Fencing Job Hazard Analysis (JHA)
A Safe Work Method Statement (JHA) needs to document step by step how you are going to do a particular job. Not all jobs are the same!
Are you going to install a Colorbond post and rail fence or a Chainmesh fence around a tennis court? Are you going to dig holes by hand or using a power-driven auger?
People often ask, “Can I have a Safe Work Method Statement for fencing?” “A document that covers everything?” The answer is not really.
You could create a document that covers most areas of fencing work, but it would be hundreds of pages long and would contain more items that did not apply to your project, than items that did.
The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential hazards and the hazard control measures are very different as well.
Fencing work involves various risks and hazards!
Fencing work involves various risks and hazards that workers should be aware of to ensure their safety. The specific risks and hazards can vary depending on the type of fencing work being performed and the work environment. Here are some common risks and hazards associated with fencing work:
Manual Handling and Lifting
Risk: Strains and injuries can occur due to lifting heavy materials, tools, or equipment.
Hazard: Improper lifting techniques, overexertion, or inadequate training can lead to musculoskeletal injuries.
Working at Heights
Risk: Falls from elevated positions, such as when installing or repairing fences on walls or elevated surfaces.
Hazard: Lack of fall protection measures, unstable work platforms, or improper use of ladders and scaffolding.
Use of Hand Tools and Power Tools
Risk: Injuries from hand tools (e.g., cuts, abrasions) or power tools (e.g., electric shock, cuts, amputations).
Hazard: Lack of proper training, improper use of tools, inadequate maintenance, or malfunctioning equipment.
Exposure to Harmful Substances
Risk: Exposure to hazardous substances, such as paints, coatings, preservatives, or chemicals used in the fencing materials.
Hazard: Inhalation, skin contact, or ingestion of harmful substances without proper personal protective equipment (PPE) or safety precautions.
Electricity Hazards
Risk: Working near or with electrical components, such as wiring for electric fences.
Hazard: Electrical shocks, burns, or other injuries due to contact with live wires or faulty electrical systems.
Inadequate Personal Protective Equipment (PPE)
Risk: Insufficient use or absence of PPE, including gloves, eye protection, hearing protection, and safety footwear.
Hazard: Increased susceptibility to injuries from various sources, depending on the nature of the work.
Environmental Factors
Risk: Adverse weather conditions (e.g., extreme heat, cold, rain) can impact the safety of fencing work.
Hazard: Slippery surfaces, reduced visibility, or exposure to extreme temperatures without proper precautions.
Tool and Equipment Maintenance
Risk: Malfunctioning tools or equipment due to poor maintenance.
Hazard: Increased likelihood of accidents and injuries when using tools and equipment that are not in proper working condition.
Traffic Hazards
Risk: Fencing work near roadways or in public spaces may expose workers to traffic hazards.
Hazard: Vehicle collisions, pedestrian accidents, or other incidents due to inadequate traffic control measures.
It’s crucial for employers and workers involved in fencing work to conduct thorough risk assessments, provide proper training, enforce safety procedures, and ensure the use of appropriate personal protective equipment to mitigate these risks and hazards and contribute to a safer work environment.
Efficiency and Safety Unveiled
Creating Comprehensive Fencing JHA with JSEAsy Software.
A JHA provides a clear, step-by-step guide on how to perform a task safely. It ensures that everyone involved understands the necessary steps, reducing the likelihood of accidents due to confusion or misunderstanding.
Making JHA has never been easier, just pick your job steps and the JSEAsy safety management software does all the hard work for you.
JSEA/ JHA Example
Below is an example of templates you may insert into your site-specific JHA for Installation of post and rail metal clad fencing.
- Claim work area.
- Marking Out Ground
- Dig Hole by hand.
- Cut Steel posts and rails using an Angle Grinder
- Installation of fencing posts and rails
- Mix concrete in a wheelbarrow
- Push Wheelbarrow on site to the desired hole location
- Screw fence sheets to rail using a battery powered drill
- Cut fence sheets with electric shears.
- Cleaning up work area
- Monitoring and Review of JHA
Automating the process
When you insert a template, it automatically brings with it:
- The main process step
- The sub process steps associated in undertaking the task
- The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
- The Risk Rating for undertaking the task (You can also change this if you want to)
- The Hazard Control measure (you can also delete or add any of these with a simple click)
- The revised risk rating after applying the control (You can also change this if you want to)
- Any required PPE (you can also delete or add any of these with a simple click)
- Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
- Any preoperational inspections required (you can also delete or add any of these with a simple click)
- Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
Creating Site-Specific JHA Reports with JSEAsy Safety Management Software
Creating a site-specific JHA is easy using JSEAsy . Once created, you can print/ save a pdf of either a full or simplified JHA report.
Download an example of a full JHA report generated from the JSEAsy EHS Software.
Download an example of a simplified JHA report generated from the JSEAsy EHS Software.
The JSEAsy software comes preloaded with hundreds of templates (job steps) to build your site-specific JHA with.
Safe Operating Procedures (SOP) and Plant and Equipment Risk Assessments (PERA) are also included in all versions.
The JSEAsy Premium EHS Software is your total WHS management system.
The JSEAsy safety management software is available for download and install on a PC, or hosted in the cloud.
JSEAsy Environmental Health and Safety (EHS) Software
Process: Click the Links below to learn more about JSEAsy Safety Management Software and the process.
View an Infographic about How JSEAsy Software works.
See the different versions of the JSEAsy software.
When you buy or Rent JSEAsy you have access to all of the latest version JHA templates, for all trades and industries.
Download the JSEAsy latest version JHA template register.
This is a register sorted by industry type and industry specific of all of the JHA templates included in the latest version of the JSEAsy Safety Management Software.
Save time and Money!
Hundreds of templates included – 1 low price – Exceptional value!
When you buy or rent the JSEAsy software, not only to get all of the templates specifically for fencing but you also get all of the templates for all of the other trades as well.
Fencing contractors don’t just do put up fences. You will also benefit from many of the construction and trade templates.
A list of all the templates included in all versions of the JSEAsy EHS software is shown below.
- You can search by scrolling through the list of all templates.
- You can apply filters to the list by selecting an Industry Type
- You can further refine the list by selecting and industry type and an industry specific.
- You can do key word searches for templates. If you can’t find what you are looking for try:
- Shortening the search term. For example, searching for “deliv” would show deliver and deliveries, but if you searched for deliveries, it would exclude deliver.
- Look for a synonyms/ alternate word for what you are looking for. E.g. tube or pipe
Industry Type | Industry Specific | Work Description |
---|---|---|
Administration | Office | Photocopying |
All Industry Types | All Trades | Accept load to vehicle from forklift (3rd Party operator) and Loading by hand |
All Industry Types | All Trades | Acceptance of delivery to site for materials |
All Industry Types | All Trades | Acceptance of delivery to site for materials via Crane Truck |
All Industry Types | All Trades | Access roof via Boom Lift |
All Industry Types | All Trades | Access roof via fixed access ladder |
All Industry Types | All Trades | Access roof via Ladder |
All Industry Types | All Trades | Access Roof via scaffold stair access |
All Industry Types | All Trades | Access roof via Scissor Lift |
All Industry Types | All Trades | Access work area using a platform ladder |
All Industry Types | All Trades | Access work area using a step ladder |
All Industry Types | All Trades | Access work area using 'Hop-Up' trestle ladder/ work platform |
All Industry Types | All Trades | Access work area via a mobile scaffold |
All Industry Types | All Trades | Access work area via a scaffold/ working at heights from a scaffold |
All Industry Types | All Trades | Apply touch up paint |
All Industry Types | All Trades | Carrying materials from storage area to work area |
All Industry Types | All Trades | Charging of Li-Ion batteries for use with cordless tools |
All Industry Types | All Trades | Claim Work Area |
All Industry Types | All Trades | Cleaning up work area |
All Industry Types | All Trades | Connect hose to existing water supply tap |
All Industry Types | All Trades | Cut materials using an electric mitre saw |
All Industry Types | All Trades | Cut steel using a battery powered angle grinder |
All Industry Types | All Trades | Cut Steel using an Angle Grinder |
All Industry Types | All Trades | Cut strapping off around pack of materials |
All Industry Types | All Trades | Cutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool |
All Industry Types | All Trades | Drill hole into masonry surface with a battery powered rotary hammer drill |
All Industry Types | All Trades | Drill hole into masonry surface with an electric rotary hammer drill |
All Industry Types | All Trades | Drill hole using a Battery Powered Drill |
All Industry Types | All Trades | Drill hole using an electric drill |
