Cleaning Safe Work Method Statements (SWMS)
People often ask, “Can I have a Safe Work Method Statements (SWMS) for Cleaning?” “A document that covers everything?” The answer is not really.
A Safe Work Method Statements (SWMS) needs to document step by step how you are going to do a particular job. Not all jobs are the same! Are you going to clean a bathroom or polish a floor?
The steps in undertaking each of these tasks are very different. Not only are the steps different, but the potential hazards and the hazard control measures are very different as well.
Cleaning work involves various hazards due to the nature of the tasks.
- Chemical Exposure: Cleaning agents and chemicals used in the industry can pose health risks if not handled properly. Skin irritation, respiratory problems, and other health issues can arise from exposure to these substances.
- Slips, Trips, and Falls: Wet floors, spilled cleaning solutions, and cluttered work areas can contribute to slips, trips, and falls. This is a common hazard in the cleaning industry, and it’s important for workers to wear slip-resistant footwear and use warning signs.
- Musculoskeletal Injuries: Repetitive tasks, lifting heavy objects, and awkward postures can lead to musculoskeletal injuries. Workers may experience strains, sprains, or other ergonomic-related issues.
- Equipment Hazards: The use of cleaning equipment such as vacuum cleaners, floor buffers, and power washers can pose risks if not used properly. Inadequate training or malfunctioning equipment can lead to accidents.
- Biological Hazards: Cleaning areas with potential biological contaminants, such as mold, bacteria, or viruses, can expose workers to health risks. Proper personal protective equipment (PPE) and training are essential in dealing with biological hazards.
- Sharp Objects: Broken glass, sharp edges, or other objects can cause injuries if not handled carefully. Workers should be cautious when dealing with sharp objects and use appropriate protective gear.
- Noise Exposure: Some cleaning equipment, such as industrial vacuum cleaners or power washers, can generate high levels of noise. Prolonged exposure to loud noises can lead to hearing loss, so using hearing protection is important.
- Electrical Hazards: Working with electrical equipment, such as floor scrubbers or carpet cleaners, poses a risk of electric shock if not used properly or if equipment is faulty.
- Workplace Violence: Cleaning personnel may work alone or during off-hours, increasing the risk of encountering unsafe situations or potential violence. Employers should implement safety protocols and provide training to minimize these risks.
- Respiratory Hazards: Dust, particulate matter, or chemical fumes generated during cleaning activities can pose respiratory hazards. Proper ventilation and the use of respiratory protection may be necessary.
A SWMS provides a clear, step-by-step guide on how to perform a task safely.
Making SWMS has never been easier, just pick your job steps and the JSEAsy safety management software does all the hard work for you.
JSEAsy Environmental Health and Safety (EHS) Software
Process: Click the Links below to learn more about JSEAsy Safety Management Software and the process.
View an Infographic about How JSEAsy Software works.
See the different versions of the JSEAsy software.
When you buy or Rent JSEAsy you have access to all of the latest version SWMS templates, for all trades and industries.
Download the JSEAsy latest version SWMS template register.
This is a register sorted by industry type and industry specific of all of the SWMS templates included in the latest version of the JSEAsy Safety Management Software.
JSEA/ SWMS Example
Below is an example of templates you may insert into your site-specific SWMS for a job for cleaning an office and showroom.
- Site Orientation/ Induction
- Vacuum
- Sweeping Floor
- Remove bag from bins and wastepaper baskets
- Cleaning of hard surfaces
- Cleaning of Rest Rooms / Toilets
- Mopping Floor
- Inspection and use of walk behind battery powered floor scrubber
- Inspection and use of Low-Speed Electric Floor Buffer
- Clean Windows with mop and squeegee
- Monitoring and Review of SWMS
Automating the process
When you insert a template, it automatically brings with it:
- The main process step
- The sub process steps associated in undertaking the task
- The potential hazards associated with undertaking the task (you can also delete or add any of these with a simple click)
- The Risk Rating for undertaking the task (You can also change this if you want to)
- The Hazard Control measure (you can also delete or add any of these with a simple click)
- The revised risk rating after applying the control (You can also change this if you want to)
- Any required PPE (you can also delete or add any of these with a simple click)
- Any applicable licences or qualifications required (you can also delete or add any of these with a simple click)
- Any preoperational inspections required (you can also delete or add any of these with a simple click)
- Any applicable legislation or codes of practice (you can also delete or add any of these with a simple click)
Creating Site-Specific SWMS Reports with JSEAsy Safety Management Software
Creating a site-specific SWMS is easy using JSEAsy . Once created, you can print/ save a pdf of either a full or simplified SWMS report.
Download an example of a full SWMS report generated from the JSEAsy EHS Software.
Download an example of a simplified SWMS report generated from the JSEAsy EHS Software.
The JSEAsy software comes preloaded with hundreds of templates (job steps) to build your site-specific SWMS with.
Safe Operating Procedures (SOP) and Plant and Equipment Risk Assessments (PERA) are also included in all versions.
The JSEAsy Premium EHS Software is your total WHS management system.
The JSEAsy safety management software is available for download and install on a PC, or hosted in the cloud
Save time and Money!
Hundreds of templates included – 1 low price – Exceptional value!
When you buy or rent the JSEAsy Safety Software, not only to get all of the templates specifically for cleaning works but you also get all of the templates for all of the other industries and trades as well. Cleaning contractors don’t just clean!
You will also benefit from many of the templates for using scaffolds, Scissor lifts and boom lifts when working at heights.
A list of all the templates included in all versions of the JSEAsy EHS software is shown below.
- You can search by scrolling through the list of all templates.
- You can apply filters to the list by selecting an Industry Type
- You can further refine the list by selecting and industry type and an industry specific.
- You can do key word searches for templates. If you can’t find what you are looking for try:
- Shortening the search term. For example, searching for “deliv” would show deliver and deliveries, but if you searched for deliveries, it would exclude deliver.
- Look for a synonyms/ alternate word for what you are looking for. E.g. tube or pipe
No. | Description | Cost |
---|---|---|
1 | 1st fix carpentry to new 2 story dwelling using a Pneumatic and Impulse Nail Gun | Included in v4.5 |
2 | 1st fix carpentry to new dwelling using a Pneumatic and Impulse Nail Gun | Included in v4.5 |
3 | Abrasive blasting | Included in v4.5 |
4 | Accept load to vehicle from forklift (3rd Party operator) and Loading by hand | Included in v4.5 |
5 | Acceptance of delivery of concrete | Included in v4.5 |
6 | Acceptance of delivery to site for materials | Included in v4.5 |
7 | Acceptance of delivery to site for materials via Crane Truck | Included in v4.5 |
8 | Access ceiling space via Ladder | Included in v4.5 |
9 | Access roof via Boom Lift | Included in v4.5 |
10 | Access roof via fixed access ladder | Included in v4.5 |
11 | Access roof via Ladder | Included in v4.5 |
12 | Access Roof via scaffold stair access | Included in v4.5 |
13 | Access roof via Scissor Lift | Included in v4.5 |
14 | Access work area using a platform ladder | Included in v4.5 |
15 | Access work area using a step ladder | Included in v4.5 |
16 | Access work area using 'Hop-Up' trestle ladder/ work platform | Included in v4.5 |
17 | Access work area via a mobile scaffold | Included in v4.5 |
18 | Access work area via a scaffold/ working at heights from a scaffold | Included in v4.5 |
19 | Acid wash surface by hand | Included in v4.5 |
20 | Adjust hinges to joinery doors | Included in v4.5 |
