Construction JSA

JSA, JHA, THA, JSEA or a SWMS?

What’s the difference?

A Job Safety Analysis (JSA) also known as a Job Hazard Analysis (JHA), or Task Hazard Analysis (THA), Job Safety and Environemtal Analysis (JSEA) or a Safe Work Method Statement (SWMS) in essence are all the same thing.

They all have 3 main elements:

  1. Job Step (What are you going to do)
  2. Potential Hazard (What can go wrong or cause harm)
  3. Control measure (What are you going to do to make sure it doesn’t go wrong or cause harm)

A JSEA also considers the environmental hazards/ impacts and controls. 

No matter what you call it, The JSEAsy safety Management Software creates a report with the terminology of your choosing.

The main objective of a Job Safety Analysis (JSA) is to identify potential hazards before they lead to harm, ensuring that tasks are completed safely.   
When you set your JSEAsy defaults, the wording on the buttons and on the reports will automatically update to match the default selection.

Set your defaults in the JSEAsy Environmental, Health and Safety Software

A Simplified report or a Full Hybrid report

Set your JSEAsy defaults and the wording on the buttons and on the reports will automatically update to match the default selection for JSA, SWMS, JHA, THA …

People often ask, “Can I have a Safe Work Method Statements (SWMS) for construction?” “A document that covers everything?”  The answer is not really. Well, you could create a document that covers most areas of construction, but it would be hundreds of pages long and would contain more items that did not apply to your project, than items that did.

A Safe Work Method Statements (SWMS) needs to document step by step how you are going to do a particular job. Not all jobs are the same! Are you going to dig footings for a project, put on a roof, or anything in between?

A Safe Work Methos Statement (SWMS), like a as a job safety analysis (JSA) or a job safety and environmental analysis (JSEA), is a systematic process used to identify and mitigate potential hazards associated with specific tasks or jobs in the construction industry. It plays a crucial role in ensuring the safety and well-being of workers by proactively identifying and addressing potential risks before they lead to accidents or injuries..

According to the WHS Act, it is mandatory to create a Safe Work Method Statement (SWMS) for construction activities classified as High-Risk.
Ensuring safety in high-rise construction involves rigorous planning, comprehensive training, and strict adherence to protocols for risk mitigation.

Construction Site Hazards: Identifying and Mitigating Dangers for Worker Safety

Construction sites pose various hazards, including falls from heights, electrical shocks, machinery accidents, exposure to hazardous substances, noise pollution, manual handling injuries, falling objects and potential collapse of structures.

Workers may also face risks from inadequate training, lack of personal protective equipment (PPE), and adverse weather conditions. Overall, vigilance and adherence to safety protocols are essential to mitigate these construction hazards.

A SWMS provides a clear, step-by-step guide on how to perform a task safely.

It ensures that everyone involved understands the necessary steps, reducing the likelihood of accidents due to confusion or misunderstanding.
 
The JSEAsy Safety Management Software builds your site-specific SWMS for your construction job by adding templates of the steps you are going to take, in the order in which you are going to take them.
 

Watch a detailed demonstration video on how to create a new site-specific SWMS using existing templates.

Making SWMS has never been easier, just pick your job steps and the JSEAsy safety management software does all the hard work for you.

A PCBU must prepare a SWMS—or ensure a SWMS has been prepared—for high-risk construction work activities.
A SWMS has 3 main elements: Job Step, Potential Hazard, Hazard Control Measures.
You must ensure appropriate safety measures on a Construction Site

Guidelines for Safe Work Method Statements (SWMS)

Identifying, Specifying, and Implementing Safety Measures.

A Safe Work Method Statement (SWMS) must:

  1. identify the work that is high risk construction work; and
  2. specify hazards relating to the high-risk construction work and risks to health and safety associated with those hazards; and
  3. describe the measures to be implemented to control the risks; and
  4. describe how the control measures are to be implemented, monitored and reviewed
  5. be prepared taking into account all relevant matters including
    1. circumstances at the workplace that may affect the way in which the high-risk construction work is carried out
    2. if the high-risk construction work is carried out in connection with a construction project—the WHS management plan that has been prepared for the workplace; and
  6. be set out and expressed in a way that is readily accessible and understandable to persons who use it
  7. A SWMS should be short and focus on describing the specific hazards identified for the high-risk construction work to be undertaken and the control measures to be put in place, so the work is carried out safely.

JSEA/ SWMS Example

Below is an example of templates you may insert into your site-specific SWMS for a project to construct a new entrance into an existing building:

  1. Site Orientation/ Induction
  2. Claim Work Area
  3. Inspect and drive truck
  4. Delivery of Skip bin
  5. Demolition/ Removal of existing floor tiles Using an electric Jack Hammer/ Demolition Hammer
  6. Cleanup work area
  7. Move debris by hand using a shovel
  8. Push Wheelbarrow on site
  9. Sweep Floor
  10. Demolition of existing plasterboard lined partition stud wall
  11. Cut masonry wall with a Quick Cut Diamond blade saw
  12. Part demolition of existing brick wall to form new opening
  13. Install Acro prop
  14. Knock out bricks
  15. Cleaning up work area
  16. Push Wheelbarrow on site
  17. Sweep Floor
  18. Installation of Hold Down bolts into existing Concrete
  19. Acceptance of delivery to site for materials via Crane Truck
  20. Carrying materials from storage area to work area
  21. Land structural steel columns into position by Hand
  22. Tension nuts using a battery powered rattle gun
  23. Lift new steel lintel into position using duct lifters
  24. Connect steel members
  25. Tension nuts using a battery powered rattle gun
  26. Acceptance of delivery to site for materials by hand
  27. Installation of plasterboard linings
  28. Prepare for Floor tiling, connect hose to existing water supply tap
  29. Mixing cement with a portable electric mixer
  30. Wash out mixer
  31. Placing a cement screed
  32. Mix adhesive in a bucket using an electric drill
  33. Laying floor tiles
  34. Cutting tiles using an angle grinder
  35. Mix grout in a bucket using an electric drill
  36. Grout tiles
  37. Wash out bucket
  38. Cleaning up tiling work area
  39. Painting of Walls
  40. Cleaning up work area
  41. Monitoring and Review of SWMS

 

Automating the process

When you insert a template, it automatically brings with it:

  1. The main process step
  2. The sub process steps associated in undertaking the task
    1. The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
    2. The Risk Rating for undertaking the task (You can also change this if you want to)
    3. The Hazard Control measure (you can also delete or add any of these with a simple click)
    4. The revised risk rating after applying the control (You can also change this if you want to)
    5. Any required PPE (you can also delete or add any of these with a simple click)
    6. Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
    7. Any preoperational inspections required (you can also delete or add any of these with a simple click)
    8. Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
This is an extract of an example Full SWMS Report generated from the JSEAsy EHS Software.
Practice surveying safety: utilize proper equipment, follow established procedures, and maintain situational awareness to ensure a secure work environment.

Creating Site-Specific SWMS Reports with JSEAsy Safety Management Software

Creating a site-specific SWMS is easy using JSEAsy . Once created, you can print/ save a pdf of either a full or simplified SWMS report. 

Download an example of a full SWMS report generated from the JSEAsy EHS Software.

Download an example of a simplified SWMS report generated from the JSEAsy EHS Software.

The JSEAsy software comes preloaded with hundreds of templates (job steps) to build your site-specific SWMS with.

Safe Operating Procedures (SOP) and Plant and Equipment Risk Assessments (PERA) are also included in all versions.

The JSEAsy Premium EHS Software is your total WHS management system.

The JSEAsy safety management software is available for download and install on a PC, or hosted in the cloud

JSEAsy Environmental Health and Safety (EHS) Software

Process: Click the Links below to learn more about JSEAsy Safety Management Software and the process.

View an Infographic about How JSEAsy Software works.

See the different versions of the JSEAsy software.

When you buy or Rent JSEAsy you have access to all of the latest version SWMS templates, for all trades and industries.

Download the JSEAsy latest version SWMS template register.

This is a register sorted by industry type and industry specific of all of the SWMS templates included in the latest version of the JSEAsy Safety Management Software.

There are a multitude of Hazardous Manual Tasks in Construction
Thousands of SWMS templates included in the JSEAsy SWMS software.

Save time and Money!

Hundreds of templates included – 1 low price – Exceptional value!

When you buy or rent the JSEAsy Safety Software, not only to get all of the templates specifically for construction works and trades but you also get all of the templates for all of the other industries and trades as well. Builders don’t just build!

You will also benefit from many of the templates from many other industry templates like transport and horticulture and cleaning. 

 

A list of all the templates included in all versions of the JSEAsy EHS software is shown below.