All Industry Types | All Trades | Driving in and out of carparks and on customer premises |
All Industry Types | All Trades | Driving in and out of carparks and on customer premises |
All Industry Types | All Trades | Erection and use of mobile scaffold |
All Industry Types | All Trades | High Risk Construction Work covered in this JHA |
All Industry Types | All Trades | Inform facilities / operations and security personnel of work location(s) |
All Industry Types | All Trades | Inspect and drive passenger/ light commercial vehicle |
All Industry Types | All Trades | Inspect and drive passenger/ light commercial vehicle on or off site |
All Industry Types | All Trades | Inspection and use of Generator |
All Industry Types | All Trades | Inspection and use of petrol powered high pressure water sprayer |
All Industry Types | All Trades | Install screws using a Battery Powered Drill |
All Industry Types | All Trades | Install screws using a tek gun |
All Industry Types | All Trades | Listening to music while working |
All Industry Types | All Trades | Loading Materials onto roof using an EWP |
All Industry Types | All Trades | Loading materials onto truck using a crane and by hand |
All Industry Types | All Trades | Marking Out Slab or Ground |
All Industry Types | All Trades | Monitoring and review of JHA |
All Industry Types | All Trades | Monitoring and Review of JHA |
All Industry Types | All Trades | Move materials using a trolley (sack Truck) |
All Industry Types | All Trades | Moving materials around on a trolley |
All Industry Types | All Trades | Push Wheel Barrow on site |
All Industry Types | All Trades | Refuelling of machinery |
All Industry Types | All Trades | Repeat the above process steps until completion of task |
All Industry Types | All Trades | Safety Check And Use Of Boom Lift (extended version) |
All Industry Types | All Trades | Safety Check And Use Of Scissor Lift (Extended version) |
All Industry Types | All Trades | Safety inspection and use of Forklift |
All Industry Types | All Trades | Site orientation of domestic residence |
All Industry Types | All Trades | Site Orientation/ Induction |
All Industry Types | All Trades | Sweeping Floor or ground |
All Industry Types | All Trades | Undertake Clients general all sites induction |
All Industry Types | All Trades | Unloading of shipping container with forklift and by hand |
All Industry Types | All Trades | Using an Angle Grinder |
All Industry Types | All Trades | Using an Existing roof anchorpoint system |
All Industry Types | All Trades | Vacuum |
All Industry Types | All Trades | Welding with a portable Electric Welder |
All Industry Types | All Trades | Working at height from a boom lift |
All Industry Types | All Trades | Working at height from a scissor lift |
All Industry Types | All Trades | Working at heights - Generally |
All Industry Types | All Trades | Working at heights - Genrally |
All Industry Types | All Trades | Working in an area with the risk of Coronavirus, Covid-19, Influenza or similar |
All Industry Types | All Trades | Working in Cold Conditions |
All Industry Types | All Trades | Working in High Wind Conditions |
All Industry Types | All Trades | Working in hot conditions |
All Industry Types | All Trades | Working in isolation |
All Industry Types | All Trades | Working in the rain |
All Industry Types | All Trades | Working where there is movement of powered mobile plant |
All Industry Types | All Trades | Write up incident report |
Automotive and Plant | Mechanical | Inspection and use of Four Post Vehicle Hoist |
Automotive and Plant | Mechanical | Inspection and use of Two Post Vehicle Hoist |
Automotive and Plant | Mechanical | on site Servicing to diesel powered vehicle |
Automotive and Plant | Mechanical | Replace diesel fuel filters |
Automotive and Plant | Mechanical | Replace fuel filters |
Automotive and Plant | Mechanical | Replace petrol fuel filters |
Automotive and Plant | Mechanical | Safety inspection and use of TTL Hydraulic Torque Wrench and hydraulic pump |
Automotive and Plant | Mechanical | Safety inspection and use of TTS Hydraulic Torque Wrench and hydraulic pump |
Automotive and Plant | Mechanical | Safety inspection and use of TTX Hydraulic Torque Wrench and hydraulic pump |
Automotive and Plant | Mechanical | Servicing to vehicle in workshop |
Automotive and Plant | Servicing | Change Spark Plugs |
Automotive and Plant | Servicing | Check batteries and charging system |
Automotive and Plant | Servicing | Check system for gas leaks |
Automotive and Plant | Servicing | Grease moving parts and greaseable joints |
Automotive and Plant | Servicing | Inspect/ Repair skirts and scrubber or sweeping brushes |
Automotive and Plant | Servicing | Inspection and use of a gasoline powered air compressor |
Automotive and Plant | Servicing | Inspection and use of petrol powered air compressor |
Automotive and Plant | Servicing | Jack up vehicle/machine |
Automotive and Plant | Servicing | On site Servicing to gasoline powered vehicle |
Automotive and Plant | Servicing | on site Servicing to petrol powered vehicle |
Automotive and Plant | Servicing | Open engine cover/ bonnet/ service compartment |
Automotive and Plant | Servicing | Remove and replace wheels using a pneumatic rattle gun |
Automotive and Plant | Servicing | Replace air filter |
Automotive and Plant | Servicing | Replace brake pads using a pneumatic rattle gun |
Automotive and Plant | Servicing | Replace engine oil and filters |
Automotive and Plant | Servicing | Replace hydraulic hose |
Automotive and Plant | Servicing | Replace hydraulic oil and filters |
Automotive and Plant | Servicing | Replace radiator coolant |
Automotive and Plant | Servicing | servicing a ride on electric sweeper (Complete Job) |
Automotive and Plant | Servicing | servicing a walk gas operated behind sweeper/scrubber (Complete Job) |
Automotive and Plant | Servicing | Servicing to hybrid industrial automatic ride on sweeper/scrubber |
Automotive and Plant | Servicing | Servicing to hybrid industrial automatic ride on sweeper/scrubber (Complete job) |
Automotive and Plant | Servicing | Tune engine |
Cleaning | All Cleaning industries | Carpet Cleaning |
Cleaning | All Cleaning industries | Inspection and use of electric high pressure water sprayer |
Cleaning | All Cleaning industries | Inspection and use of gasoline powered blower/ vacuum |
Cleaning | All Cleaning industries | Inspection and use of gasoline powered high pressure water sprayer |
Cleaning | All Cleaning industries | Inspection and use of petrol powered blower/ vacuum |
Cleaning | Commercial Cleaning | Clean bathroom |
Cleaning | Commercial Cleaning | Clean Glass shower screen with a cloth |
Cleaning | Commercial Cleaning | Clean Glass with a cloth |
Cleaning | Commercial Cleaning | Clean mirror with a cloth |
Cleaning | Commercial Cleaning | Clean Window Using Pure Water Technology |
Cleaning | Commercial Cleaning | Clean Windows Using rope Access |
Cleaning | Commercial Cleaning | Clean Windows with mop and squeegee |
Cleaning | Commercial Cleaning | Cleaning of hard surfaces |
Cleaning | Commercial Cleaning | Cleaning of office and showroom |
Cleaning | Commercial Cleaning | Cleaning of residence |
Cleaning | Commercial Cleaning | Cleaning of Rest Rooms / Toilets |
Cleaning | Commercial Cleaning | Gain access to work are using Rope Access |
Cleaning | Commercial Cleaning | Inspection and use of Carpet Extractor |
Cleaning | Commercial Cleaning | Inspection and use of High-Speed Propane (LPG) Powered Floor Buffer (Burnisher) |
Cleaning | Commercial Cleaning | Inspection and use of Low-Speed Electric Floor Buffer |
Cleaning | Commercial Cleaning | Inspection and use of planetary floor polisher |
Cleaning | Commercial Cleaning | Inspection and use of walk behind battery powered floor scrubber |
Cleaning | Commercial Cleaning | Remove bag from bins and waste paper baskets |
Cleaning | Commercial Cleaning | Steam cleaning of tiles |
Cleaning | Domestic Cleaning | Mopping Floor |
Construction | Air Conditioning and Refrigeration | Access ceiling space via Ladder |
Construction | Air Conditioning and Refrigeration | Core hole through masonry wall with a battery powered rotary hammer drill |
Construction | Air Conditioning and Refrigeration | Cut aluminium angles using a hacksaw and mitre box |
Construction | Air Conditioning and Refrigeration | Cut copper pipe with tube cutter |
Construction | Air Conditioning and Refrigeration | Cut hole into existing plasterboard ceiling using a key hole plasterboard saw |
Construction | Air Conditioning and Refrigeration | Cut Steel/ Unistrut with drop saw |
Construction | Air Conditioning and Refrigeration | Disconnect pipework form existing plant |
Construction | Air Conditioning and Refrigeration | Filling & testing of pipework |
Construction | Air Conditioning and Refrigeration | Fit Pipe insulation over pipes |
Construction | Air Conditioning and Refrigeration | Fit Unistrut brackets onto masonry wall |
Construction | Air Conditioning and Refrigeration | Fix aluminium channels to existing slab using battery powered hammer drill |
Construction | Air Conditioning and Refrigeration | Hang condensing unit onto masonry wall |
Construction | Air Conditioning and Refrigeration | Hang Fan cooler unit inside cool room |
Construction | Air Conditioning and Refrigeration | Install ceiling registers |
Construction | Air Conditioning and Refrigeration | Install flexi ductwork and zone motors in ceiling space |
Construction | Air Conditioning and Refrigeration | Install insulated ceiling panels to cool room |
Construction | Air Conditioning and Refrigeration | Install new wall mounted unit |
Construction | Air Conditioning and Refrigeration | Install TX Valve |
Construction | Air Conditioning and Refrigeration | Installation of Cool Room |
Construction | Air Conditioning and Refrigeration | Installation of ducted system air conditioner |
Construction | Air Conditioning and Refrigeration | Installation of new refrigeration System to new supermarket (complete job) |
Construction | Air Conditioning and Refrigeration | Installation of refrigeration system to cool room |