21 | Aerial Mustering | Included in v4.5 |
22 | Aerial Shooting and Baiting from helicopters | Included in v4.5 |
23 | Apply construction adhesive using a calking gun | Included in v4.5 |
24 | Apply high strength repair mortar | Included in v4.5 |
25 | Apply silicone to joint | Included in v4.5 |
26 | Apply surface sealant material (Kahfill) to face of crack | Included in v4.5 |
27 | Apply touch up paint | Included in v4.5 |
28 | Arrive at domestic site with truck and establish unloading area | Included in v4.5 |
29 | Arrive at domestic site with truck and trailer and establish unloading area | Included in v4.5 |
30 | Assemble Frames and bolt together | Included in v4.5 |
31 | Assist client in and out of a chair | Included in v4.5 |
32 | Attach platform to wall bracket | Included in v4.5 |
33 | Automated corral trapping | Included in v4.5 |
34 | Back Fill trench by hand with original spoil | Included in v4.5 |
35 | Back Fill trench using excavator with original spoil | Included in v4.5 |
36 | Brick and Blocklaying Complete commercial job scaffold supplied by builder | Included in v4.5 |
37 | Bricklaying | Included in v4.5 |
38 | Bricklaying to new project home | Included in v4.5 |
39 | Build Steel Wall Frame and Bolt Wall Girths to Columns | Included in v4.5 |
40 | Build Wall Frame and Tek Screw Wall Girths to Columns | Included in v4.5 |
41 | Carpet Cleaning | Included in v4.5 |
42 | Carry blocks by hand | Included in v4.5 |
43 | Carry bricks using a mechanical brick carrier (Clamps) | Included in v4.5 |
44 | Carrying green waste by hand | Included in v4.5 |
45 | Carrying materials from storage area to work area | Included in v4.5 |
46 | Carrying mortar in a bucket to work area | Included in v4.5 |
47 | Carrying Window frames from storage area to work area | Included in v4.5 |
48 | Change Spark Plugs | Included in v4.5 |
49 | Changeover of skip bin | Included in v4.5 |
50 | Charging of Li-Ion batteries for use with cordless tools | Included in v4.5 |
51 | Check and Lock down pool area | Included in v4.5 |
52 | Check batteries and charging system | Included in v4.5 |
53 | Check Carpark | Included in v4.5 |
54 | Check exterior of premises | Included in v4.5 |
55 | Check Gymnasium | Included in v4.5 |
56 | Check system for gas leaks | Included in v4.5 |
57 | Chip out loose concrete/ cement or render with scabbling hammer | Included in v4.5 |
58 | Claim Work Area | Included in v4.5 |
59 | Claim work area on rail line | Included in v4.5 |
60 | Clean bathroom | Included in v4.5 |
61 | Clean Glass shower screen with a cloth | Included in v4.5 |
62 | Clean Glass with a cloth | Included in v4.5 |
63 | Clean masonry surface using an electric grinder and cup disc | Included in v4.5 |
64 | Clean mirror with a cloth | Included in v4.5 |
65 | Clean street and footpath | Included in v4.5 |
66 | Clean trenches and setting grade by hand | Included in v4.5 |
67 | Clean up site by hand using a wheel barrow to transfer debris to bin | Included in v4.5 |
68 | Clean Window Using Pure Water Technology | Included in v4.5 |
69 | Clean Windows Using rope Access | Included in v4.5 |
70 | Clean Windows with mop and squeegee | Included in v4.5 |
71 | Cleaning of hard surfaces | Included in v4.5 |
72 | Cleaning of office and showroom | Included in v4.5 |
73 | Cleaning of residence | Included in v4.5 |
74 | Cleaning of Rest Rooms / Toilets | Included in v4.5 |
75 | Cleaning steel using a battery powered grinder with a wire brush attachment | Included in v4.5 |
76 | Cleaning steel using an electric grinder with a wire brush attachment | Included in v4.5 |
77 | Cleaning up work area | Included in v4.5 |
78 | Cleanout gutter by hand | Included in v4.5 |
79 | Clear the area and move existing pot plants | Included in v4.5 |
80 | Clearing a blocked drain using an Electric Eel Drain Snake | Included in v4.5 |
81 | Clearing and Grubbing Highway (complete job) | Included in v4.5 |
82 | Climb Tree | Included in v4.5 |
83 | Climb Tree to lop branches | Included in v4.5 |
84 | Commercial drainage and hot & cold water reticulation (complete plumbing job 1 ) | Included in v4.5 |
85 | Compact area using a gasoline powered leg rammer | Included in v4.5 |
86 | Compact area using a gasoline powered vibrating plate | Included in v4.5 |
87 | Compact area using a petrol powered leg rammer | Included in v4.5 |
88 | Compact area using a petrol powered vibrating plate | Included in v4.5 |
89 | Compact area with Road roller (roller-compactor) | Included in v4.5 |
90 | Concrete and reinforcement repairs | Included in v4.5 |
91 | Concrete crack repair and injection | Included in v4.5 |
92 | Concrete Delivery and Pumping | Included in v4.5 |
93 | Concrete filling of blockwork by bucket | Included in v4.5 |
94 | Concrete filling of Columns by bucket | Included in v4.5 |
95 | Connect hose to existing water supply tap | Included in v4.5 |
96 | Connect new cables into electrical plant/ equipment | Included in v4.5 |
97 | Connect new cables into existing fire panel | Included in v4.5 |
98 | Connect new cables into existing switchboard | Included in v4.5 |
99 | Connect pipes together using a flexible connector | Included in v4.5 |
100 | Connect sewer drain to government connection | Included in v4.5 |
101 | Connect temporary power supply and test operation of hoist | Included in v4.5 |
102 | Connect water inlet and outlet | Included in v4.5 |
103 | Construction Site Establishment and Project Risk Assessment | Included in v4.5 |
104 | Control of pedestrians through work area | Included in v4.5 |
105 | Core hole through masonry wall with a battery powered rotary hammer drill | Included in v4.5 |
106 | Coring concrete | Included in v4.5 |
107 | Cork joint with Polyurethane sealant | Included in v4.5 |
108 | Crane Set Up | Included in v4.5 |
109 | Create temporary work bench using trestles and planks | Included in v4.5 |
110 | Creating Roof Penetrations | Included in v4.5 |
111 | Cut aluminium angles using a hacksaw and mitre box | Included in v4.5 |
112 | Cut aluminium sections using an electric mitre saw | Included in v4.5 |
113 | Cut bricks using a gasoline powered brick saw | Included in v4.5 |
114 | Cut bricks using a petrol powered brick saw | Included in v4.5 |
115 | Cut bricks using an angle grinder | Included in v4.5 |
116 | Cut copper pipe with tube cutter | Included in v4.5 |
117 | Cut down UPVC risers using a battery powered angle grinder | Included in v4.5 |
118 | Cut down UPVC risers using an angle grinder | Included in v4.5 |
119 | Cut Drywall using a drywall hand saw | Included in v4.5 |
120 | Cut fence sheets with electric shears | Included in v4.5 |
121 | Cut fibre cement sheet using an electric circular fibre cement saw | Included in v4.5 |
122 | Cut fibre cement sheeting using electric shears | Included in v4.5 |
123 | Cut fibre cement sheeting using hand operated mechanical shears | Included in v4.5 |
124 | Cut Hebel/ Autoclaved Aerated Concrete with a diamond blade circular saw | Included in v4.5 |
125 | Cut hole into existing Drywall surface using a key hole Drywall saw | Included in v4.5 |
126 | Cut hole into existing plasterboard ceiling using a key hole plasterboard saw | Included in v4.5 |
127 | Cut Insulated Panel with a circular saw | Included in v4.5 |
128 | Cut into existing earthenware branch using and angle grinder | Included in v4.5 |
129 | Cut masonry wall with a Quick Cut Diamond blade saw | Included in v4.5 |
130 | Cut materials using an electric mitre saw | Included in v4.5 |
131 | Cut metal roof sheets with battery powered shears | Included in v4.5 |
132 | Cut metal roof sheets with electric shears | Included in v4.5 |
133 | Cut metal wall sheets with battery powered shears | Included in v4.5 |
134 | Cut plasterboard using a key hole plasterboard saw | Included in v4.5 |
135 | Cut plasterboard using a plasterboard hand saw | Included in v4.5 |
136 | Cut steel reinforcing using bolt cutters | Included in v4.5 |
137 | Cut steel using a battery powered angle grinder | Included in v4.5 |
138 | Cut steel using a reciprocating saw | Included in v4.5 |
139 | Cut Steel using an Angle Grinder | Included in v4.5 |
140 | Cut Steel/ Unistrut with drop saw | Included in v4.5 |
141 | Cut strapping off around pack of materials | Included in v4.5 |
142 | Cut tiles using an angle grinder | Included in v4.5 |
143 | Cut timber beading using a hand saw and mitre box | Included in v4.5 |
144 | Cut timber to size using a table saw | Included in v4.5 |