  • You can search by scrolling through the list of all templates.
  • You can apply filters to the list by selecting an Industry Type
  • You can further refine the list by selecting and industry type and an industry specific.
  • You can do key word searches for templates.  If you can’t find what you are looking for try:
    • Shortening the search term. For example, searching for “deliv” would show deliver and deliveries, but if you searched for deliveries, it would exclude deliver.
    • Look for a synonyms/ alternate word for what you are looking for. E.g. tube or pipe
Industry TypeIndustry SpecificWork Description
AdministrationOfficePhotocopying
All Industry TypesAll TradesAccept load to vehicle from forklift (3rd Party operator) and Loading by hand
All Industry TypesAll TradesAcceptance of delivery to site for materials
All Industry TypesAll TradesAcceptance of delivery to site for materials via Crane Truck
All Industry TypesAll TradesAccess roof via Boom Lift
All Industry TypesAll TradesAccess roof via fixed access ladder
All Industry TypesAll TradesAccess roof via Ladder
All Industry TypesAll TradesAccess Roof via scaffold stair access
All Industry TypesAll TradesAccess roof via Scissor Lift
All Industry TypesAll TradesAccess work area using a platform ladder
All Industry TypesAll TradesAccess work area using a step ladder
All Industry TypesAll TradesAccess work area using 'Hop-Up' trestle ladder/ work platform
All Industry TypesAll TradesAccess work area via a mobile scaffold
All Industry TypesAll TradesAccess work area via a scaffold/ working at heights from a scaffold
All Industry TypesAll TradesApply touch up paint
All Industry TypesAll TradesCarrying materials from storage area to work area
All Industry TypesAll TradesCharging of Li-Ion batteries for use with cordless tools
All Industry TypesAll TradesClaim Work Area
All Industry TypesAll TradesCleaning up work area
All Industry TypesAll TradesConnect hose to existing water supply tap
All Industry TypesAll TradesCut materials using an electric mitre saw
All Industry TypesAll TradesCut steel using a battery powered angle grinder
All Industry TypesAll TradesCut Steel using an Angle Grinder
All Industry TypesAll TradesCut strapping off around pack of materials
All Industry TypesAll TradesCutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool
All Industry TypesAll TradesDrill hole into masonry surface with a battery powered rotary hammer drill
All Industry TypesAll TradesDrill hole into masonry surface with an electric rotary hammer drill
All Industry TypesAll TradesDrill hole using a Battery Powered Drill
All Industry TypesAll TradesDrill hole using an electric drill
All Industry TypesAll TradesDriving in and out of carparks and on customer premises
All Industry TypesAll TradesDriving in and out of carparks and on customer premises
All Industry TypesAll TradesErection and use of mobile scaffold
All Industry TypesAll TradesHigh Risk Construction Work covered in this SWMS
All Industry TypesAll TradesInform facilities / operations and security personnel of work location(s)
All Industry TypesAll TradesInspect and drive passenger/ light commercial vehicle
All Industry TypesAll TradesInspect and drive passenger/ light commercial vehicle on or off site
All Industry TypesAll TradesInspection and use of Generator
All Industry TypesAll TradesInspection and use of petrol powered high pressure water sprayer
All Industry TypesAll TradesInstall screws using a Battery Powered Drill
All Industry TypesAll TradesInstall screws using a tek gun
All Industry TypesAll TradesListening to music while working
All Industry TypesAll TradesLoading Materials onto roof using an EWP
All Industry TypesAll TradesLoading materials onto truck using a crane and by hand
All Industry TypesAll TradesMarking Out Slab or Ground
All Industry TypesAll TradesMonitoring and review of JHA
All Industry TypesAll TradesMonitoring and Review of SWMS
All Industry TypesAll TradesMove materials using a trolley (sack Truck)
All Industry TypesAll TradesMoving materials around on a trolley
All Industry TypesAll TradesPush Wheel Barrow on site
All Industry TypesAll TradesRefuelling of machinery
All Industry TypesAll TradesRepeat the above process steps until completion of task
All Industry TypesAll TradesSafety Check And Use Of Boom Lift (extended version)
All Industry TypesAll TradesSafety Check And Use Of Scissor Lift (Extended version)
All Industry TypesAll TradesSafety inspection and use of Forklift
All Industry TypesAll TradesSite orientation of domestic residence
All Industry TypesAll TradesSite Orientation/ Induction
All Industry TypesAll TradesSweeping Floor or ground
All Industry TypesAll TradesUndertake Clients general all sites induction
All Industry TypesAll TradesUnloading of shipping container with forklift and by hand
All Industry TypesAll TradesUsing an Angle Grinder
All Industry TypesAll TradesUsing an Existing roof anchorpoint system
All Industry TypesAll TradesVacuum
All Industry TypesAll TradesWelding with a portable Electric Welder
All Industry TypesAll TradesWorking at height from a boom lift
All Industry TypesAll TradesWorking at height from a scissor lift
All Industry TypesAll TradesWorking at heights - Generally
All Industry TypesAll TradesWorking at heights - Genrally
All Industry TypesAll TradesWorking in an area with the risk of Coronavirus, Covid-19, Influenza or similar
All Industry TypesAll TradesWorking in Cold Conditions
All Industry TypesAll TradesWorking in High Wind Conditions
All Industry TypesAll TradesWorking in hot conditions
All Industry TypesAll TradesWorking in isolation
All Industry TypesAll TradesWorking in the rain
All Industry TypesAll TradesWorking where there is movement of powered mobile plant
All Industry TypesAll TradesWrite up incident report
Automotive and PlantMechanicalInspection and use of Four Post Vehicle Hoist
Automotive and PlantMechanicalInspection and use of Two Post Vehicle Hoist
Automotive and PlantMechanicalon site Servicing to diesel powered vehicle
Automotive and PlantMechanicalReplace diesel fuel filters
Automotive and PlantMechanicalReplace fuel filters
Automotive and PlantMechanicalReplace petrol fuel filters
Automotive and PlantMechanicalSafety inspection and use of TTL Hydraulic Torque Wrench and hydraulic pump
Automotive and PlantMechanicalSafety inspection and use of TTS Hydraulic Torque Wrench and hydraulic pump
Automotive and PlantMechanicalSafety inspection and use of TTX Hydraulic Torque Wrench and hydraulic pump
Automotive and PlantMechanicalServicing to vehicle in workshop
Automotive and PlantServicingChange Spark Plugs
Automotive and PlantServicingCheck batteries and charging system
Automotive and PlantServicingCheck system for gas leaks
Automotive and PlantServicingGrease moving parts and greaseable joints
Automotive and PlantServicingInspect/ Repair skirts and scrubber or sweeping brushes
Automotive and PlantServicingInspection and use of a gasoline powered air compressor
Automotive and PlantServicingInspection and use of petrol powered air compressor
Automotive and PlantServicingJack up vehicle/machine
Automotive and PlantServicingOn site Servicing to gasoline powered vehicle
Automotive and PlantServicingon site Servicing to petrol powered vehicle
Automotive and PlantServicingOpen engine cover/ bonnet/ service compartment
Automotive and PlantServicingRemove and replace wheels using a pneumatic rattle gun
Automotive and PlantServicingReplace air filter
Automotive and PlantServicingReplace brake pads using a pneumatic rattle gun
Automotive and PlantServicingReplace engine oil and filters
Automotive and PlantServicingReplace hydraulic hose
Automotive and PlantServicingReplace hydraulic oil and filters
Automotive and PlantServicingReplace radiator coolant
Automotive and PlantServicingservicing a ride on electric sweeper (Complete Job)
Automotive and PlantServicingservicing a walk gas operated behind sweeper/scrubber (Complete Job)
Automotive and PlantServicingServicing to hybrid industrial automatic ride on sweeper/scrubber
Automotive and PlantServicingServicing to hybrid industrial automatic ride on sweeper/scrubber (Complete job)
Automotive and PlantServicingTune engine
CleaningAll Cleaning industriesCarpet Cleaning
CleaningAll Cleaning industriesInspection and use of electric high pressure water sprayer
CleaningAll Cleaning industriesInspection and use of gasoline powered blower/ vacuum
CleaningAll Cleaning industriesInspection and use of gasoline powered high pressure water sprayer
CleaningAll Cleaning industriesInspection and use of petrol powered blower/ vacuum
CleaningCommercial CleaningClean bathroom
CleaningCommercial CleaningClean Glass shower screen with a cloth
CleaningCommercial CleaningClean Glass with a cloth
CleaningCommercial CleaningClean mirror with a cloth
CleaningCommercial CleaningClean Window Using Pure Water Technology
CleaningCommercial CleaningClean Windows Using rope Access
CleaningCommercial CleaningClean Windows with mop and squeegee
CleaningCommercial CleaningCleaning of hard surfaces
CleaningCommercial CleaningCleaning of office and showroom
CleaningCommercial CleaningCleaning of residence
CleaningCommercial CleaningCleaning of Rest Rooms / Toilets
CleaningCommercial CleaningGain access to work are using Rope Access
CleaningCommercial CleaningInspection and use of Carpet Extractor
CleaningCommercial CleaningInspection and use of High-Speed Propane (LPG) Powered Floor Buffer (Burnisher)