Construction | Air Conditioning and Refrigeration | Installation of support angles or channels to hanging rods |
Construction | Air Conditioning and Refrigeration | Installation of threaded rod hanging bars |
Construction | Air Conditioning and Refrigeration | Installation of underfloor refrigeration pipework |
Construction | Air Conditioning and Refrigeration | Installation of wall hung split system air conditioner |
Construction | Air Conditioning and Refrigeration | Mixing Polyurethane Isocyanate in a bucket using an electric drill |
Construction | Air Conditioning and Refrigeration | Mount condensing unit onto preinstalled Unistrut brackets |
Construction | Air Conditioning and Refrigeration | Place copper pipes into trench ducting |
Construction | Air Conditioning and Refrigeration | Pour Polyurethane Isocyanate into pipe duct |
Construction | Air Conditioning and Refrigeration | Pressure testing of pipework with nitrogen and charge with refrigerant (HCFC) |
Construction | Air Conditioning and Refrigeration | Reclaim refrigerant gas from existing system |
Construction | Air Conditioning and Refrigeration | Refrigerant charge the system using a vacuum pump |
Construction | Air Conditioning and Refrigeration | Remove existing wall mounted unit |
Construction | Air Conditioning and Refrigeration | Replacement of ducted system air conditioner |
Construction | Air Conditioning and Refrigeration | Replacement of wall hung split system air conditioner |
Construction | Air Conditioning and Refrigeration | Run connecting copper pipework and fit off |
Construction | Air Conditioning and Refrigeration | Run Pipe work through existing ceiling space |
Construction | Air Conditioning and Refrigeration | Secure pipework to structure with saddles |
Construction | Air Conditioning and Refrigeration | Silver solder copper pipes together |
Construction | Air Conditioning and Refrigeration | Stand up cool room panels and fit into bottom track |
Construction | All Trades | Accept load to vehicle from forklift (3rd Party operator) and Loading by hand |
Construction | All Trades | Acceptance of delivery to site for materials |
Construction | All Trades | Acceptance of delivery to site for materials via Crane Truck |
Construction | All Trades | Access roof via Boom Lift |
Construction | All Trades | Access roof via fixed access ladder |
Construction | All Trades | Access roof via Ladder |
Construction | All Trades | Access Roof via scaffold stair access |
Construction | All Trades | Access roof via Scissor Lift |
Construction | All Trades | Access work area using a platform ladder |
Construction | All Trades | Access work area using a step ladder |
Construction | All Trades | Access work area using 'Hop-Up' trestle ladder/ work platform |
Construction | All Trades | Access work area via a mobile scaffold |
Construction | All Trades | Access work area via a scaffold/ working at heights from a scaffold |
Construction | All Trades | Apply touch up paint |
Construction | All Trades | Carrying materials from storage area to work area |
Construction | All Trades | Charging of Li-Ion batteries for use with cordless tools |
Construction | All Trades | Claim Work Area |
Construction | All Trades | Cleaning up work area |
Construction | All Trades | Connect hose to existing water supply tap |
Construction | All Trades | Cut materials using an electric mitre saw |
Construction | All Trades | Cut steel using a battery powered angle grinder |
Construction | All Trades | Cut Steel using an Angle Grinder |
Construction | All Trades | Cut strapping off around pack of materials |
Construction | All Trades | Cutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool |
Construction | All Trades | Drill hole into masonry surface with a battery powered rotary hammer drill |
Construction | All Trades | Drill hole into masonry surface with an electric rotary hammer drill |
Construction | All Trades | Drill hole using a Battery Powered Drill |
Construction | All Trades | Drill hole using an electric drill |
Construction | All Trades | Driving in and out of carparks and on customer premises |
Construction | All Trades | Driving in and out of carparks and on customer premises |
Construction | All Trades | Erection and use of mobile scaffold |
Construction | All Trades | High Risk Construction Work covered in this JHA |
Construction | All Trades | Inform facilities / operations and security personnel of work location(s) |
Construction | All Trades | Inspect and drive passenger/ light commercial vehicle |
Construction | All Trades | Inspect and drive passenger/ light commercial vehicle on or off site |
Construction | All Trades | Inspection and use of Generator |
Construction | All Trades | Inspection and use of petrol powered high pressure water sprayer |
Construction | All Trades | Install screws using a Battery Powered Drill |
Construction | All Trades | Install screws using a tek gun |
Construction | All Trades | Listening to music while working |
Construction | All Trades | Loading Materials onto roof using an EWP |
Construction | All Trades | Loading materials onto truck using a crane and by hand |
Construction | All Trades | Marking Out Slab or Ground |
Construction | All Trades | Monitoring and review of JHA |
Construction | All Trades | Monitoring and Review of JHA |
Construction | All Trades | Move materials using a trolley (sack Truck) |
Construction | All Trades | Moving materials around on a trolley |
Construction | All Trades | Push Wheel Barrow on site |
Construction | All Trades | Refuelling of machinery |
Construction | All Trades | Repeat the above process steps until completion of task |
Construction | All Trades | Safety Check And Use Of Boom Lift (extended version) |
Construction | All Trades | Safety Check And Use Of Scissor Lift (Extended version) |
Construction | All Trades | Safety inspection and use of Forklift |
Construction | All Trades | Site orientation of domestic residence |
Construction | All Trades | Site Orientation/ Induction |
Construction | All Trades | Sweeping Floor or ground |
Construction | All Trades | Undertake Clients general all sites induction |
Construction | All Trades | Unloading of shipping container with forklift and by hand |
Construction | All Trades | Using an Angle Grinder |
Construction | All Trades | Using an Existing roof anchorpoint system |
Construction | All Trades | Vacuum |
Construction | All Trades | Welding with a portable Electric Welder |
Construction | All Trades | Working at height from a boom lift |
Construction | All Trades | Working at height from a scissor lift |
Construction | All Trades | Working at heights - Generally |
Construction | All Trades | Working at heights - Genrally |
Construction | All Trades | Working in an area with the risk of Coronavirus, Covid-19, Influenza or similar |
Construction | All Trades | Working in Cold Conditions |
Construction | All Trades | Working in High Wind Conditions |
Construction | All Trades | Working in hot conditions |
Construction | All Trades | Working in isolation |
Construction | All Trades | Working in the rain |
Construction | All Trades | Working where there is movement of powered mobile plant |
Construction | All Trades | Write up incident report |
Construction | Bricklaying | Acid wash surface by hand |
Construction | Bricklaying | Bricklaying |
Construction | Bricklaying | Bricklaying to new project home |
Construction | Bricklaying | Carry blocks by hand |
Construction | Bricklaying | Carry bricks using a mechanical brick carrier (Clamps) |
Construction | Bricklaying | Cut bricks using a gasoline powered brick saw |
Construction | Bricklaying | Cut bricks using a petrol powered brick saw |
Construction | Bricklaying | Cut bricks using an angle grinder |
Construction | Bricklaying | Installation of lintel by hand |
Construction | Bricklaying | Installation of viscourse |
Construction | Bricklaying | Load bricks onto scaffold by hand |
Construction | Bricklaying | Mixing cement with a portable petrol powered mixer |
Construction | Bricklaying | Mixing cement/ mortar with a portable gasoline powered mixer |
Construction | Bricklaying | Mixing cement/ mortar with a portable petrol powered mixer |
Construction | Bricklaying | Set up mortar boards |
Construction | Bricklaying | Set up Profolds to corners |
Construction | Bricklaying | Wash down brick wall |
Construction | Carpentry | 1st fix carpentry to new 2 story dwelling using a Pneumatic and Impulse Nail Gun |
Construction | Carpentry | 1st fix carpentry to new dwelling using a Pneumatic and Impulse Nail Gun |
Construction | Carpentry | Apply construction adhesive using a calking gun |
Construction | Carpentry | Create temporary work bench using trestles and planks |
Construction | Carpentry | Cut fibre cement sheeting using electric shears |
Construction | Carpentry | Cut fibre cement sheeting using hand operated mechanical shears |
Construction | Carpentry | Cut Hebel/ Autoclaved Aerated Concrete with a diamond blade circular saw |
Construction | Carpentry | Cut timber beading using a hand saw and mitre box |
Construction | Carpentry | Cut timber using a battery powered circular saw |
Construction | Carpentry | Cut timber using a battery powered reciprocating saw |
Construction | Carpentry | Cut timber using a circular saw |
Construction | Carpentry | Cut timber using a jigsaw |
Construction | Carpentry | Cut timber using a reciprocating saw |
Construction | Carpentry | Cut timber using an electric mitre saw |
Construction | Carpentry | Cut wood beading using a hand saw and mitre box |
Construction | Carpentry | Cut wood using a battery powered circular saw |
Construction | Carpentry | Cut wood using a circular saw |
Construction | Carpentry | Cut wood using an electric jigsaw |
Construction | Carpentry | Cut wood using an electric mitre saw |
Construction | Carpentry | Daily preoperational inspection of a Pneumatic (Air) Nail Gun |
Construction | Carpentry | Daily preoperational inspection of an Impulse (gas) Nail Gun |
Construction | Carpentry | Ease/ adjust existing doors |
Construction | Carpentry | Fix fibre cement cladding sheet in place and nail by hand |