145 | Cut timber using a battery powered circular saw | Included in v4.5 |
146 | Cut timber using a battery powered reciprocating saw | Included in v4.5 |
147 | Cut timber using a circular saw | Included in v4.5 |
148 | Cut timber using a jigsaw | Included in v4.5 |
149 | Cut timber using a reciprocating saw | Included in v4.5 |
150 | Cut timber using an electric mitre saw | Included in v4.5 |
151 | Cut tree using a gasoline powered chainsaw | Included in v4.5 |
152 | Cut tree using a petrol powered chainsaw | Included in v4.5 |
153 | Cut tree using gasoline powered pole saw | Included in v4.5 |
154 | Cut tree using petrol powered pole saw | Included in v4.5 |
155 | Cut wood beading using a hand saw and mitre box | Included in v4.5 |
156 | Cut wood to size using a table saw | Included in v4.5 |
157 | Cut wood using a battery powered circular saw | Included in v4.5 |
158 | Cut wood using a battery powered reciprocating saw | Included in v4.5 |
159 | Cut wood using a circular saw | Included in v4.5 |
160 | Cut wood using a reciprocating saw | Included in v4.5 |
161 | Cut wood using an electric jigsaw | Included in v4.5 |
162 | Cut wood using an electric mitre saw | Included in v4.5 |
163 | Cutting Bitumen with a Quick Cut Diamond blade saw | Included in v4.5 |
164 | Cutting Concrete with a Quick Cut Diamond blade saw | Included in v4.5 |
165 | Cutting material with a box cutter/ utility knife/ snap blade knife/ sharp tool | Included in v4.5 |
166 | Cutting Roof Sheets with snips | Included in v4.5 |
167 | Cutting Steel with an Oxy- Torch | Included in v4.5 |
168 | Daily preoperational inspection of a Pneumatic (Air) Nail Gun | Included in v4.5 |
169 | Daily preoperational inspection of a Pneumatic Jack Hammer | Included in v4.5 |
170 | Daily preoperational inspection of an Impulse (gas) Nail Gun | Included in v4.5 |
171 | Dealing with people with dementia or aggression | Included in v4.5 |
172 | Decontamination of Plant | Included in v4.5 |
173 | Deliver materials to site and unload manually | Included in v4.5 |
174 | Delivery and installation of temporary fencing | Included in v4.5 |
175 | Delivery and unloading of mobile plant | Included in v4.5 |
176 | Delivery of skip bin | Included in v4.5 |
177 | Delivery | cleaning and removal of portable toilets |
178 | Delivery | Safety Check And Use Of Dingo |
179 | Demolition of cupboards and built in robes | Included in v4.5 |
180 | Demolition of existing Drywall lined partition stud wall | Included in v4.5 |
181 | Demolition of existing flush jointed plasterboard ceiling | Included in v4.5 |
182 | Demolition of existing plasterboard lined partition stud wall | Included in v4.5 |
183 | Demolition/ removal of bathroom fixtures and fittings | Included in v4.5 |
184 | Demolition/ Removal of existing carpet and undelay | Included in v4.5 |
185 | Demolition/ removal of existing ceiling tiles | Included in v4.5 |
186 | Demolition/ removal of existing Compactus shelving unit | Included in v4.5 |
187 | Demolition/ Removal of existing insulated panel cool room/ freezer by hand | Included in v4.5 |
188 | Demolition/ removal of existing joinery | Included in v4.5 |
189 | Demolition/ removal of existing suspended exposed grid ceiling | Included in v4.5 |
190 | Demolition/ Removal of existing vinyl flooring | Included in v4.5 |
191 | Demolition/ Removal of existing wall and floor tiles using an electric jack hammer | Included in v4.5 |
192 | Demolition/ Removal of timber planking by hand | Included in v4.5 |
193 | Dig Hole by hand | Included in v4.5 |
194 | Dig hole with power driven auger | Included in v4.5 |
195 | Dig Trench by hand | Included in v4.5 |
196 | Dig trench using a chain trencher | Included in v4.5 |
197 | Disconnect electrical from existing plant | Included in v4.5 |
198 | Disconnect pipework form existing plant | Included in v4.5 |
199 | Discovery of syringes or needles/ sharps | Included in v4.5 |
200 | Dismantling of Pallet Racking | Included in v4.5 |
201 | Drain water system | Included in v4.5 |
202 | Drill hole into existing concrete slab with an electric rotary hammer drill | Included in v4.5 |
203 | Drill hole into masonry surface with a battery powered rotary hammer drill | Included in v4.5 |
204 | Drill hole into masonry surface with an electric rotary hammer drill | Included in v4.5 |
205 | Drill hole using a Battery Powered Drill | Included in v4.5 |
206 | Drill hole using a magnetic drill | Included in v4.5 |
207 | Drill hole using an electric drill | Included in v4.5 |
208 | Drill Wall Girths and Purlins with an electric drill | Included in v4.5 |
209 | Drive piles with a crane lifted Vibro hammer vibrating hammer pile driver | Included in v4.5 |
210 | Driving in and out of carparks and on customer premises | Included in v4.5 |
211 | Driving long distances | Included in v4.5 |
212 | Drywall finishing | Included in v4.5 |
213 | Dumping/Unloading load on ground using a tip truck/ dump truck | Included in v4.5 |
214 | Ease/ adjust existing doors | Included in v4.5 |
215 | Electro-Fusion Welding of MDPE of HDPE pipe | Included in v4.5 |
216 | Enter asbestos removal area through the Decontamination Unit | Included in v4.5 |
217 | Erecting | Altering and Dismantling Prefabricated Steel Modular Scaffolding |
218 | Erection and use of a steel tube scaffold | Included in v4.5 |
219 | Erection and use of aluminium tube scaffold | Included in v4.5 |
220 | Erection and use of mobile scaffold | Included in v4.5 |
221 | Erection and Use of Mobile Scaffold (Extended Version) | Included in v4.5 |
222 | Establish a Safe Work Zone-Working on or adjacent road (Traffic Control) | Included in v4.5 |
223 | Exit asbestos removal area through the Decontamination Unit | Included in v4.5 |
224 | Felling of tree from the ground - not requiring a climber | Included in v4.5 |
225 | Felling of tree using Climbing Technique | Included in v4.5 |
226 | Felling of tree using Climbing Technique and using wood chipper | Included in v4.5 |
227 | Fill holes and imperfections | Included in v4.5 |
228 | Fill out and issue Electrical Certificate of Compliance | Included in v4.5 |
229 | Filling & testing of pipework | Included in v4.5 |
230 | Final connections and commissioning of lift | Included in v4.5 |
231 | Finishing concrete with gasoline powered trowel (Helicopter) | Included in v4.5 |
232 | Finishing concrete with petrol powered trowel (Helicopter) | Included in v4.5 |
233 | Fit Ts and connectors to plastic pipes | Included in v4.5 |
234 | Fit angles and trims using a battery powered drill and pop rivets | Included in v4.5 |
235 | Fit cover plates and mini cocks to outlets | Included in v4.5 |
236 | Fit Pipe insulation over pipes | Included in v4.5 |
237 | Fit power outlet to drywall | Included in v4.5 |
238 | Fit power point to plasterboard wall | Included in v4.5 |
239 | Fit speakers and detectors to drywall ceiling | Included in v4.5 |
240 | Fit speakers and detectors to plasterboard ceiling | Included in v4.5 |
241 | Fit switch to drywall | Included in v4.5 |
242 | Fit switch to plasterboard wall | Included in v4.5 |
243 | Fit Tapware/ mixers | Included in v4.5 |
244 | Fit Unistrut brackets onto masonry wall | Included in v4.5 |
245 | Fix aluminium channels to existing slab using battery powered hammer drill | Included in v4.5 |
246 | Fix fibre cement cladding sheet in place and nail by hand | Included in v4.5 |
247 | Fix fibre cement soffit/ eaves sheet in place and nail by hand | Included in v4.5 |
248 | Flushing to screws and joints in linings | Included in v4.5 |
249 | Foot hold trapping | Included in v4.5 |
250 | Form and Flash Roof Penetrations | Included in v4.5 |
251 | Gain access to work are using Rope Access | Included in v4.5 |
252 | Glue jointing closed cell elastomeric pipe insulation | Included in v4.5 |
253 | Grease moving parts and greaseable joints | Included in v4.5 |
254 | Grinding/ Polishing bench tops with a handheld grinder | Included in v4.5 |
255 | Ground Baiting using 1080 poison | Included in v4.5 |
256 | Grout Columns | Included in v4.5 |
257 | Grout tiles | Included in v4.5 |
258 | Hang condensing unit onto masonry wall | Included in v4.5 |
259 | Hang Fan cooler unit inside cool room | Included in v4.5 |
260 | Herbicide Spraying by hand | Included in v4.5 |
261 | High Risk Construction Work covered in this SWMS | Included in v4.5 |
262 | In home Physiotherapy | Included in v4.5 |
263 | Industrial rope access | Included in v4.5 |
264 | Inform facilities / operations and security personnel of work location(s) | Included in v4.5 |
