WHS Form 67 Mobile Plant Daily checklist
- To be carried out at the start of each day. Checklist log to be retained with vehicle.
- Any defects are to be listed in ‘Defects Log’ and supervisor to be notified of defect. Supervisor to arrange repairs of defects.
- Place ‘Out of Service’ tag on equipment if required. Supervisor to ensure that repairs are signed off by repairer in ‘Defects Log’ when completed.
This form is also included in the JSEAsy Software Premium version.