CleaningCommercial CleaningInspection and use of Low-Speed Electric Floor Buffer
CleaningCommercial CleaningInspection and use of planetary floor polisher
CleaningCommercial CleaningInspection and use of walk behind battery powered floor scrubber
CleaningCommercial CleaningRemove bag from bins and waste paper baskets
CleaningCommercial CleaningSteam cleaning of tiles
CleaningDomestic CleaningMopping Floor
ConstructionAir Conditioning and RefrigerationAccess ceiling space via Ladder
ConstructionAir Conditioning and RefrigerationCore hole through masonry wall with a battery powered rotary hammer drill
ConstructionAir Conditioning and RefrigerationCut aluminium angles using a hacksaw and mitre box
ConstructionAir Conditioning and RefrigerationCut copper pipe with tube cutter
ConstructionAir Conditioning and RefrigerationCut hole into existing plasterboard ceiling using a key hole plasterboard saw
ConstructionAir Conditioning and RefrigerationCut Steel/ Unistrut with drop saw
ConstructionAir Conditioning and RefrigerationDisconnect pipework form existing plant
ConstructionAir Conditioning and RefrigerationFilling & testing of pipework
ConstructionAir Conditioning and RefrigerationFit Pipe insulation over pipes
ConstructionAir Conditioning and RefrigerationFit Unistrut brackets onto masonry wall
ConstructionAir Conditioning and RefrigerationFix aluminium channels to existing slab using battery powered hammer drill
ConstructionAir Conditioning and RefrigerationHang condensing unit onto masonry wall
ConstructionAir Conditioning and RefrigerationHang Fan cooler unit inside cool room
ConstructionAir Conditioning and RefrigerationInstall ceiling registers
ConstructionAir Conditioning and RefrigerationInstall flexi ductwork and zone motors in ceiling space
ConstructionAir Conditioning and RefrigerationInstall insulated ceiling panels to cool room
ConstructionAir Conditioning and RefrigerationInstall new wall mounted unit
ConstructionAir Conditioning and RefrigerationInstall TX Valve
ConstructionAir Conditioning and RefrigerationInstallation of Cool Room
ConstructionAir Conditioning and RefrigerationInstallation of ducted system air conditioner
ConstructionAir Conditioning and RefrigerationInstallation of new refrigeration System to new supermarket (complete job)
ConstructionAir Conditioning and RefrigerationInstallation of refrigeration system to cool room
ConstructionAir Conditioning and RefrigerationInstallation of support angles or channels to hanging rods
ConstructionAir Conditioning and RefrigerationInstallation of threaded rod hanging bars
ConstructionAir Conditioning and RefrigerationInstallation of underfloor refrigeration pipework
ConstructionAir Conditioning and RefrigerationInstallation of wall hung split system air conditioner
ConstructionAir Conditioning and RefrigerationMixing Polyurethane Isocyanate in a bucket using an electric drill
ConstructionAir Conditioning and RefrigerationMount condensing unit onto preinstalled Unistrut brackets
ConstructionAir Conditioning and RefrigerationPlace copper pipes into trench ducting
ConstructionAir Conditioning and RefrigerationPour Polyurethane Isocyanate into pipe duct
ConstructionAir Conditioning and RefrigerationPressure testing of pipework with nitrogen and charge with refrigerant (HCFC)
ConstructionAir Conditioning and RefrigerationReclaim refrigerant gas from existing system
ConstructionAir Conditioning and RefrigerationRefrigerant charge the system using a vacuum pump
ConstructionAir Conditioning and RefrigerationRemove existing wall mounted unit
ConstructionAir Conditioning and RefrigerationReplacement of ducted system air conditioner
ConstructionAir Conditioning and RefrigerationReplacement of wall hung split system air conditioner
ConstructionAir Conditioning and RefrigerationRun connecting copper pipework and fit off
ConstructionAir Conditioning and RefrigerationRun Pipe work through existing ceiling space
ConstructionAir Conditioning and RefrigerationSecure pipework to structure with saddles
ConstructionAir Conditioning and RefrigerationSilver solder copper pipes together
ConstructionAir Conditioning and RefrigerationStand up cool room panels and fit into bottom track
ConstructionAll TradesAccept load to vehicle from forklift (3rd Party operator) and Loading by hand
ConstructionAll TradesAcceptance of delivery to site for materials
ConstructionAll TradesAcceptance of delivery to site for materials via Crane Truck
ConstructionAll TradesAccess roof via Boom Lift
ConstructionAll TradesAccess roof via fixed access ladder
ConstructionAll TradesAccess roof via Ladder
ConstructionAll TradesAccess Roof via scaffold stair access
ConstructionAll TradesAccess roof via Scissor Lift
ConstructionAll TradesAccess work area using a platform ladder
ConstructionAll TradesAccess work area using a step ladder
ConstructionAll TradesAccess work area using 'Hop-Up' trestle ladder/ work platform
ConstructionAll TradesAccess work area via a mobile scaffold
ConstructionAll TradesAccess work area via a scaffold/ working at heights from a scaffold
ConstructionAll TradesApply touch up paint
ConstructionAll TradesCarrying materials from storage area to work area
ConstructionAll TradesCharging of Li-Ion batteries for use with cordless tools
ConstructionAll TradesClaim Work Area
ConstructionAll TradesCleaning up work area
ConstructionAll TradesConnect hose to existing water supply tap
ConstructionAll TradesCut materials using an electric mitre saw
ConstructionAll TradesCut steel using a battery powered angle grinder
ConstructionAll TradesCut Steel using an Angle Grinder
ConstructionAll TradesCut strapping off around pack of materials
ConstructionAll TradesCutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool
ConstructionAll TradesDrill hole into masonry surface with a battery powered rotary hammer drill
ConstructionAll TradesDrill hole into masonry surface with an electric rotary hammer drill
ConstructionAll TradesDrill hole using a Battery Powered Drill
ConstructionAll TradesDrill hole using an electric drill
ConstructionAll TradesDriving in and out of carparks and on customer premises
ConstructionAll TradesDriving in and out of carparks and on customer premises
ConstructionAll TradesErection and use of mobile scaffold
ConstructionAll TradesHigh Risk Construction Work covered in this SWMS
ConstructionAll TradesInform facilities / operations and security personnel of work location(s)
ConstructionAll TradesInspect and drive passenger/ light commercial vehicle
ConstructionAll TradesInspect and drive passenger/ light commercial vehicle on or off site
ConstructionAll TradesInspection and use of Generator
ConstructionAll TradesInspection and use of petrol powered high pressure water sprayer
ConstructionAll TradesInstall screws using a Battery Powered Drill
ConstructionAll TradesInstall screws using a tek gun
ConstructionAll TradesListening to music while working
ConstructionAll TradesLoading Materials onto roof using an EWP
ConstructionAll TradesLoading materials onto truck using a crane and by hand
ConstructionAll TradesMarking Out Slab or Ground
ConstructionAll TradesMonitoring and review of JHA
ConstructionAll TradesMonitoring and Review of SWMS
ConstructionAll TradesMove materials using a trolley (sack Truck)
ConstructionAll TradesMoving materials around on a trolley
ConstructionAll TradesPush Wheel Barrow on site
ConstructionAll TradesRefuelling of machinery
ConstructionAll TradesRepeat the above process steps until completion of task
ConstructionAll TradesSafety Check And Use Of Boom Lift (extended version)
ConstructionAll TradesSafety Check And Use Of Scissor Lift (Extended version)
ConstructionAll TradesSafety inspection and use of Forklift
ConstructionAll TradesSite orientation of domestic residence
ConstructionAll TradesSite Orientation/ Induction
ConstructionAll TradesSweeping Floor or ground
ConstructionAll TradesUndertake Clients general all sites induction
ConstructionAll TradesUnloading of shipping container with forklift and by hand
ConstructionAll TradesUsing an Angle Grinder
ConstructionAll TradesUsing an Existing roof anchorpoint system
ConstructionAll TradesVacuum
ConstructionAll TradesWelding with a portable Electric Welder
ConstructionAll TradesWorking at height from a boom lift
ConstructionAll TradesWorking at height from a scissor lift
ConstructionAll TradesWorking at heights - Generally
ConstructionAll TradesWorking at heights - Genrally
ConstructionAll TradesWorking in an area with the risk of Coronavirus, Covid-19, Influenza or similar
ConstructionAll TradesWorking in Cold Conditions
ConstructionAll TradesWorking in High Wind Conditions
ConstructionAll TradesWorking in hot conditions
ConstructionAll TradesWorking in isolation
ConstructionAll TradesWorking in the rain
ConstructionAll TradesWorking where there is movement of powered mobile plant
ConstructionAll TradesWrite up incident report
ConstructionBricklayingAcid wash surface by hand
ConstructionBricklayingBricklaying
ConstructionBricklayingBricklaying to new project home
ConstructionBricklayingCarry blocks by hand
ConstructionBricklayingCarry bricks using a mechanical brick carrier (Clamps)
ConstructionBricklayingCut bricks using a gasoline powered brick saw
ConstructionBricklayingCut bricks using a petrol powered brick saw
ConstructionBricklayingCut bricks using an angle grinder
ConstructionBricklayingInstallation of lintel by hand
ConstructionBricklayingInstallation of viscourse
ConstructionBricklayingLoad bricks onto scaffold by hand