265 | Inject Epoxy into holes | Included in v4.5 |
266 | Injection of Nitofill LV epoxy resin | Included in v4.5 |
267 | Inspect and certify the anchor point installation | Included in v4.5 |
268 | Inspect and certify the static line installation | Included in v4.5 |
269 | Inspect and Drive Off Road Vehicle/ 4WD | Included in v4.5 |
270 | Inspect and drive passenger/ light commercial vehicle | Included in v4.5 |
271 | Inspect and drive passenger/ light commercial vehicle on or off site | Included in v4.5 |
272 | Inspect and drive Tip Truck/ Dump Truck | Included in v4.5 |
273 | Inspect and drive truck | Included in v4.5 |
274 | Inspect/ Repair skirts and scrubber or sweeping brushes | Included in v4.5 |
275 | Inspection and use of a gasoline powered air compressor | Included in v4.5 |
276 | Inspection and use of Carpet Extractor | Included in v4.5 |
277 | Inspection and use of Diamond Floor Grinder | Included in v4.5 |
278 | Inspection and use of diesel powered air compressor | Included in v4.5 |
279 | Inspection and use of electric air compressor | Included in v4.5 |
280 | Inspection and use of electric high pressure water sprayer | Included in v4.5 |
281 | Inspection and use of Four Post Vehicle Hoist | Included in v4.5 |
282 | Inspection and use of gasoline powered blower/ vacuum | Included in v4.5 |
283 | Inspection and use of gasoline powered Brush cutter/ Grass Trimmer | Included in v4.5 |
284 | Inspection and use of gasoline powered chainsaw | Included in v4.5 |
285 | Inspection and use of gasoline powered high pressure water sprayer | Included in v4.5 |
286 | Inspection and use of gasoline powered walk behind lawn mower | Included in v4.5 |
287 | Inspection and use of Generator | Included in v4.5 |
288 | Inspection and use of High-Speed Propane (LPG) Powered Floor Buffer (Burnisher) | Included in v4.5 |
289 | Inspection and use of industrial automatic ride on sweeper/scrubber | Included in v4.5 |
290 | Inspection and use of Low-Speed Electric Floor Buffer | Included in v4.5 |
291 | Inspection and use of Motor Grader/ Road Grader | Included in v4.5 |
292 | Inspection and use of petrol powered air compressor | Included in v4.5 |
293 | Inspection and use of petrol powered blower/ vacuum | Included in v4.5 |
294 | Inspection and use of petrol powered Brush cutter/ Grass Trimmer | Included in v4.5 |
295 | Inspection and use of petrol powered chainsaw | Included in v4.5 |
296 | Inspection and use of petrol powered high pressure water sprayer | Included in v4.5 |
297 | Inspection and use of petrol powered walk behind lawn mower | Included in v4.5 |
298 | Inspection and use of planetary floor polisher | Included in v4.5 |
299 | Inspection and use of skid steer mounted slasher | Included in v4.5 |
300 | Inspection and use of tender vessel | Included in v4.5 |
301 | Inspection and use of the vessel mounted crane | Included in v4.5 |
302 | Inspection and use of the vessel mounted forklift | Included in v4.5 |
303 | Inspection and use of Tractor | Included in v4.5 |
304 | Inspection and use of tractor mounted slasher | Included in v4.5 |
305 | Inspection and use of Truck Mounted Street Sweeper | Included in v4.5 |
306 | Inspection and use of Two Post Vehicle Hoist | Included in v4.5 |
307 | Inspection and use of walk behind battery powered floor scrubber | Included in v4.5 |
308 | Install wall mounted cupboards to stud wall | Included in v4.5 |
309 | Install Bondek or Similar formwork to structure Using an Explosive Power Tool | Included in v4.5 |
310 | Install STRUCTAflor particle board flooring | Included in v4.5 |
311 | Install Acro prop | Included in v4.5 |
312 | Install Aluminium deflection head and sub sill | Included in v4.5 |
313 | Install aluminium door frame into existing masonry opening | Included in v4.5 |
314 | Install aluminium skirting | Included in v4.5 |
315 | Install anchor points into existing concrete slab | Included in v4.5 |
316 | Install backflow prevention valve | Included in v4.5 |
317 | Install bearers and joists to formwork support frames | Included in v4.5 |
318 | Install Box Gutter with saddles straps and gutter board | Included in v4.5 |
319 | Install Carpet and underlay to a concrete floor | Included in v4.5 |
320 | Install Carpet and underlay to a timber floor | Included in v4.5 |
321 | Install Carpet and underlay to a wood floor | Included in v4.5 |
322 | Install ceiling joist | Hanging beams |
323 | Install ceiling registers | Included in v4.5 |
324 | Install chainmesh fencing | Included in v4.5 |
325 | Install cistern and flush pipe | Included in v4.5 |
326 | Install connecting bolts and tension nuts using a battery powered rattle gun | Included in v4.5 |
327 | Install cupboards | Included in v4.5 |
328 | Install damp proof membrane (Forticon plastic) | Included in v4.5 |
329 | Install damp proof membrane to trimmers/noggings prior to brass fittings | Included in v4.5 |
330 | Install dishwasher | Included in v4.5 |
331 | Install Drive Motor to Platform Frame | Included in v4.5 |
332 | Install electric storage hot water service (HWS) | Included in v4.5 |
333 | Install end safety rails to Retractable platforms | Included in v4.5 |
334 | Install fibre cement linings | Included in v4.5 |
335 | Install fibre cement linings using a battery powered drill | Included in v4.5 |
336 | Install flexi ductwork and zone motors in ceiling space | Included in v4.5 |
337 | Install gas instantaneous hot water service (HWS) | Included in v4.5 |
338 | Install glass into frame | Included in v4.5 |
339 | Install hand basins | Included in v4.5 |
340 | Install handrails to platform | Included in v4.5 |
341 | Install Hebel Panel | Included in v4.5 |
342 | Install hoist motor | Included in v4.5 |
343 | Install Horizontal Life line fixed to masonry wall | Included in v4.5 |
344 | Install Horizontal Life line fixed to overhead concrete | Included in v4.5 |
345 | Install Horizontal Life line fixed to overhead structural steel | Included in v4.5 |
346 | Install Horizontal Life line surface mounted to metal roof sheeting | Included in v4.5 |
347 | Install horizontal racking beams from a scissor lift | Included in v4.5 |
348 | Install horizontal racking beams from ground | Included in v4.5 |
349 | Install hot and cold water fist fix plumbing (Steel framed) | Included in v4.5 |
350 | Install hot and cold water fist fix plumbing (Timber framed) | Included in v4.5 |
351 | Install hot and cold water fist fix plumbing (Wood framed) | Included in v4.5 |
352 | Install insulated ceiling panels to cool room | Included in v4.5 |
353 | Install Inverter | Included in v4.5 |
354 | Install irrigation poly pipe and fittings | Included in v4.5 |
355 | Install isolator | Included in v4.5 |
356 | Install Kick plate | Included in v4.5 |
357 | Install louvre blades into mullion/ blade carriers | Included in v4.5 |
358 | Install louvre doors into existing masonry opening | Included in v4.5 |
359 | Install louvre mullions to existing steel girths using a battery powered drill | Included in v4.5 |
360 | Install modular access ladder to structural wall girts behind wall cladding | Included in v4.5 |
361 | Install modular access ladders to existing masonry wall | Included in v4.5 |
362 | Install Mounting brackets and rails to roof | Included in v4.5 |
363 | Install new wall mounted unit | Included in v4.5 |
364 | Install Pierced Fixed Roof Sheets using a battery powered drill | Included in v4.5 |
365 | Install plywood flooring | Included in v4.5 |
366 | Install plywood formwork to support framing | Included in v4.5 |
367 | Install posts | Included in v4.5 |
368 | Install pre laminated bench top | Included in v4.5 |
369 | Install preassembled window frame into existing opening and screw fix | Included in v4.5 |
370 | Install prefabricated steel counter frames | Included in v4.5 |
371 | Install Pull down attic ladder into drywall ceiling and steel framing | Included in v4.5 |
372 | Install Pull down attic ladder into drywall ceiling and wood framing | Included in v4.5 |
373 | Install Pull down attic ladder into plasterboard ceiling and steel framing | Included in v4.5 |
374 | Install Pull down attic ladder into plasterboard ceiling and timber framing | Included in v4.5 |
375 | Install Pull down attic ladder into suspended exposed grid ceiling | Included in v4.5 |
376 | Install rafter mounted anchor points to a tiled roof | Included in v4.5 |
377 | Install Rafter Mounted anchor points to tiled roof without edge protection | Included in v4.5 |