Construction | Carpentry | Fix fibre cement soffit/ eaves sheet in place and nail by hand |
Construction | Carpentry | Inspection and use of electric air compressor |
Construction | Carpentry | Install ceiling joist, Hanging beams, stabilisers, etc |
Construction | Carpentry | Install Hebel Panel |
Construction | Carpentry | Install plywood flooring |
Construction | Carpentry | Install solid strip timber flooring (Secret Fix) to timber subfloor |
Construction | Carpentry | Install solid strip wood flooring (Secret Fix) to wood subfloor |
Construction | Carpentry | Install 'STRUCTAflor' particle board flooring |
Construction | Carpentry | Install timber roof trusses by hand |
Construction | Carpentry | Install trimmers/ noggings to wood framing |
Construction | Carpentry | Install wood roof trusses by hand |
Construction | Carpentry | Install wood wall linings using a battery powered drill |
Construction | Carpentry | Installation of Doors and Door Hardware |
Construction | Carpentry | Installation of eaves linings to new domestic residence |
Construction | Carpentry | Installation of floor joist |
Construction | Carpentry | Installation of Timber Purlins |
Construction | Carpentry | Manufacture timber wall frames using a mitre saw and an Impulse (gas) Nail Gun |
Construction | Carpentry | Manufacture timber wall frames using a mitre saw and Pneumatic (Air) Nail Gun |
Construction | Carpentry | Mark out slab using a chalk line |
Construction | Carpentry | Measure for cladding above roof |
Construction | Carpentry | Measure perimeter of house |
Construction | Carpentry | Nail timber using a pneumatic (Air) nail gun |
Construction | Carpentry | Nail timber using an Impulse (gas) Nail Gun |
Construction | Carpentry | Passing up Sheets and Accessories from the ground |
Construction | Carpentry | Position floor boards together using a plank jack/ floor dog |
Construction | Carpentry | Removal of existing doors |
Construction | Carpentry | Set up trestle scaffold |
Construction | Carpentry | Stand up wall frames |
Construction | Civil | Arrive at domestic site with truck and establish unloading area |
Construction | Civil | Arrive at domestic site with truck and trailer and establish unloading area |
Construction | Civil | Back Fill trench by hand with original spoil |
Construction | Civil | Back Fill trench using excavator with original spoil |
Construction | Civil | Clean street and footpath |
Construction | Civil | Compact area using a gasoline powered leg rammer |
Construction | Civil | Compact area using a gasoline powered vibrating plate |
Construction | Civil | Compact area using a petrol powered leg rammer |
Construction | Civil | Compact area using a petrol powered vibrating plate |
Construction | Civil | Compact area with Road roller (roller-compactor) |
Construction | Civil | Cutting Bitumen with a Quick Cut Diamond blade saw |
Construction | Civil | Daily preoperational inspection of a Pneumatic Jack Hammer |
Construction | Civil | Delivery and unloading of mobile plant |
Construction | Civil | Delivery, Safety Check And Use Of Dingo |
Construction | Civil | Dig Hole by hand |
Construction | Civil | Dig hole with power driven auger |
Construction | Civil | Dig Trench by hand |
Construction | Civil | Dig trench using a chain trencher |
Construction | Civil | Dumping/Unloading load on ground using a tip truck/ dump truck |
Construction | Civil | Inspect and drive Tip Truck/ Dump Truck |
Construction | Civil | Inspection and use of diesel powered air compressor |
Construction | Civil | Inspection and use of Motor Grader/ Road Grader |
Construction | Civil | Installation of lintel using a skid steer loader |
Construction | Civil | Laying asphalt with paver which is filled from tipper |
Construction | Civil | Laying blue metal paver which is filled from tipper |
Construction | Civil | Load skid steer loader onto trailer using aluminium ramps |
Construction | Civil | Load skid steer loader onto truck using aluminium ramps |
Construction | Civil | Mixing concrete with a portable mixer |
Construction | Civil | Move soil by hand using a shovel |
Construction | Civil | Operation of drilling rig and soil sampling |
Construction | Civil | Place rubble around domestic site using a skid steer loader |
Construction | Civil | Planning for wet weather and flooding events |
Construction | Civil | Raising Sewer/ Stormwater Pits and Valve covers in an existing bitumen roadway |
Construction | Civil | Remove and fit attachments on Excavator |
Construction | Civil | Remove and fit attachments on skid steer loader |
Construction | Civil | Remove rubbish and debris from domestic site using skid steer loader and truck |
Construction | Civil | Remove soil from domestic site using a skid steer loader and truck |
Construction | Civil | Remove spoil from auger using wheel barrow |
Construction | Civil | Safety check and operation of Excavator |
Construction | Civil | Safety check and operation of Excavator for trenching and excavations |
Construction | Civil | Safety inspection and use of skid steer loader |
Construction | Civil | Safety inspection and use of wheeled front end loader |
Construction | Civil | Set up and use laser level |
Construction | Civil | Site Set Out |
Construction | Civil | Spread rubble around site using a skid steer loader |
Construction | Civil | Spreading soil with Shovel and Rake |
Construction | Civil | Tack coating (including use of hand lance) prior to laying asphalt |
Construction | Civil | Unload skid steer excavator from trailer using aluminium ramps |
Construction | Civil | Unload skid steer loader from trailer using aluminium ramps |
Construction | Civil | Unload skid steer loader from truck using aluminium ramps |
Construction | Civil | Using a pneumatic Jack Hammer/ pneumatic Breaker/ Demolition Hammer |
Construction | Concreter and Concrete Repair | Abrasive blasting |
Construction | Concreter and Concrete Repair | Apply high strength repair mortar |
Construction | Concreter and Concrete Repair | Apply surface sealant material (Kahfill) to face of crack |
Construction | Concreter and Concrete Repair | Concrete and reinforcement repairs |
Construction | Concreter and Concrete Repair | Concrete crack repair and injection |
Construction | Concreter and Concrete Repair | Concrete Delivery and Pumping |
Construction | Concreter and Concrete Repair | Dig Hole by hand |
Construction | Concreter and Concrete Repair | Dig Trench by hand |
Construction | Concreter and Concrete Repair | Finishing concrete with gasoline powered trowel (Helicopter) |
Construction | Concreter and Concrete Repair | Finishing concrete with petrol powered trowel (Helicopter) |
Construction | Concreter and Concrete Repair | Injection of Nitofill LV epoxy resin |
Construction | Concreter and Concrete Repair | Install damp proof membrane (Forticon plastic) |
Construction | Concreter and Concrete Repair | Mixing concrete with a portable mixer |
Construction | Concreter and Concrete Repair | Place steel reinforcing mesh |
Construction | Concreter and Concrete Repair | Placing Concrete |
Construction | Concreter and Concrete Repair | Pouring Concrete |
Construction | Concreter and Concrete Repair | Pouring Concrete Slab using a pump and a helicopter |
Construction | Concreter and Concrete Repair | Water ingress repair using XYPEX |
Construction | Concreter and Concrete Repair | Working with silica and silica containing products |
Construction | Demolition | Cut masonry wall with a Quick Cut Diamond blade saw |
Construction | Demolition | Cut steel using a reciprocating saw |
Construction | Demolition | Cutting Concrete with a Quick Cut Diamond blade saw |
Construction | Demolition | Decontamination of Plant |
Construction | Demolition | Demolition of cupboards and built in robes |
Construction | Demolition | Demolition of existing Drywall lined partition stud wall |
Construction | Demolition | Demolition of existing flush jointed plasterboard ceiling |
Construction | Demolition | Demolition of existing plasterboard lined partition stud wall |
Construction | Demolition | Demolition/ removal of bathroom fixtures and fittings |
Construction | Demolition | Demolition/ Removal of existing carpet and undelay |
Construction | Demolition | Demolition/ removal of existing ceiling tiles |
Construction | Demolition | Demolition/ removal of existing Compactus shelving unit |
Construction | Demolition | Demolition/ Removal of existing insulated panel cool room/ freezer by hand |
Construction | Demolition | Demolition/ removal of existing joinery |
Construction | Demolition | Demolition/ removal of existing suspended exposed grid ceiling |
Construction | Demolition | Demolition/ Removal of existing vinyl flooring |
Construction | Demolition | Demolition/ Removal of existing wall and floor tiles using an elec jack hammer |
Construction | Demolition | Demolition/ Removal of timber planking by hand |
Construction | Demolition | Enter asbestos removal area through the Decontamination Unit |
Construction | Demolition | Exit asbestos removal area through the Decontamination Unit |
Construction | Demolition | Jimmy/ prise fixtures away from wall |
Construction | Demolition | Knock out brick s using a hammer |
Construction | Demolition | Lead based paint removal using Peel away Paint Removal System |
Construction | Demolition | Lining of the Truck with Plastic Lining |
Construction | Demolition | Lower materials to ground with ropes |
Construction | Demolition | Part demolition of existing brick wall to form new opening |
Construction | Demolition | Remediation of asbestos contaminated soil by hand and using general hand tools |
Construction | Demolition | Removal of asbestos adhesive from hard surface |
Construction | Demolition | Removal of Asbestos products |
Construction | Demolition | Removal/ demolition of existing suspended exposed grid ceiling |
Construction | Demolition | Remove asbestos clothing |
Construction | Demolition | Remove existing suspended ceiling tiles |
Construction | Demolition | Remove nuts using a battery powered rattle gun |
Construction | Demolition | Remove screws using a battery powered drill |