ConstructionBricklayingMixing cement with a portable petrol powered mixer
ConstructionBricklayingMixing cement/ mortar with a portable gasoline powered mixer
ConstructionBricklayingMixing cement/ mortar with a portable petrol powered mixer
ConstructionBricklayingSet up mortar boards
ConstructionBricklayingSet up Profolds to corners
ConstructionBricklayingWash down brick wall
ConstructionCarpentry1st fix carpentry to new 2 story dwelling using a Pneumatic and Impulse Nail Gun
ConstructionCarpentry1st fix carpentry to new dwelling using a Pneumatic and Impulse Nail Gun
ConstructionCarpentryApply construction adhesive using a calking gun
ConstructionCarpentryCreate temporary work bench using trestles and planks
ConstructionCarpentryCut fibre cement sheeting using electric shears
ConstructionCarpentryCut fibre cement sheeting using hand operated mechanical shears
ConstructionCarpentryCut Hebel/ Autoclaved Aerated Concrete with a diamond blade circular saw
ConstructionCarpentryCut timber beading using a hand saw and mitre box
ConstructionCarpentryCut timber using a battery powered circular saw
ConstructionCarpentryCut timber using a battery powered reciprocating saw
ConstructionCarpentryCut timber using a circular saw
ConstructionCarpentryCut timber using a jigsaw
ConstructionCarpentryCut timber using a reciprocating saw
ConstructionCarpentryCut timber using an electric mitre saw
ConstructionCarpentryCut wood beading using a hand saw and mitre box
ConstructionCarpentryCut wood using a battery powered circular saw
ConstructionCarpentryCut wood using a circular saw
ConstructionCarpentryCut wood using an electric jigsaw
ConstructionCarpentryCut wood using an electric mitre saw
ConstructionCarpentryDaily preoperational inspection of a Pneumatic (Air) Nail Gun
ConstructionCarpentryDaily preoperational inspection of an Impulse (gas) Nail Gun
ConstructionCarpentryEase/ adjust existing doors
ConstructionCarpentryFix fibre cement cladding sheet in place and nail by hand
ConstructionCarpentryFix fibre cement soffit/ eaves sheet in place and nail by hand
ConstructionCarpentryInspection and use of electric air compressor
ConstructionCarpentryInstall ceiling joist, Hanging beams, stabilisers, etc
ConstructionCarpentryInstall Hebel Panel
ConstructionCarpentryInstall plywood flooring
ConstructionCarpentryInstall solid strip timber flooring (Secret Fix) to timber subfloor
ConstructionCarpentryInstall solid strip wood flooring (Secret Fix) to wood subfloor
ConstructionCarpentryInstall 'STRUCTAflor' particle board flooring
ConstructionCarpentryInstall timber roof trusses by hand
ConstructionCarpentryInstall trimmers/ noggings to wood framing
ConstructionCarpentryInstall wood roof trusses by hand
ConstructionCarpentryInstall wood wall linings using a battery powered drill
ConstructionCarpentryInstallation of Doors and Door Hardware
ConstructionCarpentryInstallation of eaves linings to new domestic residence
ConstructionCarpentryInstallation of floor joist
ConstructionCarpentryInstallation of Timber Purlins
ConstructionCarpentryManufacture timber wall frames using a mitre saw and an Impulse (gas) Nail Gun
ConstructionCarpentryManufacture timber wall frames using a mitre saw and Pneumatic (Air) Nail Gun
ConstructionCarpentryMark out slab using a chalk line
ConstructionCarpentryMeasure for cladding above roof
ConstructionCarpentryMeasure perimeter of house
ConstructionCarpentryNail timber using a pneumatic (Air) nail gun
ConstructionCarpentryNail timber using an Impulse (gas) Nail Gun
ConstructionCarpentryPassing up Sheets and Accessories from the ground
ConstructionCarpentryPosition floor boards together using a plank jack/ floor dog
ConstructionCarpentryRemoval of existing doors
ConstructionCarpentrySet up trestle scaffold
ConstructionCarpentryStand up wall frames
ConstructionCivilArrive at domestic site with truck and establish unloading area
ConstructionCivilArrive at domestic site with truck and trailer and establish unloading area
ConstructionCivilBack Fill trench by hand with original spoil
ConstructionCivilBack Fill trench using excavator with original spoil
ConstructionCivilClean street and footpath
ConstructionCivilCompact area using a gasoline powered leg rammer
ConstructionCivilCompact area using a gasoline powered vibrating plate
ConstructionCivilCompact area using a petrol powered leg rammer
ConstructionCivilCompact area using a petrol powered vibrating plate
ConstructionCivilCompact area with Road roller (roller-compactor)
ConstructionCivilCutting Bitumen with a Quick Cut Diamond blade saw
ConstructionCivilDaily preoperational inspection of a Pneumatic Jack Hammer
ConstructionCivilDelivery and unloading of mobile plant
ConstructionCivilDelivery, Safety Check And Use Of Dingo
ConstructionCivilDig Hole by hand
ConstructionCivilDig hole with power driven auger
ConstructionCivilDig Trench by hand
ConstructionCivilDig trench using a chain trencher
ConstructionCivilDumping/Unloading load on ground using a tip truck/ dump truck
ConstructionCivilInspect and drive Tip Truck/ Dump Truck
ConstructionCivilInspection and use of diesel powered air compressor
ConstructionCivilInspection and use of Motor Grader/ Road Grader
ConstructionCivilInstallation of lintel using a skid steer loader
ConstructionCivilLaying asphalt with paver which is filled from tipper
ConstructionCivilLaying blue metal paver which is filled from tipper
ConstructionCivilLoad skid steer loader onto trailer using aluminium ramps
ConstructionCivilLoad skid steer loader onto truck using aluminium ramps
ConstructionCivilMixing concrete with a portable mixer
ConstructionCivilMove soil by hand using a shovel
ConstructionCivilOperation of drilling rig and soil sampling
ConstructionCivilPlace rubble around domestic site using a skid steer loader
ConstructionCivilPlanning for wet weather and flooding events
ConstructionCivilRaising Sewer/ Stormwater Pits and Valve covers in an existing bitumen roadway
ConstructionCivilRemove and fit attachments on Excavator
ConstructionCivilRemove and fit attachments on skid steer loader
ConstructionCivilRemove rubbish and debris from domestic site using skid steer loader and truck
ConstructionCivilRemove soil from domestic site using a skid steer loader and truck
ConstructionCivilRemove spoil from auger using wheel barrow
ConstructionCivilSafety check and operation of Excavator
ConstructionCivilSafety check and operation of Excavator for trenching and excavations
ConstructionCivilSafety inspection and use of skid steer loader
ConstructionCivilSafety inspection and use of wheeled front end loader
ConstructionCivilSet up and use laser level
ConstructionCivilSite Set Out
ConstructionCivilSpread rubble around site using a skid steer loader
ConstructionCivilSpreading soil with Shovel and Rake
ConstructionCivilTack coating (including use of hand lance) prior to laying asphalt
ConstructionCivilUnload skid steer excavator from trailer using aluminium ramps
ConstructionCivilUnload skid steer loader from trailer using aluminium ramps
ConstructionCivilUnload skid steer loader from truck using aluminium ramps
ConstructionCivilUsing a pneumatic Jack Hammer/ pneumatic Breaker/ Demolition Hammer
ConstructionConcreter and Concrete RepairAbrasive blasting
ConstructionConcreter and Concrete RepairApply high strength repair mortar
ConstructionConcreter and Concrete RepairApply surface sealant material (Kahfill) to face of crack
ConstructionConcreter and Concrete RepairConcrete and reinforcement repairs
ConstructionConcreter and Concrete RepairConcrete crack repair and injection
ConstructionConcreter and Concrete RepairConcrete Delivery and Pumping
ConstructionConcreter and Concrete RepairDig Hole by hand
ConstructionConcreter and Concrete RepairDig Trench by hand
ConstructionConcreter and Concrete RepairFinishing concrete with gasoline powered trowel (Helicopter)
ConstructionConcreter and Concrete RepairFinishing concrete with petrol powered trowel (Helicopter)
ConstructionConcreter and Concrete RepairInjection of Nitofill LV epoxy resin
ConstructionConcreter and Concrete RepairInstall damp proof membrane (Forticon plastic)
ConstructionConcreter and Concrete RepairMixing concrete with a portable mixer
ConstructionConcreter and Concrete RepairPlace steel reinforcing mesh
ConstructionConcreter and Concrete RepairPlacing Concrete
ConstructionConcreter and Concrete RepairPouring Concrete
ConstructionConcreter and Concrete RepairPouring Concrete Slab using a pump and a helicopter
ConstructionConcreter and Concrete RepairWater ingress repair using XYPEX
ConstructionConcreter and Concrete RepairWorking with silica and silica containing products
ConstructionDemolitionCut masonry wall with a Quick Cut Diamond blade saw
ConstructionDemolitionCut steel using a reciprocating saw
ConstructionDemolitionCutting Concrete with a Quick Cut Diamond blade saw
ConstructionDemolitionDecontamination of Plant
ConstructionDemolitionDemolition of cupboards and built in robes
ConstructionDemolitionDemolition of existing Drywall lined partition stud wall
ConstructionDemolitionDemolition of existing flush jointed plasterboard ceiling
ConstructionDemolitionDemolition of existing plasterboard lined partition stud wall
ConstructionDemolitionDemolition/ removal of bathroom fixtures and fittings
ConstructionDemolitionDemolition/ Removal of existing carpet and undelay
ConstructionDemolitionDemolition/ removal of existing ceiling tiles
ConstructionDemolitionDemolition/ removal of existing Compactus shelving unit