378 | Install roof access hatch into a metal roof | Included in v4.5 |
379 | Install Safety Anchors to an existing roof (Timber from above and below) | Included in v4.5 |
380 | Install Safety Anchors to an existing roof (wood from above and below) | Included in v4.5 |
381 | Install screws using a Battery Powered Drill | Included in v4.5 |
382 | Install screws using a Tek gun | Included in v4.5 |
383 | Install sinks/ troughs | Included in v4.5 |
384 | Install solar panels onto the mounting frame | Included in v4.5 |
385 | Install solid strip timber flooring (Secret Fix) to timber subfloor | Included in v4.5 |
386 | Install solid strip wood flooring (Secret Fix) to wood subfloor | Included in v4.5 |
387 | Install staircase assembly using a forklift and lifting jib | Included in v4.5 |
388 | Install star pickets using a hammer and Star Post Dropper | Included in v4.5 |
389 | Install Stone Sheeting | Included in v4.5 |
390 | Install Stopcock valve | Included in v4.5 |
391 | Install Surface Mounted anchor points to metal roof | Included in v4.5 |
392 | Install Surface Mounted anchor points to metal roof without edge protection | Included in v4.5 |
393 | Install suspended ceiling grid | Included in v4.5 |
394 | Install suspended fire pipework to underside of concrete slab | Included in v4.5 |
395 | Install suspended fire pipework to underside of roof purlins | Included in v4.5 |
396 | Install suspended pipework to underside of concrete slab | Included in v4.5 |
397 | Install suspended pipework to underside of roof purlins | Included in v4.5 |
398 | Install temporary caps to fixtures | Included in v4.5 |
399 | Install Temporary Edge Protection | Included in v4.5 |
400 | Install Temporary Edge Protection from an EWP | Included in v4.5 |
401 | Install timber roof trusses by hand | Included in v4.5 |
402 | Install timber wall linings | Included in v4.5 |
403 | Install timber wall linings using a battery powered drill | Included in v4.5 |
404 | Install toilet (WC Pan) | Included in v4.5 |
405 | Install top hats to steel structure | Included in v4.5 |
406 | Install trimmers/ nogging to steel framing | Included in v4.5 |
407 | Install trimmers/ noggings to timber framing | Included in v4.5 |
408 | Install trimmers/ noggings to wood framing | Included in v4.5 |
409 | Install TX Valve | Included in v4.5 |
410 | Install variable pitch roof ventilators to metal roof | Included in v4.5 |
411 | Install vinyl skirting | Included in v4.5 |
412 | Install vinyl floors | Included in v4.5 |
413 | Install W45 Brass male lugged elbows | breaching pieces and mixers to steel frame |
414 | Install window frames into deflection head and sub sill | Included in v4.5 |
415 | Install wood roof trusses by hand | Included in v4.5 |
416 | Install wood wall linings using a battery powered drill | Included in v4.5 |
417 | Install Zip Auto boil | Included in v4.5 |
418 | Installation of Air-Cell Insulation | Included in v4.5 |
419 | Installation of Aluminium Doors and Door Hardware | Included in v4.5 |
420 | Installation of Anchor points to existing roof | Included in v4.5 |
421 | Installation of Ball Tube Handrail | Included in v4.5 |
422 | Installation of baths | Included in v4.5 |
423 | Installation of cable tray | Included in v4.5 |
424 | Installation of Cable Tray Covers | Included in v4.5 |
425 | Installation of cantilever racking | Included in v4.5 |
426 | Installation of cantilevered K-Stage Modular Steel Scaffold | Included in v4.5 |
427 | Installation of catenary cable | Included in v4.5 |
428 | Installation of Chair Modules | Included in v4.5 |
429 | Installation of Chem Anchors onto existing masonry surface | Included in v4.5 |
430 | Installation of Chem Anchors onto existing masonry wall | Included in v4.5 |
431 | Installation of Columns - Using a Crane | Included in v4.5 |
432 | Installation of Columns by hand | Included in v4.5 |
433 | Installation of concealed clip roof decking | Included in v4.5 |
434 | Installation of Cool Room | Included in v4.5 |
435 | Installation of Doors and Door Hardware | Included in v4.5 |
436 | Installation of Downpipes | Included in v4.5 |
437 | Installation of drywall linings | Included in v4.5 |
438 | Installation of ducted system air conditioner | Included in v4.5 |
439 | Installation of Dynabolts | Included in v4.5 |
440 | Installation of Eaves Gutters | Included in v4.5 |
441 | Installation of eaves linings to new domestic residence | Included in v4.5 |
442 | Installation of fascia cladding - From a scaffold | Included in v4.5 |
443 | Installation of fascia cladding - From a scissor lift | Included in v4.5 |
444 | Installation of fixed stadium seating (complete Job) | Included in v4.5 |
445 | Installation of fixing brackets to concrete | Included in v4.5 |
446 | Installation of Flashings using a battery powered drill | Included in v4.5 |
447 | Installation of Floor Grating | Included in v4.5 |
448 | Installation of floor joist | Included in v4.5 |
449 | Installation of formwork support frames | Included in v4.5 |
450 | Installation of four post vehicle hoist | Included in v4.5 |
451 | Installation of four post vehicle hoist (complete job including pick up and del) | Included in v4.5 |
452 | Installation of Garage (Domestic Shed) complete job | Included in v4.5 |
453 | Installation of Gas storage hot water system (HWS) | Included in v4.5 |
454 | Installation of Girts - Using an EWP | Included in v4.5 |
455 | Installation of Glazed aluminium partitions | Included in v4.5 |
456 | Installation of Hold Down bolts into existing Concrete | Included in v4.5 |
457 | Installation of Horizontal Sunshade Panels into position by hand | Included in v4.5 |
458 | Installation of insulation Batts to wall and ceiling framing | Included in v4.5 |
459 | Installation of insulation to roof | Included in v4.5 |
460 | Installation of insulation to walls | Included in v4.5 |
461 | Installation of K-Stage Modular Steel Scaffold | Included in v4.5 |
462 | Installation of lintel by hand | Included in v4.5 |
463 | Installation of lintel using a skid steer loader | Included in v4.5 |
464 | Installation of Longspan shelving | Included in v4.5 |
465 | Installation of louvre members - Using a boom lift | Included in v4.5 |
466 | Installation of mechanical masonry anchors | Included in v4.5 |
467 | Installation of metal battens | Included in v4.5 |
468 | Installation of metal Fascia | Included in v4.5 |
469 | Installation of Metal Fascias from ladder | Included in v4.5 |
470 | Installation of new kitchen joinery | Included in v4.5 |
471 | Installation of new refrigeration System to new supermarket (complete job) | Included in v4.5 |
472 | Installation of Pallet Racking | Included in v4.5 |
473 | Installation of Pallet Racking (complete job) | Included in v4.5 |
474 | Installation of Panel fencing | Included in v4.5 |
475 | Installation of plasterboard linings | Included in v4.5 |
476 | Installation of Plywood Decks | Included in v4.5 |
477 | Installation of post and rail metal clad fencing | Included in v4.5 |
478 | Installation of Rain Water Head | Included in v4.5 |
479 | Installation of refrigeration system to cool room | Included in v4.5 |
480 | Installation of retractable stadium seating | Included in v4.5 |
481 | Installation of Roller Door (domestic) | Included in v4.5 |
482 | Installation of Roof Purlins - Using a Crane | Included in v4.5 |
483 | Installation of Roof Sheets To Sprung Curved Roof | Included in v4.5 |
484 | Installation of roof vents | Included in v4.5 |
485 | Installation of Roof walkway | Included in v4.5 |
486 | Installation of Safety Mesh from Roof | Included in v4.5 |
487 | Installation of Safety Mesh to roof area - From EWP | Included in v4.5 |
488 | Installation of Safety Mesh to roof area - From Scaffold | Included in v4.5 |
489 | Installation of Safety Mesh to Roof From Roof and Scissor Lift on one side | Included in v4.5 |
490 | Installation of scissor lift vehicle hoist (complete job including pick up and del) | Included in v4.5 |
491 | Installation of simple formwork | Included in v4.5 |
492 | Installation of Soffit Sheeting - From EWP | Included in v4.5 |
493 | Installation of Soffit Sheeting - From Scaffold | Included in v4.5 |
494 | Installation of Solar System to Domestic Dwelling | Included in v4.5 |
495 | Installation of Static line system | Included in v4.5 |
496 | Installation of Static Shelving | Included in v4.5 |
497 | Installation of Steel Members - Using an EWP | Included in v4.5 |
498 | Installation of Steel Bracing Members - Using an EWP | Included in v4.5 |