Construction | Demolition | Removing friable asbestos by hand |
Construction | Demolition | Removing friable asbestos-contaminated soil by hand and using an excavator |
Construction | Demolition | Removing non friable asbestos by hand |
Construction | Demolition | Removing non-friable asbestos-contaminated soil by hand and using an excavator |
Construction | Demolition | Safety check and operation of Excavator for demolition works |
Construction | Demolition | Safety Inspection and use of Hydraulic Rock Breaker |
Construction | Demolition | Safety Inspection and use of Hydraulic Shear attachment |
Construction | Demolition | Selection and Use of PPE |
Construction | Demolition | Spray PVA Glue with an electric airless sprayer |
Construction | Demolition | Using an electric Jack Hammer/ Electric Breaker/ Demolition Hammer |
Construction | Electrical | Connect new cables into electrical plant/ equipment |
Construction | Electrical | Connect new cables into existing switchboard |
Construction | Electrical | Dig Trench by hand |
Construction | Electrical | Disconnect electrical from existing plant |
Construction | Electrical | Fill out and issue Electrical Certificate of Compliance |
Construction | Electrical | Fit power outlet to drywall |
Construction | Electrical | Fit power point to plasterboard wall |
Construction | Electrical | Fit switch to drywall |
Construction | Electrical | Fit switch to plasterboard wall |
Construction | Electrical | Install Inverter |
Construction | Electrical | Install isolator |
Construction | Electrical | Install Mounting brackets and rails to roof |
Construction | Electrical | Install solar panels onto the mounting frame |
Construction | Electrical | Installation of cable tray |
Construction | Electrical | Installation of Cable Tray Covers |
Construction | Electrical | Installation of catenary cable |
Construction | Electrical | Installation of Solar System to Domestic Dwelling |
Construction | Electrical | Isolate power to existing system |
Construction | Electrical | Replace existing light fittings |
Construction | Electrical | Rewire in conduits between light fittings |
Construction | Electrical | Run Cables and secure to catenary cable |
Construction | Electrical | Run Cables through existing ceiling space |
Construction | Electrical | Secure conduits to structure with saddles |
Construction | Electrical | Test the electrical installation |
Construction | Electrical | Tracing and identifying existing live lighting circuits - for fault purposes |
Construction | Electrical | Working in ceiling space |
Construction | Fencing | Cut fence sheets with electric shears |
Construction | Fencing | Delivery and installation of temporary fencing |
Construction | Fencing | Install chainmesh fencing |
Construction | Fencing | Install posts |
Construction | Fencing | Install star pickets using a hammer and Star Post Dropper |
Construction | Fencing | Installation of Panel fencing |
Construction | Fencing | Installation of post and rail metal clad fencing |
Construction | Fencing | Installation of temporary fencing |
Construction | Fencing | Mix concrete in a wheel barrow |
Construction | Fencing | Removal of temporary fencing |
Construction | Fencing | Screw fence sheets to rail using a battery powered drill |
Construction | Fire Protection | Connect new cables into existing fire panel |
Construction | Fire Protection | Fit speakers and detectors to drywall ceiling |
Construction | Fire Protection | Fit speakers and detectors to plasterboard ceiling |
Construction | Fire Protection | Install suspended fire pipework to underside of concrete slab |
Construction | Fire Protection | Install suspended fire pipework to underside of roof purlins |
Construction | Fire Protection | Run Pipe work and cables through existing ceiling space |
Construction | Fire Protection | Thread pipe using a Portable Power Pipe Threader |
Construction | Fire Protection | Working in a confined space |
Construction | Floor Finisher and Coverer | Inspection and use of Diamond Floor Grinder |
Construction | Floor Finisher and Coverer | Install Carpet and underlay to a concrete floor |
Construction | Floor Finisher and Coverer | Install Carpet and underlay to a timber floor |
Construction | Floor Finisher and Coverer | Install vinyl skirting |
Construction | Floor Finisher and Coverer | Install vinyl floors |
Construction | Formworker | Install bearers and joists to formwork support frames |
Construction | Formworker | Install 'Bondek' or Similar formwork to structure Using an Explosive Power Tool |
Construction | Formworker | Install plywood formwork to support framing |
Construction | Formworker | Installation of formwork support frames |
Construction | Formworker | Installation of simple formwork |
Construction | Formworker | Stripping formply |
Construction | Formworker | Using an Explosive Power Tool |
Construction | General Building | Another us |
Construction | General Building | Brick and Blocklaying |
Construction | General Building | Clean up site by hand using a wheel barrow to transfer debris to bin |
Construction | General Building | Concrete filling of blockwork by bucket |
Construction | General Building | Construction Site Establishment and Project Risk Assessment |
Construction | General Building | Cut wood using a battery powered reciprocating saw |
Construction | General Building | Cut wood using a reciprocating saw |
Construction | General Building | Install Acro prop |
Construction | General Building | Install Carpet and underlay to a wood floor |
Construction | General Building | Install Pull down attic ladder into drywall ceiling and wood framing |
Construction | General Building | Project Risk Assessment |
Construction | General Building | Refurbishment of residence/ unit |
Construction | General Building | Remove existing silicone |
Construction | Glazier | Carrying Window frames from storage area to work area |
Construction | Glazier | Cut aluminium sections using an electric mitre saw |
Construction | Glazier | Install Aluminium deflection head and sub sill |
Construction | Glazier | Install glass into frame |
Construction | Glazier | Install window frames into deflection head and sub sill |
Construction | Glazier | Installation of Glazed aluminium partitions |
Construction | Glazier | Unload glass from vehicle onto trolley |
Construction | Height Safety | Inspect and certify the anchor point installation |
Construction | Height Safety | Inspect and certify the static line installation |
Construction | Height Safety | Install anchor points into existing concrete slab |
Construction | Height Safety | Install Horizontal Life line fixed to masonry wall |
Construction | Height Safety | Install Horizontal Life line fixed to overhead concrete |
Construction | Height Safety | Install Horizontal Life line fixed to overhead structural steel |
Construction | Height Safety | Install Horizontal Life line surface mounted to metal roof sheeting |
Construction | Height Safety | Install modular access ladder to structural wall girts behind wall cladding |
Construction | Height Safety | Install modular access ladders to existing masonry wall |
Construction | Height Safety | Install Pull down attic ladder into drywall ceiling and steel framing |
Construction | Height Safety | Install Pull down attic ladder into plasterboard ceiling and steel framing |
Construction | Height Safety | Install Pull down attic ladder into plasterboard ceiling and timber framing |
Construction | Height Safety | Install Pull down attic ladder into suspended exposed grid ceiling |
Construction | Height Safety | Install rafter mounted anchor points to a tiled roof |
Construction | Height Safety | Install Rafter Mounted anchor points to tiled roof without edge protection |
Construction | Height Safety | Install roof access hatch into a metal roof |
Construction | Height Safety | Install Safety Anchors to an existing roof (wood from above and below) |
Construction | Height Safety | Install Surface Mounted anchor points to metal roof |
Construction | Height Safety | Install Surface Mounted anchor points to metal roof without edge protection |
Construction | Height Safety | Measure and mark out for system installation |
Construction | Height Safety | Run and Connect Static Line Cable |
Construction | Height Safety | Twin rope rescue via pick off and take to ground |
Construction | Height Safety | Using a Harness and Static Line |
Construction | Home Improvements | Build Steel Wall Frame and Bolt Wall Girths to Columns |
Construction | Home Improvements | Build Wall Frame and Tek Screw Wall Girths to Columns |
Construction | Home Improvements | Drill Wall Girths and Purlins with an electric drill |
Construction | Home Improvements | Installation of Garage (Domestic Shed) complete job |
Construction | Home Improvements | Installation of Roller Door (domestic) |
Construction | Home Improvements | Installation of Steel Portal Roof Trusses by hand |
Construction | Home Improvements | Installation of Steel Roof Purlins by hand |
Construction | Home Improvements | Installation of Steel Wall Girths by hand |
Construction | Home Improvements | Installation of Temporary Height Safety System - Starting from Platform Ladder |
Construction | Home Improvements | Installation of wall sheeting from Ground |
Construction | Home Improvements | Mixing concrete with a portable mixer |
Construction | Home Improvements | Push Wheel Barrow on site |
Construction | Home Improvements | Screw fixing wall sheeting from platform ladder |
Construction | Home Improvements | Srew fixing wall sheeting from platform ladder |
Construction | Home Improvements | Stand up clad walls |
Construction | Home Improvements | Wash out mixer |
Construction | Joinery | Adjust hinges to joinery doors |
Construction | Joinery | Cut timber to size using a table saw |
Construction | Joinery | Cut wood to size using a table saw |
Construction | Joinery | Grinding/ Polishing bench tops with a handheld grinder |
Construction | Joinery | Install wall mounted cupboards to stud wall |
Construction | Joinery | Install aluminium skirting |
Construction | Joinery | Install cupboards |