ConstructionDemolitionDemolition/ Removal of existing insulated panel cool room/ freezer by hand
ConstructionDemolitionDemolition/ removal of existing joinery
ConstructionDemolitionDemolition/ removal of existing suspended exposed grid ceiling
ConstructionDemolitionDemolition/ Removal of existing vinyl flooring
ConstructionDemolitionDemolition/ Removal of existing wall and floor tiles using an elec jack hammer
ConstructionDemolitionDemolition/ Removal of timber planking by hand
ConstructionDemolitionEnter asbestos removal area through the Decontamination Unit
ConstructionDemolitionExit asbestos removal area through the Decontamination Unit
ConstructionDemolitionJimmy/ prise fixtures away from wall
ConstructionDemolitionKnock out brick s using a hammer
ConstructionDemolitionLead based paint removal using Peel away Paint Removal System
ConstructionDemolitionLining of the Truck with Plastic Lining
ConstructionDemolitionLower materials to ground with ropes
ConstructionDemolitionPart demolition of existing brick wall to form new opening
ConstructionDemolitionRemediation of asbestos contaminated soil by hand and using general hand tools
ConstructionDemolitionRemoval of asbestos adhesive from hard surface
ConstructionDemolitionRemoval of Asbestos products
ConstructionDemolitionRemoval/ demolition of existing suspended exposed grid ceiling
ConstructionDemolitionRemove asbestos clothing
ConstructionDemolitionRemove existing suspended ceiling tiles
ConstructionDemolitionRemove nuts using a battery powered rattle gun
ConstructionDemolitionRemove screws using a battery powered drill
ConstructionDemolitionRemoving friable asbestos by hand
ConstructionDemolitionRemoving friable asbestos-contaminated soil by hand and using an excavator
ConstructionDemolitionRemoving non friable asbestos by hand
ConstructionDemolitionRemoving non-friable asbestos-contaminated soil by hand and using an excavator
ConstructionDemolitionSafety check and operation of Excavator for demolition works
ConstructionDemolitionSafety Inspection and use of Hydraulic Rock Breaker
ConstructionDemolitionSafety Inspection and use of Hydraulic Shear attachment
ConstructionDemolitionSelection and Use of PPE
ConstructionDemolitionSpray PVA Glue with an electric airless sprayer
ConstructionDemolitionUsing an electric Jack Hammer/ Electric Breaker/ Demolition Hammer
ConstructionElectricalConnect new cables into electrical plant/ equipment
ConstructionElectricalConnect new cables into existing switchboard
ConstructionElectricalDig Trench by hand
ConstructionElectricalDisconnect electrical from existing plant
ConstructionElectricalFill out and issue Electrical Certificate of Compliance
ConstructionElectricalFit power outlet to drywall
ConstructionElectricalFit power point to plasterboard wall
ConstructionElectricalFit switch to drywall
ConstructionElectricalFit switch to plasterboard wall
ConstructionElectricalInstall Inverter
ConstructionElectricalInstall isolator
ConstructionElectricalInstall Mounting brackets and rails to roof
ConstructionElectricalInstall solar panels onto the mounting frame
ConstructionElectricalInstallation of cable tray
ConstructionElectricalInstallation of Cable Tray Covers
ConstructionElectricalInstallation of catenary cable
ConstructionElectricalInstallation of Solar System to Domestic Dwelling
ConstructionElectricalIsolate power to existing system
ConstructionElectricalReplace existing light fittings
ConstructionElectricalRewire in conduits between light fittings
ConstructionElectricalRun Cables and secure to catenary cable
ConstructionElectricalRun Cables through existing ceiling space
ConstructionElectricalSecure conduits to structure with saddles
ConstructionElectricalTest the electrical installation
ConstructionElectricalTracing and identifying existing live lighting circuits - for fault purposes
ConstructionElectricalWorking in ceiling space
ConstructionFencingCut fence sheets with electric shears
ConstructionFencingDelivery and installation of temporary fencing
ConstructionFencingInstall chainmesh fencing
ConstructionFencingInstall posts
ConstructionFencingInstall star pickets using a hammer and Star Post Dropper
ConstructionFencingInstallation of Panel fencing
ConstructionFencingInstallation of post and rail metal clad fencing
ConstructionFencingInstallation of temporary fencing
ConstructionFencingMix concrete in a wheel barrow
ConstructionFencingRemoval of temporary fencing
ConstructionFencingScrew fence sheets to rail using a battery powered drill
ConstructionFire ProtectionConnect new cables into existing fire panel
ConstructionFire ProtectionFit speakers and detectors to drywall ceiling
ConstructionFire ProtectionFit speakers and detectors to plasterboard ceiling
ConstructionFire ProtectionInstall suspended fire pipework to underside of concrete slab
ConstructionFire ProtectionInstall suspended fire pipework to underside of roof purlins
ConstructionFire ProtectionRun Pipe work and cables through existing ceiling space
ConstructionFire ProtectionThread pipe using a Portable Power Pipe Threader
ConstructionFire ProtectionWorking in a confined space
ConstructionFloor Finisher and CovererInspection and use of Diamond Floor Grinder
ConstructionFloor Finisher and CovererInstall Carpet and underlay to a concrete floor
ConstructionFloor Finisher and CovererInstall Carpet and underlay to a timber floor
ConstructionFloor Finisher and CovererInstall vinyl skirting
ConstructionFloor Finisher and CovererInstall vinyl floors
ConstructionFormworkerInstall bearers and joists to formwork support frames
ConstructionFormworkerInstall 'Bondek' or Similar formwork to structure Using an Explosive Power Tool
ConstructionFormworkerInstall plywood formwork to support framing
ConstructionFormworkerInstallation of formwork support frames
ConstructionFormworkerInstallation of simple formwork
ConstructionFormworkerStripping formply
ConstructionFormworkerUsing an Explosive Power Tool
ConstructionGeneral BuildingAnother us
ConstructionGeneral BuildingBrick and Blocklaying
ConstructionGeneral BuildingClean up site by hand using a wheel barrow to transfer debris to bin
ConstructionGeneral BuildingConcrete filling of blockwork by bucket
ConstructionGeneral BuildingConstruction Site Establishment and Project Risk Assessment
ConstructionGeneral BuildingCut wood using a battery powered reciprocating saw
ConstructionGeneral BuildingCut wood using a reciprocating saw
ConstructionGeneral BuildingInstall Acro prop
ConstructionGeneral BuildingInstall Carpet and underlay to a wood floor
ConstructionGeneral BuildingInstall Pull down attic ladder into drywall ceiling and wood framing
ConstructionGeneral BuildingProject Risk Assessment
ConstructionGeneral BuildingRefurbishment of residence/ unit
ConstructionGeneral BuildingRemove existing silicone
ConstructionGlazierCarrying Window frames from storage area to work area
ConstructionGlazierCut aluminium sections using an electric mitre saw
ConstructionGlazierInstall Aluminium deflection head and sub sill
ConstructionGlazierInstall glass into frame
ConstructionGlazierInstall window frames into deflection head and sub sill
ConstructionGlazierInstallation of Glazed aluminium partitions
ConstructionGlazierUnload glass from vehicle onto trolley
ConstructionHeight SafetyInspect and certify the anchor point installation
ConstructionHeight SafetyInspect and certify the static line installation
ConstructionHeight SafetyInstall anchor points into existing concrete slab
ConstructionHeight SafetyInstall Horizontal Life line fixed to masonry wall
ConstructionHeight SafetyInstall Horizontal Life line fixed to overhead concrete
ConstructionHeight SafetyInstall Horizontal Life line fixed to overhead structural steel
ConstructionHeight SafetyInstall Horizontal Life line surface mounted to metal roof sheeting
ConstructionHeight SafetyInstall modular access ladder to structural wall girts behind wall cladding
ConstructionHeight SafetyInstall modular access ladders to existing masonry wall
ConstructionHeight SafetyInstall Pull down attic ladder into drywall ceiling and steel framing
ConstructionHeight SafetyInstall Pull down attic ladder into plasterboard ceiling and steel framing
ConstructionHeight SafetyInstall Pull down attic ladder into plasterboard ceiling and timber framing
ConstructionHeight SafetyInstall Pull down attic ladder into suspended exposed grid ceiling
ConstructionHeight SafetyInstall rafter mounted anchor points to a tiled roof
ConstructionHeight SafetyInstall Rafter Mounted anchor points to tiled roof without edge protection
ConstructionHeight SafetyInstall roof access hatch into a metal roof
ConstructionHeight SafetyInstall Safety Anchors to an existing roof (wood from above and below)
ConstructionHeight SafetyInstall Surface Mounted anchor points to metal roof
ConstructionHeight SafetyInstall Surface Mounted anchor points to metal roof without edge protection
ConstructionHeight SafetyMeasure and mark out for system installation
ConstructionHeight SafetyRun and Connect Static Line Cable
ConstructionHeight SafetyTwin rope rescue via pick off and take to ground
ConstructionHeight SafetyUsing a Harness and Static Line
ConstructionHome ImprovementsBuild Steel Wall Frame and Bolt Wall Girths to Columns
ConstructionHome ImprovementsBuild Wall Frame and Tek Screw Wall Girths to Columns
ConstructionHome ImprovementsDrill Wall Girths and Purlins with an electric drill
ConstructionHome ImprovementsInstallation of Garage (Domestic Shed) complete job