499 | Installation of steel cable | Included in v4.5 |
500 | Installation of Steel Members - Using a Crane | Included in v4.5 |
501 | Installation of Steel members by hand | Included in v4.5 |
502 | Installation of Steel Portal Roof Trusses by hand | Included in v4.5 |
503 | Installation of Steel Roof Purlins by hand | Included in v4.5 |
504 | Installation of Steel Wall Girths by hand | Included in v4.5 |
505 | Installation of Stock Picking Racking | Included in v4.5 |
506 | Installation of subsurface irrigation system | Included in v4.5 |
507 | Installation of support angles or channels to hanging rods | Included in v4.5 |
508 | Installation of Support Mesh to walls - Using Scissor Lift | Included in v4.5 |
509 | Installation of Synthetic Turf | Included in v4.5 |
510 | Installation of temporary fencing | Included in v4.5 |
511 | Installation of Temporary Height Safety System - Starting from Platform Ladder | Included in v4.5 |
512 | Installation of Temporary Height Safety System - starting from Scissor | Included in v4.5 |
513 | Installation of Temporary Height Safety System - to Existing roof from Scaffold | Included in v4.5 |
514 | Installation of Temporary Height Safety System to new roof | Included in v4.5 |
515 | Installation of Temporary Static Line | Included in v4.5 |
516 | Installation of threaded rod hanging bars | Included in v4.5 |
517 | Installation of Timber Purlins | Included in v4.5 |
518 | Installation of top hats to masonry wall | Included in v4.5 |
519 | Installation of two post vehicle hoist | Included in v4.5 |
520 | Installation of two post vehicle hoist (complete job including pick up and del) | Included in v4.5 |
521 | Installation of underfloor plumbing and drains | Included in v4.5 |
522 | Installation of underfloor refrigeration pipework | Included in v4.5 |
523 | Installation of UPVC Pipe | Included in v4.5 |
524 | Installation of vent ridge | Included in v4.5 |
525 | Installation of viscourse | Included in v4.5 |
526 | Installation of wall hung split system air conditioner | Included in v4.5 |
527 | Installation of Wall plate by Hand | Included in v4.5 |
528 | Installation of wall sheeting from Ground | Included in v4.5 |
529 | Installation of wall sheeting from Ground and Boom Lift | Included in v4.5 |
530 | Installation of wall sheeting from Ground and Scaffold | Included in v4.5 |
531 | Installation of wall sheeting from Ground and Scissor Lift | Included in v4.5 |
532 | Installation of Wooden Doors and Door Hardware using battery powered tools | Included in v4.5 |
533 | Installing Bolts through existing concrete slab | Included in v4.5 |
534 | Installing Cement Sheet Cladding | Included in v4.5 |
535 | Installing External/ Internal Downpipes | Included in v4.5 |
536 | Installing Rain Water Heads | Included in v4.5 |
537 | Installing Roof Sheets to Flat Roof Area | Included in v4.5 |
538 | Internal Patrols of Student Accommodation | Included in v4.5 |
539 | Isolate power to existing system | Included in v4.5 |
540 | Isolate water to premises | Included in v4.5 |
541 | Jack up vehicle/machine | Included in v4.5 |
542 | Jimmy/ prise fixtures away from wall | Included in v4.5 |
543 | Joint Caulking | Included in v4.5 |
544 | Knock out brick s using a hammer | Included in v4.5 |
545 | Land Column into position with Crane | Included in v4.5 |
546 | Land Member into position using crane | Included in v4.5 |
547 | Lay brick pavers | Included in v4.5 |
548 | Lay Hebel panels into frames and grout into position | Included in v4.5 |
549 | Laying asphalt with paver which is filled from tipper | Included in v4.5 |
550 | Laying blue metal paver which is filled from tipper | Included in v4.5 |
551 | Laying floor tiles | Included in v4.5 |
552 | Laying wall tiles | Included in v4.5 |
553 | Lead based paint removal using Peel away Paint Removal System | Included in v4.5 |
554 | Level racking and bolt to slab | Included in v4.5 |
555 | Lift members into position by hand | Included in v4.5 |
556 | Lift Car Installation and Fit Out | Included in v4.5 |
557 | Lift Installation | Included in v4.5 |
558 | Lift member using a forklift and lifting jib | Included in v4.5 |
559 | Lift Shaft Fit out | Included in v4.5 |
560 | Lift shaft rail installation into Masonry shaft | Included in v4.5 |
561 | Lifting materials using duct lifters | Included in v4.5 |
562 | Lifting members using a chain block | Included in v4.5 |
563 | Lining of the Truck with Plastic Lining | Included in v4.5 |
564 | Listening to music while working | Included in v4.5 |
565 | Load bricks onto scaffold by hand | Included in v4.5 |
566 | Load materials into boom lift | Included in v4.5 |
567 | Load skid steer excavator onto truck/ trailer using aluminium ramps | Included in v4.5 |
568 | Load skid steer loader onto trailer using aluminium ramps | Included in v4.5 |
569 | Load skid steer loader onto truck using aluminium ramps | Included in v4.5 |
570 | Load stump grinding machine onto trailer using aluminium ramps | Included in v4.5 |
571 | Load Tractor/ ride on lawnmower onto trailer using aluminium ramps | Included in v4.5 |
572 | Loading ad dragging bags of waste to bin or vehicle | Included in v4.5 |
573 | Loading Louvre members onto roof using a crane | Included in v4.5 |
574 | Loading Materials onto roof using an EWP | Included in v4.5 |
575 | Loading materials onto truck by hand | Included in v4.5 |
576 | Loading materials onto truck using a crane and by hand | Included in v4.5 |
577 | Loading Roof Sheets or materials with Crane | Included in v4.5 |
578 | Lower materials to ground with ropes | Included in v4.5 |
579 | Lowering and raising spuds | Included in v4.5 |
580 | Manually lift panel into position | Included in v4.5 |
581 | Manually lower installed rack frames to the ground | Included in v4.5 |
582 | Manufacture Steel Stud Wall Frames | Included in v4.5 |
583 | Manufacture timber wall frames using a mitre saw and an Impulse (gas) Nail Gun | Included in v4.5 |
584 | Manufacture timber wall frames using a mitre saw and Pneumatic (Air) Nail Gun | Included in v4.5 |
585 | Manufacture/ build Steel Stud Wall Frames on site | Included in v4.5 |
586 | Mark out slab using a chalk line | Included in v4.5 |
587 | Mark out studwork for trimmer and fixture locations | Included in v4.5 |
588 | Marking Out Slab or Ground | Included in v4.5 |
589 | Measure and mark out for system installation | Included in v4.5 |
590 | Measure for cladding above roof | Included in v4.5 |
591 | Measure perimeter of house | Included in v4.5 |
592 | Measure Roofing using temporary Anchor Points | Included in v4.5 |
593 | Mix acrylic render in a bucket using an electric drill | Included in v4.5 |
594 | Mix adhesive in a bucket using an electric drill | Included in v4.5 |
595 | Mix concrete in a wheel barrow | Included in v4.5 |
596 | Mix grout in a bucket using an electric drill | Included in v4.5 |
597 | Mix mortar in a wheel barrow | Included in v4.5 |
598 | Mixing Adhesive/ Mortar/ Render/ Cement based products with an electric drill | Included in v4.5 |
599 | Mixing cement with a portable electric mixer | Included in v4.5 |
600 | Mixing cement with a portable petrol powered mixer | Included in v4.5 |
601 | Mixing cement/ mortar with a portable gasoline powered mixer | Included in v4.5 |
602 | Mixing cement/ mortar with a portable petrol powered mixer | Included in v4.5 |
603 | Mixing concrete with a portable mixer | Included in v4.5 |
604 | Mixing Polyurethane Isocyanate in a bucket using an electric drill | Included in v4.5 |
605 | Monitoring and review of JHA | Included in v4.5 |
606 | Monitoring and Review of SWMS | Included in v4.5 |
607 | Mopping Floor | Included in v4.5 |
608 | Mount condensing unit onto preinstalled Unistrut brackets | Included in v4.5 |
609 | Move materials using a trolley (sack Truck) | Included in v4.5 |
610 | Move soil by hand using a shovel | Included in v4.5 |
611 | Moving materials around on a trolley | Included in v4.5 |
612 | Moving materials over the roof | Included in v4.5 |
613 | Mulching of garden waste using a gasoline powered mulcher | Included in v4.5 |
614 | Mulching of garden waste using a petrol-powered mulcher | Included in v4.5 |
615 | Mulching of trees and branches using a Brush/ Wood Chipper | Included in v4.5 |
616 | Mulching of trees and branches using a Brush/ Wood Chipper (extended version) | Included in v4.5 |
617 | Mustering using Off Road and 4WD vehicles | Included in v4.5 |