Construction | Joinery | Install Kick plate |
Construction | Joinery | Install pre laminated bench top |
Construction | Joinery | Install prefabricated steel counter frames |
Construction | Joinery | Install timber wall linings |
Construction | Joinery | Install timber wall linings using a battery powered drill |
Construction | Joinery | Installation of new kitchen joinery |
Construction | Joinery | Lay Hebel panels into frames and grout into position |
Construction | Landscaping | Acceptance of delivery of concrete |
Construction | Landscaping | Install irrigation poly pipe and fittings |
Construction | Landscaping | Installation of subsurface irrigation system |
Construction | Landscaping | Installation of Synthetic Turf |
Construction | Landscaping | Lay brick pavers |
Construction | Landscaping | Planting of trees and shrubs by hand |
Construction | Landscaping | Preparation and installation of synthetic turf |
Construction | Landscaping | Prepare and lay brick pavers |
Construction | Landscaping | Screed sand |
Construction | Landscaping | Sweeping sand over pavers and into cracks |
Construction | Landscaping | Trowel cement to edges of pavers |
Construction | Louvres | Install louvre blades into mullion/ blade carriers |
Construction | Louvres | Install louvre doors into existing masonry opening |
Construction | Louvres | Install louvre mullions to existing steel girths using a battery powered drill |
Construction | Louvres | Installation of Horizontal Sunshade Panels into position by hand |
Construction | Louvres | Installation of louvre members - Using a boom lift |
Construction | Louvres | Loading Louvre members onto roof using a crane |
Construction | Louvres | Manually lift panel into position |
Construction | Maritime | Drive piles with a crane lifted vibro hammer vibrating hammer pile driver |
Construction | Maritime | Inspection and use of tender vessel |
Construction | Maritime | Inspection and use of the vessel mounted crane |
Construction | Maritime | Inspection and use of the vessel mounted forklift |
Construction | Maritime | Lowering and raising spuds |
Construction | Maritime | Tow and Position Barge |
Construction | Maritime | Unload barge from truck to water with a mobile crane |
Construction | Maritime | Working in the water |
Construction | Maritime | Working on a Barge |
Construction | Maritime | Working on a work boat/ vessel |
Construction | Mechanical Services | Connect temporary power supply and test operation of hoist |
Construction | Mechanical Services | Final connections and commissioning of lift |
Construction | Mechanical Services | Install hoist motor |
Construction | Mechanical Services | Installation of four post vehicle hoist |
Construction | Mechanical Services | Installation of four post vehicle hoist (complete job including pick up and del) |
Construction | Mechanical Services | Installation of scissor lift vehicle hoist (complete job inc pick up and del) |
Construction | Mechanical Services | Installation of two post vehicle hoist |
Construction | Mechanical Services | Installation of two post vehicle hoist (complete job including pick up and del) |
Construction | Mechanical Services | Lift Car Installation and Fit Out |
Construction | Mechanical Services | Lift Installation |
Construction | Mechanical Services | Lift Shaft Fitout |
Construction | Mechanical Services | Lift shaft rail installation into Masonry shaft |
Construction | Mechanical Services | Plumb Lift Shaft |
Construction | Mechanical Services | Removal and Replacement of gantry crane radio control unit |
Construction | Mechanical Services | Routine Inspection of 2 post vehicle hoist |
Construction | Mechanical Services | Routine Inspection of 4 post vehicle hoist |
Construction | Mechanical Services | Routine Inspection of scissor lift vehicle hoist |
Construction | Painting and Decorating | Fill holes and imperfections |
Construction | Painting and Decorating | Painting of ceilings |
Construction | Painting and Decorating | Painting of walls |
Construction | Painting and Decorating | Painting of Walls and Ceilings |
Construction | Painting and Decorating | Painting with an electric airless sprayer |
Construction | Plumbing | Back Fill trench by hand with original spoil |
Construction | Plumbing | Clean trenches and setting grade by hand |
Construction | Plumbing | Clearing a blocked drain using an Electric Eel |
Construction | Plumbing | Commercial drainage and hot & cold water reticulation (complete plumbing job 1 ) |
Construction | Plumbing | Connect pipes together using a flexible connector |
Construction | Plumbing | Connect sewer drain to government connection |
Construction | Plumbing | Connect water inlet and outlet |
Construction | Plumbing | Cut down UPVC risers using a battery powered angle grinder |
Construction | Plumbing | Cut down UPVC risers using an angle grinder |
Construction | Plumbing | Cut into existing earthenware branch using and angle grinder |
Construction | Plumbing | Dig Trench by hand |
Construction | Plumbing | Drain water system |
Construction | Plumbing | Drill hole into existing concrete slab with an electric rotary hammer drill |
Construction | Plumbing | Drill hole into existing contrete slab with an electric rotary hammer drill |
Construction | Plumbing | Electro-Fusion Welding of MDPE of HDPE pipe |
Construction | Plumbing | Fit cover plates and mini cocks to outlets |
Construction | Plumbing | Fit Pipe insulation over pipes |
Construction | Plumbing | Fit Tapware/ mixers |
Construction | Plumbing | Fit 'T's and connectors to plastic pipes |
Construction | Plumbing | Glue jointing closed cell elastomeric pipe insulation |
Construction | Plumbing | Install backflow prevention valve |
Construction | Plumbing | Install cistern and flush pipe |
Construction | Plumbing | Install damp proof membrane to trimmers/noggings prior to brass fittings |
Construction | Plumbing | Install dishwasher |
Construction | Plumbing | Install electric storage hot water service (HWS) |
Construction | Plumbing | Install gas instantaneous hot water service (HWS) |
Construction | Plumbing | Install hand basins |
Construction | Plumbing | Install hot and cold water fist fix plumbing (Steel framed) |
Construction | Plumbing | Install hot and cold water fist fix plumbing (Timber framed) |
Construction | Plumbing | Install hot and cold water fist fix plumbing (Wood framed) |
Construction | Plumbing | Install sinks/ troughs |
Construction | Plumbing | Install Stopcock valve |
Construction | Plumbing | Install suspended pipework to underside of concrete slab |
Construction | Plumbing | Install suspended pipework to underside of roof purlins |
Construction | Plumbing | Install temporary caps to fixtures |
Construction | Plumbing | Install toilet (WC Pan) |
Construction | Plumbing | Install trimmers/ nogging to steel framing |
Construction | Plumbing | Install trimmers/ noggings to timber framing |
Construction | Plumbing | Install W45 Brass male lugged elbows, breaching pieces and mixers to steel frame |
Construction | Plumbing | Install Zip Autoboil |
Construction | Plumbing | Installation of baths |
Construction | Plumbing | Installation of Gas storage hot water system (HWS) |
Construction | Plumbing | Installation of mechanical masonry anchors |
Construction | Plumbing | Installation of underfloor plumbing and drains |
Construction | Plumbing | Installation of UPVC pipe |
Construction | Plumbing | Isolate water to premises |
Construction | Plumbing | Lift member using a forklift and lifting jib |
Construction | Plumbing | Load skid steer excavator onto truck/ trailer using aluminium ramps |
Construction | Plumbing | Mark out studwork for trimmer and fixture locations |
Construction | Plumbing | Pipe freezing using liquid nitrogen |
Construction | Plumbing | Plug the unit into the power supply outlet |
Construction | Plumbing | Plumbing final fit |
Construction | Plumbing | Pressure testing of hot and cold pipework |
Construction | Plumbing | Run copper plumbing pipework and fit off |
Construction | Plumbing | Run plastic water/ gas pipework and fit off |
Construction | Plumbing | Secure W45 Brass male lugged elbows, breaching pieces and mixers |
Construction | Plumbing | Service and replacement of TMV in masonry wall |
Construction | Plumbing | Sleeve and apply silicone around pipework passing trough holes |
Construction | Plumbing | Test the property |
Construction | Plumbing | Unpack fixtures/ materials |
Construction | Plumbing | Welding copper tube |
Construction | Plumbing | Welding/ silver soldering copper pipes together |
Construction | Plumbing | Working in open trench |
Construction | Precast | Joint Caulking |
Construction | Rigging | Industrial rope access |
Construction | Rigging | Installation of Columns - Using a Crane |
Construction | Rigging | Installation of steel cable |
Construction | Roof Tiling | Carrying mortar in a bucket to work area |
Construction | Roof Tiling | Mix mortar in a wheel barrow |
Construction | Roof Tiling | Place tile onto mortar bed and trowel off |
Construction | Roof Tiling | Re-bed tiled roof ridge capping |
Construction | Roof Tiling | Replace broken roof tiles |
Construction | Roof Tiling | Repointing of ridge tiles |
Construction | Roof Tiling | Set up mortar bed formwork frame |
Construction | Roofing | Apply silicone to joint |
Construction | Roofing | Cleanout gutter by hand |
Construction | Roofing | Creating Roof Penetrations |
Construction | Roofing | Cut Insulated Panel with a circular saw |
Construction | Roofing | Cut metal roof sheets with battery powered shears |
Construction | Roofing | Cut metal roof sheets with electric shears |
Construction | Roofing | Cut metal wall sheets with battery powered shears |
Construction | Roofing | Cutting Roof Sheets with snips |
Construction | Roofing | Fit angles and trims using a battery powered drill and pop rivets |
Construction | Roofing | Form and Flash Roof Penetrations |
Construction | Roofing | Install Box Gutter with saddles straps and gutter board |
Construction | Roofing | Install Pierced Fixed Roof Sheets using a battery powered drill |
