GardensSpreading mulch by bucketing and spreading with shovel and rake
HorticultureParks and GardensSpreading soil with Shovel and Rake
HorticultureParks and GardensSpreading fertilizer and manure
HorticultureParks and GardensMulching of garden waste using a petrol-powered mulcher
HorticultureParks and GardensWorking outside in the sun
HorticultureParks and GardensWorking with spikey plants
HorticultureParks and GardensWorking beneath large fig trees
HorticultureParks and GardensWorking on sloping/ steep ground
HorticultureParks and GardensControl of pedestrians through work area
HorticultureParks and GardensPrune branches using hand operated extendable pore pruner or pole saw
HorticultureParks and GardensInspection and use of gasoline powered Brush cutter/ Grass Trimmer
HorticultureParks and GardensInspection and use of gasoline powered walk behind lawn mower
HorticultureParks and GardensMulching of garden waste using a gasoline powered mulcher
HorticultureParks and GardensInspection and use of Stand on Sprayer
HorticultureParks and GardensInspection and use of Tractor with scarifier
HorticultureParks and GardensInspection and use of Tractor with flail mower
HorticultureParks and GardensInspection and use of Tractor with Verti-Drain
HorticultureParks and GardensInspection and use of Tractor Sprayers
HorticultureParks and GardensUse of Tractor and Broadcaster
HorticultureArboricultureFelling of tree from the ground - not requiring a climber
HorticultureArboricultureCut tree using a petrol powered chainsaw
HorticultureArboricultureMulching of trees and branches using a Brush/ Wood Chipper
HorticultureArboricultureClimb Tree to lop branches
HorticultureArboriculturePut on Harness and set up ropes
HorticultureArboricultureClimb Tree
HorticultureArboricultureFelling of tree using Climbing Technique
HorticultureArboricultureStump Grinding
HorticultureArboricultureUnload stump grinding machine from trailer using aluminium ramps
HorticultureArboricultureLoad stump grinding machine onto trailer using aluminium ramps
HorticultureArboricultureInspection and use of petrol powered chainsaw
HorticultureArboricultureClearing and Grubbing Highway (complete job)
HorticultureArboricultureSafety check and operation of Excavator for clearing and grubbing
HorticultureArboricultureSafety Inspection and use of Hydraulic Harvester Head attachment
HorticultureArboricultureCut tree using petrol powered pole saw
HorticultureArboricultureMulching of trees and branches using a Brush/ Wood Chipper (extended version)
HorticultureArboricultureFelling of tree using Climbing Technique and using wood chipper
HorticultureArboricultureCut tree using a gasoline powered chainsaw
HorticultureArboricultureCut tree using gasoline powered pole saw
HorticultureArboricultureInspection and use of gasoline powered chainsaw
HorticultureLandscape HorticulturePruning with Hand Pruners/ Shears (Secateurs)
HorticultureLandscape HorticultureClear the area and move existing pot plants
HorticultureLandscape HorticultureSafety Inspection and use of Horizontal Grinder
HorticultureAgricultureInspection and use of self-propelled Sprayer
HorticultureAgricultureInspection and use of Tractor Implement Sprayers
HospitallityKitchenInstall Kitchen Appliances
HospitallityKitchenUse of electric appliances or tools
HospitallityKitchenUse of kitchen gas cookers and appliances
HospitallityKitchenUsing knives and sharp tools
HospitallityKitchenUsing a commercial dishwasher
HospitallityKitchenClean kitchen appliances or tools
HospitallityKitchenWorking in a commercial kitchen
HospitallityKitchenFood Handling
HospitallityKitchenFood Safety
HospitallityKitchenStorage and use of Hazardous Chemicals/ Substances
HospitallitySecurityInstall cameras and sensors
HospitallitySecurityReplace existing cameras and sensors
Pest ControlAnt, Insect and spider controlPesticide spraying by hand
Pest ControlFeral animal controlSafety inspection and use of firearms for hunting
Pest ControlFeral animal controlGround Baiting using 1080 poison
Pest ControlFeral animal controlAutomated corral trapping
Pest ControlFeral animal controlAerial Shooting and Baiting from helicopters
Pest ControlFeral animal controlFoot hold trapping
Pest ControlFeral animal controlPreparing a tranquillizer syringe, dart and use of tranquilising firearms
Pest ControlFeral animal controlPreparing a tranquillizer syringe and dart
Primary IndustriesLivestock GrazingAerial Mustering
Primary IndustriesLivestock GrazingInspect and Drive Off Road Vehicle/ 4WD
Primary IndustriesLivestock GrazingMustering using Off Road and 4WD vehicles
Primary IndustriesLivestock GrazingInspection and use of Tractor
SecuritySecurity PatrolsPatrol of Student Accommodation Facility
SecuritySecurity PatrolsCheck and Lock down pool area
SecuritySecurity PatrolsCheck Carpark
SecuritySecurity PatrolsCheck Gymnasium
SecuritySecurity PatrolsCheck exterior of premises
SecuritySecurity PatrolsInternal Patrols of Student Accommodation
Traffic ManagementTraffic controlEstablish a Safe Work Zone-Working on or adjacent road (Traffic Control)
Traffic ManagementTraffic controlTraffic control station set up and operation of traffic control (Stop/ slow bat)
Traffic ManagementTraffic controlTraffic control in night conditions
TransportTruckDelivery and unloading of mobile plant
TransportTruckInspect and drive truck
TransportTruckDeliver materials to site and unload manually
TransportTruckLoading materials onto truck by hand
TransportTruckDriving long distances
TransportTruckLoad restraint
TransportTruckUnload truck using a crane
TransportFurniture RemovalistLift and carry looses furniture
Waste and resource recoveryConstruction and DemolitionDelivery of skip bin
Waste and resource recoveryConstruction and DemolitionChangeover of skip bin
Waste and resource recoveryConstruction and DemolitionPick up filled skip bin
Waste and resource recoveryLiquid wasteRemoval of liquid waste milk
Waste and resource recoveryLiquid wastePump out waste milk using a vacuum truck
Waste and resource recoveryLiquid wastePump out domestic septic tank using a vacuum truck
Waste and resource recoveryLiquid wastePump out grease trap tank using a vacuum truck
Waste and resource recoverySweepersInspection and use of Truck Mounted Street Sweeper
Waste and resource recoverySweepersInspection and use of industrial automatic ride on sweeper/scrubber