618 | Nail timber using a pneumatic (Air) nail gun | Included in v4.5 |
619 | Nail timber using an Impulse (gas) Nail Gun | Included in v4.5 |
620 | New-Roofing (Domestic) | Included in v4.5 |
621 | on site Servicing to diesel powered vehicle | Included in v4.5 |
622 | On site Servicing to gasoline powered vehicle | Included in v4.5 |
623 | on site Servicing to petrol powered vehicle | Included in v4.5 |
624 | Open engine cover/ bonnet/ service compartment | Included in v4.5 |
625 | Operation of drilling rig and soil sampling | Included in v4.5 |
626 | Painting of ceilings | Included in v4.5 |
627 | Painting of walls | Included in v4.5 |
628 | Painting of Walls and Ceilings | Included in v4.5 |
629 | Painting with an electric airless sprayer | Included in v4.5 |
630 | Part demolition of existing brick wall to form new opening | Included in v4.5 |
631 | Passing up Roof Sheets and Accessories from the ground | Included in v4.5 |
632 | Passing up Sheets and Accessories from the ground | Included in v4.5 |
633 | Patrol of Student Accommodation Facility | Included in v4.5 |
634 | Pesticide spraying by hand | Included in v4.5 |
635 | Photocopying | Included in v4.5 |
636 | Pick up filled skip bin | Included in v4.5 |
637 | Pigeon Hole Rack Assembly (Complete Job) | Included in v4.5 |
638 | Pipe freezing using liquid nitrogen | Included in v4.5 |
639 | Place copper pipes into trench ducting | Included in v4.5 |
640 | Place rubble around domestic site using a skid steer loader | Included in v4.5 |
641 | Place steel reinforcing in footing | Included in v4.5 |
642 | Place steel reinforcing mesh | Included in v4.5 |
643 | Place tile onto mortar bed and trowel off | Included in v4.5 |
644 | Placing a cement screed | Included in v4.5 |
645 | Placing Concrete | Included in v4.5 |
646 | Planning for wet weather and flooding events | Included in v4.5 |
647 | Planting of trees and shrubs by hand | Included in v4.5 |
648 | Plug the unit into the power supply outlet | Included in v4.5 |
649 | Plumb Lift Shaft | Included in v4.5 |
650 | Plumbing final fit | Included in v4.5 |
651 | Position floor boards together using a plank jack/ floor dog | Included in v4.5 |
652 | Pour Polyurethane Isocyanate into pipe duct | Included in v4.5 |
653 | Pouring Concrete | Included in v4.5 |
654 | Pouring Concrete Slab using a pump and a helicopter | Included in v4.5 |
655 | Preparation and installation of synthetic turf | Included in v4.5 |
656 | Prepare and lay brick pavers | Included in v4.5 |
657 | Pressure testing of hot and cold pipework | Included in v4.5 |
658 | Pressure testing of pipework with nitrogen and charge with refrigerant (HCFC) | Included in v4.5 |
659 | Project Risk Assessment | Included in v4.5 |
660 | Prune branches using hand operated extendable pore pruner or pole saw | Included in v4.5 |
661 | Pruning with Hand Pruners/ Shears (Secateurs) | Included in v4.5 |
662 | Pump out domestic septic tank using a vacuum truck | Included in v4.5 |
663 | Pump out grease trap tank using a vacuum truck | Included in v4.5 |
664 | Pump out waste milk using a vacuum truck | Included in v4.5 |
665 | Push Wheel Barrow on site | Included in v4.5 |
666 | Put on Harness and set up ropes | Included in v4.5 |
667 | Raising Sewer/ Stormwater Pits and Valve covers in an existing bitumen roadway | Included in v4.5 |
668 | Re-bed tiled roof ridge capping | Included in v4.5 |
669 | Reclaim refrigerant gas from existing system | Included in v4.5 |
670 | Re-fall box gutter | Included in v4.5 |
671 | Refrigerant charge the system using a vacuum pump | Included in v4.5 |
672 | Refuelling of machinery | Included in v4.5 |
673 | Refurbishment of residence/ unit | Included in v4.5 |
674 | Remediation of asbestos contaminated soil by hand and using general hand tools | Included in v4.5 |
675 | Removal and Replacement of gantry crane radio control unit | Included in v4.5 |
676 | Removal of asbestos adhesive from hard surface | Included in v4.5 |
677 | Removal of Asbestos products | Included in v4.5 |
678 | Removal of Ceiling Sheets | Included in v4.5 |
679 | Removal of Existing (Flat Roof)- Roof Sheeting | Included in v4.5 |
680 | Removal of existing Blanket insulation | Included in v4.5 |
681 | Removal of existing Box Gutter | Included in v4.5 |
682 | Removal of existing ceiling flashings | Included in v4.5 |
683 | Removal of existing Ceiling Insulation from open roof | Included in v4.5 |
684 | Removal of existing doors | Included in v4.5 |
685 | Removal of existing roof flashings | Included in v4.5 |
686 | Removal of existing Roof Sheeting and Accessories | Included in v4.5 |
687 | Removal of existing roof tiles | Included in v4.5 |
688 | Removal of Existing RWH | Included in v4.5 |
689 | Removal of liquid waste milk | Included in v4.5 |
690 | Removal of materials from roof area by hand - Using EWP | Included in v4.5 |
691 | Removal of Steel Members by hand using EWP | Included in v4.5 |
692 | Removal of temporary fencing | Included in v4.5 |
693 | Removal of wall sheeting | Included in v4.5 |
694 | Removal/ demolition of existing suspended exposed grid ceiling | Included in v4.5 |
695 | Remove all materials | equipment and waste from site |
696 | Remove and fit attachments on Excavator | Included in v4.5 |
697 | Remove and fit attachments on skid steer loader | Included in v4.5 |
698 | Remove and reinstate Dektites | Included in v4.5 |
699 | Remove and Reinstate Roof Screws | Included in v4.5 |
700 | Remove and reinstate Skylight sheeting | Included in v4.5 |
701 | Remove and replace wheels using a pneumatic rattle gun | Included in v4.5 |
702 | Remove asbestos clothing | Included in v4.5 |
703 | Remove bag from bins and waste paper baskets | Included in v4.5 |
704 | Remove existing grout between tiles | Included in v4.5 |
705 | Remove existing silicone | Included in v4.5 |
706 | Remove existing suspended ceiling tiles | Included in v4.5 |
707 | Remove existing wall mounted unit | Included in v4.5 |
708 | Remove horizontal racking beams from a scissor lift | Included in v4.5 |
709 | Remove horizontal racking beams from ground | Included in v4.5 |
710 | Remove nuts using a battery powered rattle gun | Included in v4.5 |
711 | Remove rubbish and debris from domestic site using skid steer loader and truck | Included in v4.5 |
712 | Remove screws using a battery powered drill | Included in v4.5 |
713 | Remove soil from domestic site using a skid steer loader and truck | Included in v4.5 |
714 | Remove spoil from auger using wheel barrow | Included in v4.5 |
715 | Removing friable asbestos by hand | Included in v4.5 |
716 | Removing friable asbestos-contaminated soil by hand and using an excavator | Included in v4.5 |
717 | Removing non friable asbestos by hand | Included in v4.5 |
718 | Removing non-friable asbestos-contaminated soil by hand and using an excavator | Included in v4.5 |
719 | Rendering/ solid plastering | Included in v4.5 |
720 | Repeat the above process steps until completion of task | Included in v4.5 |
721 | Replace air filter | Included in v4.5 |
722 | Replace brake pads using a pneumatic rattle gun | Included in v4.5 |
723 | Replace broken roof tiles | Included in v4.5 |
724 | Replace diesel fuel filters | Included in v4.5 |
725 | Replace engine oil and filters | Included in v4.5 |
726 | Replace existing light fittings | Included in v4.5 |
727 | Replace fuel filters | Included in v4.5 |
728 | Replace hydraulic hose | Included in v4.5 |
729 | Replace hydraulic oil and filters | Included in v4.5 |
730 | Replace petrol fuel filters | Included in v4.5 |
731 | Replace radiator coolant | Included in v4.5 |
732 | Replacement of ducted system air conditioner | Included in v4.5 |
733 | Replacement of wall hung split system air conditioner | Included in v4.5 |
734 | Repointing of ridge tiles | Included in v4.5 |
735 | Re-Roofing | Included in v4.5 |
736 | Rewire in conduits between light fittings | Included in v4.5 |
737 | Roof Plumbing Servicing and Maintenance | Included in v4.5 |
738 | Routine Inspection of 2 post vehicle hoist | Included in v4.5 |
739 | Routine Inspection of 4 post vehicle hoist | Included in v4.5 |
740 | Routine Inspection of scissor lift vehicle hoist | Included in v4.5 |
741 | Run and Connect Static Line Cable | Included in v4.5 |
742 | Run Cables and secure to catenary cable | Included in v4.5 |
743 | Run Cables through existing ceiling space | Included in v4.5 |
744 | Run connecting copper pipework and fit off | Included in v4.5 |
745 | Run copper plumbing pipework and fit off | Included in v4.5 |