Construction | Roofing | Install Safety Anchors to an existing roof (Timber from above and below) |
Construction | Roofing | Install Stone Sheeting |
Construction | Roofing | Install Temporary Edge Protection |
Construction | Roofing | Install Temporary Edge Protection from an EWP |
Construction | Roofing | Install top hats to steel structure |
Construction | Roofing | Install variable pitch roof ventilators to metal roof |
Construction | Roofing | Installation of Air-Cell Insulation |
Construction | Roofing | Installation of Anchorpoints to existing roof |
Construction | Roofing | Installation of concealed clip roof decking |
Construction | Roofing | Installation of Downpipes |
Construction | Roofing | Installation of Eaves Gutters |
Construction | Roofing | Installation of fascia cladding - From a scaffold |
Construction | Roofing | Installation of fascia cladding - From a scissor lift |
Construction | Roofing | Installation of Flashings using a battery powered drill |
Construction | Roofing | Installation of insulation to roof |
Construction | Roofing | Installation of insulation to walls |
Construction | Roofing | Installation of metal battens |
Construction | Roofing | Installation of metal Fascia |
Construction | Roofing | Installation of Metal Fascias from ladder |
Construction | Roofing | Installation of Rain Water Head |
Construction | Roofing | Installation of Roof Sheets |
Construction | Roofing | Installation of roof vents |
Construction | Roofing | Installation of Roof walkway |
Construction | Roofing | Installation of Safety Mesh from Roof |
Construction | Roofing | Installation of Safety Mesh to roof area - From EWP |
Construction | Roofing | Installation of Safety Mesh to roof area - From Scaffold |
Construction | Roofing | Installation of Safety Mesh to Roof From Roof and Scissor Lift on one side |
Construction | Roofing | Installation of Soffit Sheeting - From EWP |
Construction | Roofing | Installation of Soffit Sheeting - From Scaffold |
Construction | Roofing | Installation of Static line system |
Construction | Roofing | Installation of Support Mesh to walls - Using Scissor Lift |
Construction | Roofing | Installation of Temporary Height Safety System - starting from Scissor |
Construction | Roofing | Installation of Temporary Height Safety System - to Existing roof from Scaffold |
Construction | Roofing | Installation of Temporary Height Safety System to new roof |
Construction | Roofing | Installation of Temporary Static Line |
Construction | Roofing | Installation of top hats to masonry wall |
Construction | Roofing | Installation of UPVC Pipe |
Construction | Roofing | Installation of vent ridge |
Construction | Roofing | Installation of wall sheeting from Ground and Boom Lift |
Construction | Roofing | Installation of wall sheeting from Ground and Scaffold |
Construction | Roofing | Installation of wall sheeting from Ground and Scissor Lift |
Construction | Roofing | Installing External/ Internal Downpipes |
Construction | Roofing | Installing Rain Water Heads |
Construction | Roofing | Installing Roof Sheets |
Construction | Roofing | Load materials into boom lift |
Construction | Roofing | Loading Roof Sheets or materials with Crane |
Construction | Roofing | Measure Roofing using temporary Anchor Points |
Construction | Roofing | Moving materials over the roof |
Construction | Roofing | New-Roofing (Domestic) |
Construction | Roofing | Passing up Roof Sheets and Accessories from the ground |
Construction | Roofing | Re-fall box gutter |
Construction | Roofing | Removal of Asbestos products |
Construction | Roofing | Removal of Ceiling Sheets |
Construction | Roofing | Removal of Existing (Flat Roof)- Roof Sheeting |
Construction | Roofing | Removal of existing Blanket insulation |
Construction | Roofing | Removal of existing Box Gutter |
Construction | Roofing | Removal of existing ceiling flashings |
Construction | Roofing | Removal of existing Ceiling Insulation from open roof |
Construction | Roofing | Removal of existing roof flashings |
Construction | Roofing | Removal of existing Roof Sheeting and Accessories |
Construction | Roofing | Removal of existing Roof Sheeting and Aceesories |
Construction | Roofing | Removal of existing roof tiles |
Construction | Roofing | Removal of Existing RWH |
Construction | Roofing | Removal of materials from roof area by hand - Using EWP |
Construction | Roofing | Removal of wall sheeting |
Construction | Roofing | Remove all materials, equipment and waste from site |
Construction | Roofing | Remove and reinstate dektites |
Construction | Roofing | Remove and Reinstate Roof Screws |
Construction | Roofing | Remove and reinstate Skylight sheeting |
Construction | Roofing | Re-Roofing |
Construction | Roofing | Roof Plumbing Servicing and Maintenance |
Construction | Roofing | Visual Inspection of Structure |
Construction | Scaffolder | Erecting, Altering and Dismantling Prefabricated Steel Modular Scaffolding |
Construction | Scaffolder | Erection and use of a steel tube scaffold |
Construction | Scaffolder | Erection and use of aluminium tube scaffold |
Construction | Scaffolder | Erection and Use of Mobile Scaffold (Extended Version) |
Construction | Scaffolder | Installation of cantilevered K-Stage Modular Steel Scaffold |
Construction | Scaffolder | Installation of K-Stage Modular Steel Scaffold |
Construction | Seating | Attach platform to wall bracket |
Construction | Seating | Install Drive Motor to Platform Frame |
Construction | Seating | Install end safety rails to Retractable platforms |
Construction | Seating | Installation of Chair Modules |
Construction | Seating | Installation of fixed stadium seating (complete Job) |
Construction | Seating | Installation of fixing brackets to concrete |
Construction | Seating | Installation of Plywood Decks |
Construction | Seating | Installation of retractable stadium seating |
Construction | Shelving and Racking | Assemble Frames and bolt together |
Construction | Shelving and Racking | Dismantling of Pallet Racking |
Construction | Shelving and Racking | Install handrails to platform |
Construction | Shelving and Racking | Install horizontal racking beams from a scissor lift |
Construction | Shelving and Racking | Install horizontal racking beams from ground |
Construction | Shelving and Racking | Install staircase assembly using a forklift and lifting jib |
Construction | Shelving and Racking | Installation of cantilever racking |
Construction | Shelving and Racking | Installation of Longspan shelving |
Construction | Shelving and Racking | Installation of Pallet Racking |
Construction | Shelving and Racking | Installation of Pallet Racking (complete job) |
Construction | Shelving and Racking | Installation of Static Shelving |
Construction | Shelving and Racking | Installation of Stock Picking Racking |
Construction | Shelving and Racking | Level racking and bolt to slab |
Construction | Shelving and Racking | Manually lower installed rack frames to the ground |
Construction | Shelving and Racking | Pigeon Hole Rack Assembly (Complete Job) |
Construction | Shelving and Racking | Remove horizontal racking beams from a scissor lift |
Construction | Shelving and Racking | Remove horizontal racking beams from ground |
Construction | Shelving and Racking | Stand up pre-assembled rack frames |
Construction | Shelving and Racking | Stand up pre-assembled rack frames using a Forklift and Rack Frame Lifting Jib |
Construction | Solid Plastering | Chip out loose concrete/ cement or render with scabbling hammer |
Construction | Solid Plastering | Clean masonry surface using an electric grinder and cup disc |
Construction | Solid Plastering | Mix acrylic render in a bucket using an electric drill |
Construction | Solid Plastering | Mixing Adhesive/ Mortar/ Render/ Cement based products with an electric drill |
Construction | Solid Plastering | Rendering/ solid plastering |
Construction | Solid Plastering | Trowel acrylic render onto surface |
Construction | Steel Fixer | Cut steel reinforcing using bolt cutters |
Construction | Steel Fixer | Place steel reinforcing in footing |
Construction | Structural Steel | Claim work area on rail line |
Construction | Structural Steel | Cleaning steel using a battery powered grinder with a wire brush attachment |
Construction | Structural Steel | Cleaning steel using an electric grinder with a wire brush attachment |
Construction | Structural Steel | Concrete filling of Columns by bucket |
Construction | Structural Steel | Coring concrete |
Construction | Structural Steel | Crane Set Up |
Construction | Structural Steel | Cutting Steel with an Oxy- Torch |
Construction | Structural Steel | Drill hole using a magnetic drill |
Construction | Structural Steel | Grout Columns |
Construction | Structural Steel | Inject Epoxy into holes |
Construction | Structural Steel | Install connecting bolts and tension nuts using a battery powered rattle gun |
Construction | Structural Steel | Installation of Ball Tube Handrail |
Construction | Structural Steel | Installation of Chem Anchors onto existing masonry surface |
Construction | Structural Steel | Installation of Chem Anchors onto existing masonry wall |
Construction | Structural Steel | Installation of Columns by hand |
Construction | Structural Steel | Installation of Dynabolts |
Construction | Structural Steel | Installation of Floor Grating |
Construction | Structural Steel | Installation of Girts - Using an EWP |
Construction | Structural Steel | Installation of Hold Down bolts into existing Concrete |
Construction | Structural Steel | Installation of Roof Purlins - Using a Crane |
Construction | Structural Steel | Installation of Steel Members - Using an EWP |
Construction | Structural Steel | Installation of Steel Bracing Members - Using an EWP |
Construction | Structural Steel | Installation of Steel Members - Using a Crane |
Construction | Structural Steel | Installation of Steel members by hand |
Construction | Structural Steel | Installation of Wall plate by Hand |
Construction | Structural Steel | Installing Bolts through existing concrete slab |
Construction | Structural Steel | Land Column into position with Crane |