ConstructionHome ImprovementsInstallation of Roller Door (domestic)
ConstructionHome ImprovementsInstallation of Steel Portal Roof Trusses by hand
ConstructionHome ImprovementsInstallation of Steel Roof Purlins by hand
ConstructionHome ImprovementsInstallation of Steel Wall Girths by hand
ConstructionHome ImprovementsInstallation of Temporary Height Safety System - Starting from Platform Ladder
ConstructionHome ImprovementsInstallation of wall sheeting from Ground
ConstructionHome ImprovementsMixing concrete with a portable mixer
ConstructionHome ImprovementsPush Wheel Barrow on site
ConstructionHome ImprovementsScrew fixing wall sheeting from platform ladder
ConstructionHome ImprovementsSrew fixing wall sheeting from platform ladder
ConstructionHome ImprovementsStand up clad walls
ConstructionHome ImprovementsWash out mixer
ConstructionJoineryAdjust hinges to joinery doors
ConstructionJoineryCut timber to size using a table saw
ConstructionJoineryCut wood to size using a table saw
ConstructionJoineryGrinding/ Polishing bench tops with a handheld grinder
ConstructionJoineryInstall wall mounted cupboards to stud wall
ConstructionJoineryInstall aluminium skirting
ConstructionJoineryInstall cupboards
ConstructionJoineryInstall Kick plate
ConstructionJoineryInstall pre laminated bench top
ConstructionJoineryInstall prefabricated steel counter frames
ConstructionJoineryInstall timber wall linings
ConstructionJoineryInstall timber wall linings using a battery powered drill
ConstructionJoineryInstallation of new kitchen joinery
ConstructionJoineryLay Hebel panels into frames and grout into position
ConstructionLandscapingAcceptance of delivery of concrete
ConstructionLandscapingInstall irrigation poly pipe and fittings
ConstructionLandscapingInstallation of subsurface irrigation system
ConstructionLandscapingInstallation of Synthetic Turf
ConstructionLandscapingLay brick pavers
ConstructionLandscapingPlanting of trees and shrubs by hand
ConstructionLandscapingPreparation and installation of synthetic turf
ConstructionLandscapingPrepare and lay brick pavers
ConstructionLandscapingScreed sand
ConstructionLandscapingSweeping sand over pavers and into cracks
ConstructionLandscapingTrowel cement to edges of pavers
ConstructionLouvresInstall louvre blades into mullion/ blade carriers
ConstructionLouvresInstall louvre doors into existing masonry opening
ConstructionLouvresInstall louvre mullions to existing steel girths using a battery powered drill
ConstructionLouvresInstallation of Horizontal Sunshade Panels into position by hand
ConstructionLouvresInstallation of louvre members - Using a boom lift
ConstructionLouvresLoading Louvre members onto roof using a crane
ConstructionLouvresManually lift panel into position
ConstructionMaritimeDrive piles with a crane lifted vibro hammer vibrating hammer pile driver
ConstructionMaritimeInspection and use of tender vessel
ConstructionMaritimeInspection and use of the vessel mounted crane
ConstructionMaritimeInspection and use of the vessel mounted forklift
ConstructionMaritimeLowering and raising spuds
ConstructionMaritimeTow and Position Barge
ConstructionMaritimeUnload barge from truck to water with a mobile crane
ConstructionMaritimeWorking in the water
ConstructionMaritimeWorking on a Barge
ConstructionMaritimeWorking on a work boat/ vessel
ConstructionMechanical ServicesConnect temporary power supply and test operation of hoist
ConstructionMechanical ServicesFinal connections and commissioning of lift
ConstructionMechanical ServicesInstall hoist motor
ConstructionMechanical ServicesInstallation of four post vehicle hoist
ConstructionMechanical ServicesInstallation of four post vehicle hoist (complete job including pick up and del)
ConstructionMechanical ServicesInstallation of scissor lift vehicle hoist (complete job inc pick up and del)
ConstructionMechanical ServicesInstallation of two post vehicle hoist
ConstructionMechanical ServicesInstallation of two post vehicle hoist (complete job including pick up and del)
ConstructionMechanical ServicesLift Car Installation and Fit Out
ConstructionMechanical ServicesLift Installation
ConstructionMechanical ServicesLift Shaft Fitout
ConstructionMechanical ServicesLift shaft rail installation into Masonry shaft
ConstructionMechanical ServicesPlumb Lift Shaft
ConstructionMechanical ServicesRemoval and Replacement of gantry crane radio control unit
ConstructionMechanical ServicesRoutine Inspection of 2 post vehicle hoist
ConstructionMechanical ServicesRoutine Inspection of 4 post vehicle hoist
ConstructionMechanical ServicesRoutine Inspection of scissor lift vehicle hoist
ConstructionPainting and DecoratingFill holes and imperfections
ConstructionPainting and DecoratingPainting of ceilings
ConstructionPainting and DecoratingPainting of walls
ConstructionPainting and DecoratingPainting of Walls and Ceilings
ConstructionPainting and DecoratingPainting with an electric airless sprayer
ConstructionPlumbingBack Fill trench by hand with original spoil
ConstructionPlumbingClean trenches and setting grade by hand
ConstructionPlumbingClearing a blocked drain using an Electric Eel
ConstructionPlumbingCommercial drainage and hot & cold water reticulation (complete plumbing job 1 )
ConstructionPlumbingConnect pipes together using a flexible connector
ConstructionPlumbingConnect sewer drain to government connection
ConstructionPlumbingConnect water inlet and outlet
ConstructionPlumbingCut down UPVC risers using a battery powered angle grinder
ConstructionPlumbingCut down UPVC risers using an angle grinder
ConstructionPlumbingCut into existing earthenware branch using and angle grinder
ConstructionPlumbingDig Trench by hand
ConstructionPlumbingDrain water system
ConstructionPlumbingDrill hole into existing concrete slab with an electric rotary hammer drill
ConstructionPlumbingDrill hole into existing contrete slab with an electric rotary hammer drill
ConstructionPlumbingElectro-Fusion Welding of MDPE of HDPE pipe
ConstructionPlumbingFit cover plates and mini cocks to outlets
ConstructionPlumbingFit Pipe insulation over pipes
ConstructionPlumbingFit Tapware/ mixers
ConstructionPlumbingFit 'T's and connectors to plastic pipes
ConstructionPlumbingGlue jointing closed cell elastomeric pipe insulation
ConstructionPlumbingInstall backflow prevention valve
ConstructionPlumbingInstall cistern and flush pipe
ConstructionPlumbingInstall damp proof membrane to trimmers/noggings prior to brass fittings
ConstructionPlumbingInstall dishwasher
ConstructionPlumbingInstall electric storage hot water service (HWS)
ConstructionPlumbingInstall gas instantaneous hot water service (HWS)
ConstructionPlumbingInstall hand basins
ConstructionPlumbingInstall hot and cold water fist fix plumbing (Steel framed)
ConstructionPlumbingInstall hot and cold water fist fix plumbing (Timber framed)
ConstructionPlumbingInstall hot and cold water fist fix plumbing (Wood framed)
ConstructionPlumbingInstall sinks/ troughs
ConstructionPlumbingInstall Stopcock valve
ConstructionPlumbingInstall suspended pipework to underside of concrete slab
ConstructionPlumbingInstall suspended pipework to underside of roof purlins
ConstructionPlumbingInstall temporary caps to fixtures
ConstructionPlumbingInstall toilet (WC Pan)
ConstructionPlumbingInstall trimmers/ nogging to steel framing
ConstructionPlumbingInstall trimmers/ noggings to timber framing
ConstructionPlumbingInstall W45 Brass male lugged elbows, breaching pieces and mixers to steel frame
ConstructionPlumbingInstall Zip Autoboil
ConstructionPlumbingInstallation of baths
ConstructionPlumbingInstallation of Gas storage hot water system (HWS)
ConstructionPlumbingInstallation of mechanical masonry anchors
ConstructionPlumbingInstallation of underfloor plumbing and drains
ConstructionPlumbingInstallation of UPVC pipe
ConstructionPlumbingIsolate water to premises
ConstructionPlumbingLift member using a forklift and lifting jib
ConstructionPlumbingLoad skid steer excavator onto truck/ trailer using aluminium ramps
ConstructionPlumbingMark out studwork for trimmer and fixture locations
ConstructionPlumbingPipe freezing using liquid nitrogen
ConstructionPlumbingPlug the unit into the power supply outlet
ConstructionPlumbingPlumbing final fit
ConstructionPlumbingPressure testing of hot and cold pipework
ConstructionPlumbingRun copper plumbing pipework and fit off
ConstructionPlumbingRun plastic water/ gas pipework and fit off
ConstructionPlumbingSecure W45 Brass male lugged elbows, breaching pieces and mixers
ConstructionPlumbingService and replacement of TMV in masonry wall
ConstructionPlumbingSleeve and apply silicone around pipework passing trough holes
ConstructionPlumbingTest the property
ConstructionPlumbingUnpack fixtures/ materials
ConstructionPlumbingWelding copper tube
ConstructionPlumbingWelding/ silver soldering copper pipes together
ConstructionPlumbingWorking in open trench
ConstructionPrecastJoint Caulking
ConstructionRiggingIndustrial rope access
ConstructionRiggingInstallation of Columns - Using a Crane
ConstructionRiggingInstallation of steel cable
ConstructionRoof TilingCarrying mortar in a bucket to work area
ConstructionRoof TilingMix mortar in a wheel barrow
ConstructionRoof TilingPlace tile onto mortar bed and trowel off
ConstructionRoof TilingRe-bed tiled roof ridge capping
ConstructionRoof TilingReplace broken roof tiles
ConstructionRoof TilingRepointing of ridge tiles
ConstructionRoof TilingSet up mortar bed formwork frame