746 | Run Pipe work and cables through existing ceiling space | Included in v4.5 |
747 | Run Pipe work through existing ceiling space | Included in v4.5 |
748 | Run plastic water/ gas pipework and fit off | Included in v4.5 |
749 | Safety check and operation of Excavator | Included in v4.5 |
750 | Safety check and operation of Excavator for clearing and grubbing | Included in v4.5 |
751 | Safety check and operation of Excavator for demolition works | Included in v4.5 |
752 | Safety check and operation of Excavator for trenching and excavations | Included in v4.5 |
753 | Safety Check And Use Of Boom Lift (extended version) | Included in v4.5 |
754 | Safety Check And Use Of Scissor Lift (Extended version) | Included in v4.5 |
755 | Safety inspection and use of firearms for hunting | Included in v4.5 |
756 | Safety inspection and use of Forklift | Included in v4.5 |
757 | Safety Inspection and use of Horizontal Grinder | Included in v4.5 |
758 | Safety Inspection and use of Hydraulic Harvester Head attachment | Included in v4.5 |
759 | Safety Inspection and use of Hydraulic Rock Breaker | Included in v4.5 |
760 | Safety Inspection and use of Hydraulic Shear attachment | Included in v4.5 |
761 | Safety inspection and use of skid steer loader | Included in v4.5 |
762 | Safety inspection and use of TTL Hydraulic Torque Wrench and hydraulic pump | Included in v4.5 |
763 | Safety inspection and use of TTS Hydraulic Torque Wrench and hydraulic pump | Included in v4.5 |
764 | Safety inspection and use of TTX Hydraulic Torque Wrench and hydraulic pump | Included in v4.5 |
765 | Safety inspection and use of wheeled front end loader | Included in v4.5 |
766 | Sanding of finished drywall by hand | Included in v4.5 |
767 | Sanding of flushed joints by hand | Included in v4.5 |
768 | Sanding of flushed joints using an electric drywall / plasterboard sander | Included in v4.5 |
769 | Screed sand | Included in v4.5 |
770 | Screw fence sheets to rail using a battery powered drill | Included in v4.5 |
771 | Screw fixing wall sheeting from platform ladder | Included in v4.5 |
772 | Secure conduits to structure with saddles | Included in v4.5 |
773 | Secure pipework to structure with saddles | Included in v4.5 |
774 | Secure W45 Brass male lugged elbows | breaching pieces and mixers |
775 | Selection and Use of PPE | Included in v4.5 |
776 | Service and replacement of TMV in masonry wall | Included in v4.5 |
777 | servicing a ride on electric sweeper (Complete Job) | Included in v4.5 |
778 | servicing a walk gas operated behind sweeper/scrubber (Complete Job) | Included in v4.5 |
779 | Servicing to hybrid industrial automatic ride on sweeper/scrubber | Included in v4.5 |
780 | Servicing to hybrid industrial automatic ride on sweeper/scrubber (Complete job) | Included in v4.5 |
781 | Servicing to vehicle in workshop | Included in v4.5 |
782 | Set up and use laser level | Included in v4.5 |
783 | Set up mortar bed formwork frame | Included in v4.5 |
784 | Set up mortar boards | Included in v4.5 |
785 | Set up Profolds to corners | Included in v4.5 |
786 | Set up trestle scaffold | Included in v4.5 |
787 | Silver solder copper pipes together | Included in v4.5 |
788 | Site orientation of domestic residence | Included in v4.5 |
789 | Site Orientation/ Induction | Included in v4.5 |
790 | Site Set Out | Included in v4.5 |
791 | Sleeve and apply silicone around pipework passing trough holes | Included in v4.5 |
792 | Spray PVA Glue with an electric airless sprayer | Included in v4.5 |
793 | Spread rubble around site using a skid steer loader | Included in v4.5 |
794 | Spreading fertilizer and manure | Included in v4.5 |
795 | Spreading mulch by bucketing and spreading with shovel and rake | Included in v4.5 |
796 | Spreading soil with Shovel and Rake | Included in v4.5 |
797 | Stand up clad walls | Included in v4.5 |
798 | Stand up cool room panels and fit into bottom track | Included in v4.5 |
799 | Stand up pre-assembled rack frames | Included in v4.5 |
800 | Stand up pre-assembled rack frames using a Forklift and Rack Frame Lifting Jib | Included in v4.5 |
801 | Stand up wall frames | Included in v4.5 |
802 | Steam cleaning of tiles | Included in v4.5 |
803 | Stripping formply | Included in v4.5 |
804 | Stump Grinding | Included in v4.5 |
805 | Sweeping Floor or ground | Included in v4.5 |
806 | Sweeping sand over pavers and into cracks | Included in v4.5 |
807 | Tack coating (including use of hand lance) prior to laying asphalt | Included in v4.5 |
808 | Tension nuts using a battery powered rattle gun | Included in v4.5 |
809 | Test the electrical installation | Included in v4.5 |
810 | Test the propertys gas pipework for pressure leaks | Included in v4.5 |
811 | Thread pipe using a Portable Power Pipe Threader | Included in v4.5 |
812 | Tow and Position Barge | Included in v4.5 |
813 | Tracing and identifying existing live lighting circuits - for fault purposes | Included in v4.5 |
814 | Traffic control in night conditions | Included in v4.5 |
815 | Traffic control station set up and operation of traffic control (Stop/ slow bat) | Included in v4.5 |
816 | Trowel acrylic render onto surface | Included in v4.5 |
817 | Trowel cement to edges of pavers | Included in v4.5 |
818 | Tune engine | Included in v4.5 |
819 | Twin rope rescue via pick off and take to ground | Included in v4.5 |
820 | Undertake Clients general all sites induction | Included in v4.5 |
821 | Unload barge from truck to water with a mobile crane | Included in v4.5 |
822 | Unload glass from vehicle onto trolley | Included in v4.5 |
823 | Unload skid steer excavator from trailer using aluminium ramps | Included in v4.5 |
824 | Unload skid steer loader from trailer using aluminium ramps | Included in v4.5 |
825 | Unload skid steer loader from truck using aluminium ramps | Included in v4.5 |
826 | Unload stump grinding machine from trailer using aluminium ramps | Included in v4.5 |
827 | Unload tractor/ ride on lawnmower from trailer using aluminium ramps | Included in v4.5 |
828 | Unloading of shipping container with forklift and by hand | Included in v4.5 |
829 | Unpack fixtures/ materials | Included in v4.5 |
830 | Using a Harness and Static Line | Included in v4.5 |
831 | Using a pneumatic Jack Hammer/ pneumatic Breaker/ Demolition Hammer | Included in v4.5 |
832 | Using an Angle Grinder | Included in v4.5 |
833 | Using an electric Jack Hammer/ Electric Breaker/ Demolition Hammer | Included in v4.5 |
834 | Using an Existing roof anchor point system | Included in v4.5 |
835 | Using an Explosive Power Tool | Included in v4.5 |
836 | Vacuum | Included in v4.5 |
837 | Visual Inspection of Structure | Included in v4.5 |
838 | Wall and floor tiling to domestic residence | Included in v4.5 |
839 | Wash down brick wall | Included in v4.5 |
840 | Wash out bucket | Included in v4.5 |
841 | Wash out mixer | Included in v4.5 |
842 | Water ingress repair using XYPEX | Included in v4.5 |
843 | Welding cleats to existing structure with a portable electric welder | Included in v4.5 |
844 | Welding copper tube | Included in v4.5 |
845 | Welding with a portable Electric Welder | Included in v4.5 |
846 | Welding/ silver soldering copper pipes together | Included in v4.5 |
847 | Working at height from a boom lift | Included in v4.5 |
848 | Working at height from a scissor lift | Included in v4.5 |
849 | Working at heights - Generally | Included in v4.5 |
850 | Working beneath large fig trees | Included in v4.5 |
851 | Working in a confined space | Included in v4.5 |
852 | Working in an area with the risk of Coronavirus | Covid-19 |
853 | Working in ceiling space | Included in v4.5 |
854 | Working in Cold Conditions | Included in v4.5 |
855 | Working in High Wind Conditions | Included in v4.5 |
855 | Working in hot conditions | Included in v4.5 |
855 | Working in isolation | Included in v4.5 |
855 | Working in open trench | Included in v4.5 |
855 | Working in the rain | Included in v4.5 |
855 | Working in the water | Included in v4.5 |
855 | Working on a Barge | Included in v4.5 |
855 | Working on a work boat/ vessel | Included in v4.5 |
855 | Working on sloping/ steep ground | Included in v4.5 |
855 | Working outside in the sun | Included in v4.5 |
855 | Working where there is movement of powered mobile plant | Included in v4.5 |
855 | Working with silica and silica containing products | Included in v4.5 |
855 | Working with spikey plants | Included in v4.5 |
855 | Write up incident report | Included in v4.5 |