Construction | Structural Steel | Land Member into position using crane |
Construction | Structural Steel | Lift members into position by hand |
Construction | Structural Steel | Lifting materials using duct lifters |
Construction | Structural Steel | Lifting members using a chain block |
Construction | Structural Steel | Removal of Steel Members by hand using EWP |
Construction | Structural Steel | Tension nuts using a battery powered rattle gun |
Construction | Structural Steel | Welding cleats to existing structure with a portable electric welder |
Construction | Wall and Ceiling Linings | Cut Drywall using a drywall hand saw |
Construction | Wall and Ceiling Linings | Cut fibre cement sheet using an electric circular fibre cement saw |
Construction | Wall and Ceiling Linings | Cut hole into existing Drywall surface using a key hole Drywall saw |
Construction | Wall and Ceiling Linings | Cut plasterboard using a key hole plasterboard saw |
Construction | Wall and Ceiling Linings | Cut plasterboard using a plasterboard hand saw |
Construction | Wall and Ceiling Linings | Drywall finishing |
Construction | Wall and Ceiling Linings | Flushing to screws and joints in linings |
Construction | Wall and Ceiling Linings | Install fibre cement linings |
Construction | Wall and Ceiling Linings | Install fibre cement linings using a battery powered drill |
Construction | Wall and Ceiling Linings | Install suspended ceiling grid |
Construction | Wall and Ceiling Linings | Installation of drywall linings |
Construction | Wall and Ceiling Linings | Installation of insulation Batts to wall and ceiling framing |
Construction | Wall and Ceiling Linings | Installation of plasterboard linings |
Construction | Wall and Ceiling Linings | Installing Cement Sheet Cladding |
Construction | Wall and Ceiling Linings | Manufacture Steel Stud Wall Frames |
Construction | Wall and Ceiling Linings | Manufacture/ build Steel Stud Wall Frames on site |
Construction | Wall and Ceiling Linings | Sanding of finished drywall by hand |
Construction | Wall and Ceiling Linings | Sanding of flushed joints by hand |
Construction | Wall and Ceiling Linings | Sanding of flushed joints using an electric drywall / plasterboard sander |
Construction | Wall and Floor Tiling | Cut tiles using an angle grinder |
Construction | Wall and Floor Tiling | Grout tiles |
Construction | Wall and Floor Tiling | Laying floor tiles |
Construction | Wall and Floor Tiling | Laying wall tiles |
Construction | Wall and Floor Tiling | Mix adhesive in a bucket using an electric drill |
Construction | Wall and Floor Tiling | Mix grout in a bucket using an electric drill |
Construction | Wall and Floor Tiling | Mixing cement with a portable electric mixer |
Construction | Wall and Floor Tiling | Placing a cement screed |
Construction | Wall and Floor Tiling | Remove existing grout between tiles |
Construction | Wall and Floor Tiling | Wall and floor tiling to domestic residence |
Construction | Wall and Floor Tiling | Wash out bucket |
Construction | Windows and Doors | Cork joint with Polyurethane sealant |
Construction | Windows and Doors | Install aluminium door frame into existing masonry opening |
Construction | Windows and Doors | Install preassembled window frame into existing opening and screw fix |
Construction | Windows and Doors | Installation of Aluminium Doors and Door Hardware |
Construction | Windows and Doors | Installation of Wooden Doors and Door Hardware using battery powered tools |
Healthcare and Medical | Aged Care | Dealing with people with dementia or aggression |
Healthcare and Medical | Homecare | Assist client in and out of a chair |
Healthcare and Medical | Physiotherapy | In home Physiotherapy |
Hire and Rental | Hire and Rental | Delivery, cleaning and removal of portable toilets |
Horticulture | Arboriculture | Clearing and Grubbing Highway (complete job) |
Horticulture | Arboriculture | Climb Tree |
Horticulture | Arboriculture | Climb Tree to lop branches |
Horticulture | Arboriculture | Cut tree using a gasoline powered chainsaw |
Horticulture | Arboriculture | Cut tree using a petrol powered chainsaw |
Horticulture | Arboriculture | Cut tree using gasoline powered pole saw |
Horticulture | Arboriculture | Cut tree using petrol powered pole saw |
Horticulture | Arboriculture | Felling of tree from the ground - not requiring a climber |
Horticulture | Arboriculture | Felling of tree using Climbing Technique |
Horticulture | Arboriculture | Felling of tree using Climbing Technique and using wood chipper |
Horticulture | Arboriculture | Inspection and use of gasoline powered chainsaw |
Horticulture | Arboriculture | Inspection and use of petrol powered chainsaw |
Horticulture | Arboriculture | Load stump grinding machine onto trailer using aluminium ramps |
Horticulture | Arboriculture | Mulching of trees and branches using a Brush/ Wood Chipper |
Horticulture | Arboriculture | Mulching of trees and branches using a Brush/ Wood Chipper (extended version) |
Horticulture | Arboriculture | Put on Harness and set up ropes |
Horticulture | Arboriculture | Safety check and operation of Excavator for clearing and grubbing |
Horticulture | Arboriculture | Safety Inspection and use of Hydraulic Harvester Head attachment |
Horticulture | Arboriculture | Stump Grinding |
Horticulture | Arboriculture | Unload stump grinding machine from trailer using aluminium ramps |
Horticulture | Landscape Horticulture | Clear the area and move existing pot plants |
Horticulture | Landscape Horticulture | Pruning with Hand Pruners/ Shears (Secateurs) |
Horticulture | Landscape Horticulture | Safety Inspection and use of Horizontal Grinder |
Horticulture | Parks and Gardens | Carrying green waste by hand |
Horticulture | Parks and Gardens | Control of pedestrians through work area |
Horticulture | Parks and Gardens | Discovery of syringes or needles/ sharps |
Horticulture | Parks and Gardens | Herbicide Spraying by hand |
Horticulture | Parks and Gardens | Inspection and use of gasoline powered Brush cutter/ Grass Trimmer |
Horticulture | Parks and Gardens | Inspection and use of gasoline powered walk behind lawn mower |
Horticulture | Parks and Gardens | Inspection and use of petrol powered Brushcutter/ Grass Trimmer |
Horticulture | Parks and Gardens | Inspection and use of petrol powered walk behind lawn mower |
Horticulture | Parks and Gardens | Inspection and use of skid steer mounted slasher |
Horticulture | Parks and Gardens | Inspection and use of tractor mounted slasher |
Horticulture | Parks and Gardens | Load Tractor/ ride on lawnmower onto trailer using aluminium ramps |
Horticulture | Parks and Gardens | Loading ad dragging bags of waste to bin or vehicle |
Horticulture | Parks and Gardens | Mulching of garden waste using a gasoline powered mulcher |
Horticulture | Parks and Gardens | Mulching of garden waste using a petrol-powered mulcher |
Horticulture | Parks and Gardens | Prune branches using hand operated extendable pore pruner or pole saw |
Horticulture | Parks and Gardens | Spreading fertilizer and manure |
Horticulture | Parks and Gardens | Spreading mulch by bucketing and spreading with shovel and rake |
Horticulture | Parks and Gardens | Spreading soil with Shovel and Rake |
Horticulture | Parks and Gardens | Unload tractor/ ride on lawnmower from trailer using aluminium ramps |
Horticulture | Parks and Gardens | Working beneath large fig trees |
Horticulture | Parks and Gardens | Working on sloping/ steep ground |
Horticulture | Parks and Gardens | Working outside in the sun |
Horticulture | Parks and Gardens | Working with spikey plants |
Pest Control | Ant, Insect and spider control | Pesticide spraying by hand |
Pest Control | Feral animal control | Aerial Shooting and Baiting from helicopters |
Pest Control | Feral animal control | Automated corral trapping |
Pest Control | Feral animal control | Foot hold trapping |
Pest Control | Feral animal control | Ground Baiting using 1080 poison |
Pest Control | Feral animal control | Safety inspection and use of firearms for hunting |
Primary Industries | Livestock Grazing | Aerial Mustering |
Primary Industries | Livestock Grazing | Inspect and Drive Off Road Vehicle/ 4WD |
Primary Industries | Livestock Grazing | Inspection and use of Tractor |
Primary Industries | Livestock Grazing | Mustering using Off Road and 4WD vehicles |
Security | Security Patrols | Check and Lock down pool area |
Security | Security Patrols | Check Carpark |
Security | Security Patrols | Check exterior of premises |
Security | Security Patrols | Check Gymnasium |
Security | Security Patrols | Internal Patrols of Student Accommodation |
Security | Security Patrols | Patrol of Student Accommodation Facility |
Traffic Management | Traffic control | Establish a Safe Work Zone-Working on or adjacent road (Traffic Control) |
Traffic Management | Traffic control | Traffic control in night conditions |
Traffic Management | Traffic control | Traffic control station set up and operation of traffic control (Stop/ slow bat) |
Transport | Truck | Deliver materials to site and unload manually |
Transport | Truck | Delivery and unloading of mobile plant |
Transport | Truck | Driving long distances |
Transport | Truck | Inspect and drive truck |
Transport | Truck | Loading materials onto truck by hand |
Waste and resource recovery | Construction and Demolition | Changeover of skip bin |
Waste and resource recovery | Construction and Demolition | Delivery of skip bin |
Waste and resource recovery | Construction and Demolition | Pick up filled skip bin |
Waste and resource recovery | Liquid waste | Pump out domestic septic tank using a vacuum truck |
Waste and resource recovery | Liquid waste | Pump out grease trap tank using a vacuum truck |
Waste and resource recovery | Liquid waste | Pump out waste milk using a vacuum truck |
Waste and resource recovery | Liquid waste | Removal of liquid waste milk |
Waste and resource recovery | Sweepers | Inspection and use of industrial automatic ride on sweeper/scrubber |
Waste and resource recovery | Sweepers | Inspection and use of Truck Mounted Street Sweeper |