ConstructionRoofingApply silicone to joint
ConstructionRoofingCleanout gutter by hand
ConstructionRoofingCreating Roof Penetrations
ConstructionRoofingCut Insulated Panel with a circular saw
ConstructionRoofingCut metal roof sheets with battery powered shears
ConstructionRoofingCut metal roof sheets with electric shears
ConstructionRoofingCut metal wall sheets with battery powered shears
ConstructionRoofingCutting Roof Sheets with snips
ConstructionRoofingFit angles and trims using a battery powered drill and pop rivets
ConstructionRoofingForm and Flash Roof Penetrations
ConstructionRoofingInstall Box Gutter with saddles straps and gutter board
ConstructionRoofingInstall Pierced Fixed Roof Sheets using a battery powered drill
ConstructionRoofingInstall Safety Anchors to an existing roof (Timber from above and below)
ConstructionRoofingInstall Stone Sheeting
ConstructionRoofingInstall Temporary Edge Protection
ConstructionRoofingInstall Temporary Edge Protection from an EWP
ConstructionRoofingInstall top hats to steel structure
ConstructionRoofingInstall variable pitch roof ventilators to metal roof
ConstructionRoofingInstallation of Air-Cell Insulation
ConstructionRoofingInstallation of Anchorpoints to existing roof
ConstructionRoofingInstallation of concealed clip roof decking
ConstructionRoofingInstallation of Downpipes
ConstructionRoofingInstallation of Eaves Gutters
ConstructionRoofingInstallation of fascia cladding - From a scaffold
ConstructionRoofingInstallation of fascia cladding - From a scissor lift
ConstructionRoofingInstallation of Flashings using a battery powered drill
ConstructionRoofingInstallation of insulation to roof
ConstructionRoofingInstallation of insulation to walls
ConstructionRoofingInstallation of metal battens
ConstructionRoofingInstallation of metal Fascia
ConstructionRoofingInstallation of Metal Fascias from ladder
ConstructionRoofingInstallation of Rain Water Head
ConstructionRoofingInstallation of Roof Sheets
ConstructionRoofingInstallation of roof vents
ConstructionRoofingInstallation of Roof walkway
ConstructionRoofingInstallation of Safety Mesh from Roof
ConstructionRoofingInstallation of Safety Mesh to roof area - From EWP
ConstructionRoofingInstallation of Safety Mesh to roof area - From Scaffold
ConstructionRoofingInstallation of Safety Mesh to Roof From Roof and Scissor Lift on one side
ConstructionRoofingInstallation of Soffit Sheeting - From EWP
ConstructionRoofingInstallation of Soffit Sheeting - From Scaffold
ConstructionRoofingInstallation of Static line system
ConstructionRoofingInstallation of Support Mesh to walls - Using Scissor Lift
ConstructionRoofingInstallation of Temporary Height Safety System - starting from Scissor
ConstructionRoofingInstallation of Temporary Height Safety System - to Existing roof from Scaffold
ConstructionRoofingInstallation of Temporary Height Safety System to new roof
ConstructionRoofingInstallation of Temporary Static Line
ConstructionRoofingInstallation of top hats to masonry wall
ConstructionRoofingInstallation of UPVC Pipe
ConstructionRoofingInstallation of vent ridge
ConstructionRoofingInstallation of wall sheeting from Ground and Boom Lift
ConstructionRoofingInstallation of wall sheeting from Ground and Scaffold
ConstructionRoofingInstallation of wall sheeting from Ground and Scissor Lift
ConstructionRoofingInstalling External/ Internal Downpipes
ConstructionRoofingInstalling Rain Water Heads
ConstructionRoofingInstalling Roof Sheets
ConstructionRoofingLoad materials into boom lift
ConstructionRoofingLoading Roof Sheets or materials with Crane
ConstructionRoofingMeasure Roofing using temporary Anchor Points
ConstructionRoofingMoving materials over the roof
ConstructionRoofingNew-Roofing (Domestic)
ConstructionRoofingPassing up Roof Sheets and Accessories from the ground
ConstructionRoofingRe-fall box gutter
ConstructionRoofingRemoval of Asbestos products
ConstructionRoofingRemoval of Ceiling Sheets
ConstructionRoofingRemoval of Existing (Flat Roof)- Roof Sheeting
ConstructionRoofingRemoval of existing Blanket insulation
ConstructionRoofingRemoval of existing Box Gutter
ConstructionRoofingRemoval of existing ceiling flashings
ConstructionRoofingRemoval of existing Ceiling Insulation from open roof
ConstructionRoofingRemoval of existing roof flashings
ConstructionRoofingRemoval of existing Roof Sheeting and Accessories
ConstructionRoofingRemoval of existing Roof Sheeting and Aceesories
ConstructionRoofingRemoval of existing roof tiles
ConstructionRoofingRemoval of Existing RWH
ConstructionRoofingRemoval of materials from roof area by hand - Using EWP
ConstructionRoofingRemoval of wall sheeting
ConstructionRoofingRemove all materials, equipment and waste from site
ConstructionRoofingRemove and reinstate dektites
ConstructionRoofingRemove and Reinstate Roof Screws
ConstructionRoofingRemove and reinstate Skylight sheeting
ConstructionRoofingRe-Roofing
ConstructionRoofingRoof Plumbing Servicing and Maintenance
ConstructionRoofingVisual Inspection of Structure
ConstructionScaffolderErecting, Altering and Dismantling Prefabricated Steel Modular Scaffolding
ConstructionScaffolderErection and use of a steel tube scaffold
ConstructionScaffolderErection and use of aluminium tube scaffold
ConstructionScaffolderErection and Use of Mobile Scaffold (Extended Version)
ConstructionScaffolderInstallation of cantilevered K-Stage Modular Steel Scaffold
ConstructionScaffolderInstallation of K-Stage Modular Steel Scaffold
ConstructionSeatingAttach platform to wall bracket
ConstructionSeatingInstall Drive Motor to Platform Frame
ConstructionSeatingInstall end safety rails to Retractable platforms
ConstructionSeatingInstallation of Chair Modules
ConstructionSeatingInstallation of fixed stadium seating (complete Job)
ConstructionSeatingInstallation of fixing brackets to concrete
ConstructionSeatingInstallation of Plywood Decks
ConstructionSeatingInstallation of retractable stadium seating
ConstructionShelving and RackingAssemble Frames and bolt together
ConstructionShelving and RackingDismantling of Pallet Racking
ConstructionShelving and RackingInstall handrails to platform
ConstructionShelving and RackingInstall horizontal racking beams from a scissor lift
ConstructionShelving and RackingInstall horizontal racking beams from ground
ConstructionShelving and RackingInstall staircase assembly using a forklift and lifting jib
ConstructionShelving and RackingInstallation of cantilever racking
ConstructionShelving and RackingInstallation of Longspan shelving
ConstructionShelving and RackingInstallation of Pallet Racking
ConstructionShelving and RackingInstallation of Pallet Racking (complete job)
ConstructionShelving and RackingInstallation of Static Shelving
ConstructionShelving and RackingInstallation of Stock Picking Racking
ConstructionShelving and RackingLevel racking and bolt to slab
ConstructionShelving and RackingManually lower installed rack frames to the ground
ConstructionShelving and RackingPigeon Hole Rack Assembly (Complete Job)
ConstructionShelving and RackingRemove horizontal racking beams from a scissor lift
ConstructionShelving and RackingRemove horizontal racking beams from ground
ConstructionShelving and RackingStand up pre-assembled rack frames
ConstructionShelving and RackingStand up pre-assembled rack frames using a Forklift and Rack Frame Lifting Jib
ConstructionSolid PlasteringChip out loose concrete/ cement or render with scabbling hammer
ConstructionSolid PlasteringClean masonry surface using an electric grinder and cup disc
ConstructionSolid PlasteringMix acrylic render in a bucket using an electric drill
ConstructionSolid PlasteringMixing Adhesive/ Mortar/ Render/ Cement based products with an electric drill
ConstructionSolid PlasteringRendering/ solid plastering
ConstructionSolid PlasteringTrowel acrylic render onto surface
ConstructionSteel FixerCut steel reinforcing using bolt cutters
ConstructionSteel FixerPlace steel reinforcing in footing
ConstructionStructural SteelClaim work area on rail line
ConstructionStructural SteelCleaning steel using a battery powered grinder with a wire brush attachment
ConstructionStructural SteelCleaning steel using an electric grinder with a wire brush attachment
ConstructionStructural SteelConcrete filling of Columns by bucket
ConstructionStructural SteelCoring concrete
ConstructionStructural SteelCrane Set Up
ConstructionStructural SteelCutting Steel with an Oxy- Torch
ConstructionStructural SteelDrill hole using a magnetic drill
ConstructionStructural SteelGrout Columns
ConstructionStructural SteelInject Epoxy into holes
ConstructionStructural SteelInstall connecting bolts and tension nuts using a battery powered rattle gun
ConstructionStructural SteelInstallation of Ball Tube Handrail
ConstructionStructural SteelInstallation of Chem Anchors onto existing masonry surface
ConstructionStructural SteelInstallation of Chem Anchors onto existing masonry wall
ConstructionStructural SteelInstallation of Columns by hand
ConstructionStructural SteelInstallation of Dynabolts
ConstructionStructural SteelInstallation of Floor Grating
ConstructionStructural SteelInstallation of Girts - Using an EWP
ConstructionStructural SteelInstallation of Hold Down bolts into existing Concrete
ConstructionStructural SteelInstallation of Roof Purlins - Using a Crane
ConstructionStructural SteelInstallation of Steel Members - Using an EWP
ConstructionStructural SteelInstallation of Steel Bracing Members - Using an EWP
