High Risk Construction Work
You must prepare, keep, comply with and review a safe work method statement for high risk construction work.
To be able to carry out construction work, a person must complete an introductory safety training course called ‘general construction induction training’. This is also commonly known as ‘white card’ training.
High risk construction work:
- involves a risk of a person falling more than 2 m
- is carried out on a telecommunication tower
- involves demolition of an element of a structure that is load-bearing
- involves demolition of an element of a structure that is related to the physical integrity of the structure
- involves, or is likely to involve, disturbing asbestos
- involves structural alteration or repair that requires temporary support to prevent collapse
- is carried out in or near a confined space
- is carried out in or near a shaft or trench deeper than 1.5 m or a tunnel
- involves the use of explosives
- is carried out on or near pressurised gas mains or piping
- is carried out on or near chemical, fuel or refrigerant lines
- is carried out on or near energised electrical installations or services
- is carried out in an area that may have a contaminated or flammable atmosphere
- involves tilt-up or precast concrete
- is carried out on, in or adjacent to a road, railway, shipping lane or other traffic corridor in use by traffic other than pedestrians
- is carried out in an area of a workplace where there is any movement of powered mobile plant
- is carried out in areas with artificial extremes of temperature
- is carried out in or near water or other liquid that involves a risk of drowning
- involves diving work