ConstructionStructural SteelInstallation of Steel Members - Using a Crane
ConstructionStructural SteelInstallation of Steel members by hand
ConstructionStructural SteelInstallation of Wall plate by Hand
ConstructionStructural SteelInstalling Bolts through existing concrete slab
ConstructionStructural SteelLand Column into position with Crane
ConstructionStructural SteelLand Member into position using crane
ConstructionStructural SteelLift members into position by hand
ConstructionStructural SteelLifting materials using duct lifters
ConstructionStructural SteelLifting members using a chain block
ConstructionStructural SteelRemoval of Steel Members by hand using EWP
ConstructionStructural SteelTension nuts using a battery powered rattle gun
ConstructionStructural SteelWelding cleats to existing structure with a portable electric welder
ConstructionWall and Ceiling LiningsCut Drywall using a drywall hand saw
ConstructionWall and Ceiling LiningsCut fibre cement sheet using an electric circular fibre cement saw
ConstructionWall and Ceiling LiningsCut hole into existing Drywall surface using a key hole Drywall saw
ConstructionWall and Ceiling LiningsCut plasterboard using a key hole plasterboard saw
ConstructionWall and Ceiling LiningsCut plasterboard using a plasterboard hand saw
ConstructionWall and Ceiling LiningsDrywall finishing
ConstructionWall and Ceiling LiningsFlushing to screws and joints in linings
ConstructionWall and Ceiling LiningsInstall fibre cement linings
ConstructionWall and Ceiling LiningsInstall fibre cement linings using a battery powered drill
ConstructionWall and Ceiling LiningsInstall suspended ceiling grid
ConstructionWall and Ceiling LiningsInstallation of drywall linings
ConstructionWall and Ceiling LiningsInstallation of insulation Batts to wall and ceiling framing
ConstructionWall and Ceiling LiningsInstallation of plasterboard linings
ConstructionWall and Ceiling LiningsInstalling Cement Sheet Cladding
ConstructionWall and Ceiling LiningsManufacture Steel Stud Wall Frames
ConstructionWall and Ceiling LiningsManufacture/ build Steel Stud Wall Frames on site
ConstructionWall and Ceiling LiningsSanding of finished drywall by hand
ConstructionWall and Ceiling LiningsSanding of flushed joints by hand
ConstructionWall and Ceiling LiningsSanding of flushed joints using an electric drywall / plasterboard sander
ConstructionWall and Floor TilingCut tiles using an angle grinder
ConstructionWall and Floor TilingGrout tiles
ConstructionWall and Floor TilingLaying floor tiles
ConstructionWall and Floor TilingLaying wall tiles
ConstructionWall and Floor TilingMix adhesive in a bucket using an electric drill
ConstructionWall and Floor TilingMix grout in a bucket using an electric drill
ConstructionWall and Floor TilingMixing cement with a portable electric mixer
ConstructionWall and Floor TilingPlacing a cement screed
ConstructionWall and Floor TilingRemove existing grout between tiles
ConstructionWall and Floor TilingWall and floor tiling to domestic residence
ConstructionWall and Floor TilingWash out bucket
ConstructionWindows and DoorsCork joint with Polyurethane sealant
ConstructionWindows and DoorsInstall aluminium door frame into existing masonry opening
ConstructionWindows and DoorsInstall preassembled window frame into existing opening and screw fix
ConstructionWindows and DoorsInstallation of Aluminium Doors and Door Hardware
ConstructionWindows and DoorsInstallation of Wooden Doors and Door Hardware using battery powered tools
Healthcare and MedicalAged CareDealing with people with dementia or aggression
Healthcare and MedicalHomecareAssist client in and out of a chair
Healthcare and MedicalPhysiotherapyIn home Physiotherapy
Hire and RentalHire and RentalDelivery, cleaning and removal of portable toilets
HorticultureArboricultureClearing and Grubbing Highway (complete job)
HorticultureArboricultureClimb Tree
HorticultureArboricultureClimb Tree to lop branches
HorticultureArboricultureCut tree using a gasoline powered chainsaw
HorticultureArboricultureCut tree using a petrol powered chainsaw
HorticultureArboricultureCut tree using gasoline powered pole saw
HorticultureArboricultureCut tree using petrol powered pole saw
HorticultureArboricultureFelling of tree from the ground - not requiring a climber
HorticultureArboricultureFelling of tree using Climbing Technique
HorticultureArboricultureFelling of tree using Climbing Technique and using wood chipper
HorticultureArboricultureInspection and use of gasoline powered chainsaw
HorticultureArboricultureInspection and use of petrol powered chainsaw
HorticultureArboricultureLoad stump grinding machine onto trailer using aluminium ramps
HorticultureArboricultureMulching of trees and branches using a Brush/ Wood Chipper
HorticultureArboricultureMulching of trees and branches using a Brush/ Wood Chipper (extended version)
HorticultureArboriculturePut on Harness and set up ropes
HorticultureArboricultureSafety check and operation of Excavator for clearing and grubbing
HorticultureArboricultureSafety Inspection and use of Hydraulic Harvester Head attachment
HorticultureArboricultureStump Grinding
HorticultureArboricultureUnload stump grinding machine from trailer using aluminium ramps
HorticultureLandscape HorticultureClear the area and move existing pot plants
HorticultureLandscape HorticulturePruning with Hand Pruners/ Shears (Secateurs)
HorticultureLandscape HorticultureSafety Inspection and use of Horizontal Grinder
HorticultureParks and GardensCarrying green waste by hand
HorticultureParks and GardensControl of pedestrians through work area
HorticultureParks and GardensDiscovery of syringes or needles/ sharps
HorticultureParks and GardensHerbicide Spraying by hand
HorticultureParks and GardensInspection and use of gasoline powered Brush cutter/ Grass Trimmer
HorticultureParks and GardensInspection and use of gasoline powered walk behind lawn mower
HorticultureParks and GardensInspection and use of petrol powered Brushcutter/ Grass Trimmer
HorticultureParks and GardensInspection and use of petrol powered walk behind lawn mower
HorticultureParks and GardensInspection and use of skid steer mounted slasher
HorticultureParks and GardensInspection and use of tractor mounted slasher
HorticultureParks and GardensLoad Tractor/ ride on lawnmower onto trailer using aluminium ramps
HorticultureParks and GardensLoading ad dragging bags of waste to bin or vehicle
HorticultureParks and GardensMulching of garden waste using a gasoline powered mulcher
HorticultureParks and GardensMulching of garden waste using a petrol-powered mulcher
HorticultureParks and GardensPrune branches using hand operated extendable pore pruner or pole saw
HorticultureParks and GardensSpreading fertilizer and manure
HorticultureParks and GardensSpreading mulch by bucketing and spreading with shovel and rake
HorticultureParks and GardensSpreading soil with Shovel and Rake
HorticultureParks and GardensUnload tractor/ ride on lawnmower from trailer using aluminium ramps
HorticultureParks and GardensWorking beneath large fig trees
HorticultureParks and GardensWorking on sloping/ steep ground
HorticultureParks and GardensWorking outside in the sun
HorticultureParks and GardensWorking with spikey plants
Pest ControlAnt, Insect and spider controlPesticide spraying by hand
Pest ControlFeral animal controlAerial Shooting and Baiting from helicopters
Pest ControlFeral animal controlAutomated corral trapping
Pest ControlFeral animal controlFoot hold trapping
Pest ControlFeral animal controlGround Baiting using 1080 poison
Pest ControlFeral animal controlSafety inspection and use of firearms for hunting
Primary IndustriesLivestock GrazingAerial Mustering
Primary IndustriesLivestock GrazingInspect and Drive Off Road Vehicle/ 4WD
Primary IndustriesLivestock GrazingInspection and use of Tractor
Primary IndustriesLivestock GrazingMustering using Off Road and 4WD vehicles
SecuritySecurity PatrolsCheck and Lock down pool area
SecuritySecurity PatrolsCheck Carpark
SecuritySecurity PatrolsCheck exterior of premises
SecuritySecurity PatrolsCheck Gymnasium
SecuritySecurity PatrolsInternal Patrols of Student Accommodation
SecuritySecurity PatrolsPatrol of Student Accommodation Facility
Traffic ManagementTraffic controlEstablish a Safe Work Zone-Working on or adjacent road (Traffic Control)
Traffic ManagementTraffic controlTraffic control in night conditions
Traffic ManagementTraffic controlTraffic control station set up and operation of traffic control (Stop/ slow bat)
TransportTruckDeliver materials to site and unload manually
TransportTruckDelivery and unloading of mobile plant
TransportTruckDriving long distances
TransportTruckInspect and drive truck
TransportTruckLoading materials onto truck by hand
Waste and resource recoveryConstruction and DemolitionChangeover of skip bin
Waste and resource recoveryConstruction and DemolitionDelivery of skip bin
Waste and resource recoveryConstruction and DemolitionPick up filled skip bin
Waste and resource recoveryLiquid wastePump out domestic septic tank using a vacuum truck
Waste and resource recoveryLiquid wastePump out grease trap tank using a vacuum truck
Waste and resource recoveryLiquid wastePump out waste milk using a vacuum truck
Waste and resource recoveryLiquid wasteRemoval of liquid waste milk
Waste and resource recoverySweepersInspection and use of industrial automatic ride on sweeper/scrubber
Waste and resource recoverySweepersInspection and use of Truck Mounted Street Sweeper